Loading...
ST9601-LR 990225 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 214/331-4395 CONCRETE PLACEMENT REPORT Mr. Robert Caudill Tiseo Paving DATE: 02/25/1999 3OB TITLE: Wrangler Drive P O Box 270040 REPORT NO: 44 CoppeI1, Texas Dallas, TX 75227 JOB NO: 985142 DESIGN USED: Lattimore, 4000 psi START UP TIME: 2:00 SA~VIPLING METHOD: ASTM~C172 ASTM C-31 BEAM ASTM ASTM TEMPERATURE TIME TIME OR CYL. TRUCK TICKET WATER CUBIC C143 C231 (F°) BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % MR AMB/CONC REMARKS -- 2:50 27 A-C Sta 18+00, manhole 142 74671 10 7.0 4.0 5.0 -- 79 REMARKS: Time On: 1:00 Time Off: 3:30 ~ Tec~'ia Tech. Time: 2.5 hrs. SIGNED: Trip Charge: 1 George Wooley, n ke cc: City of Coppell