Loading...
Villages of CC 6-LR 950526TB~iH~QUB, ,,Excettence by Experience" PO Box 92548 · Southleke, Texas 76092 · CON'O~LTZNG ENGINEERS IN: _nv~ ronmente[ Assessments Soils & Four. ti·ns Construction #eteriats Testing ComnercJot & Industrial Inspection (817) ~29-0281 DAILY CONSTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 05-26-95 DAY: Friday TIME: 9am-4pm CLIENT: Jim Sowell Construction CompCONTRACTOR: Glenn Thurman, Inc ACTIVITIES: , WEATHER: Ptly Cloudy LOW TEMP: 69F HIGH TEMP: 84F Travelled to job site, as requested, to make twelve (12) concrete test cylinders. Returned to office. SET #6 LOCATION: Compton Ct @ cul-de-sac SLUMP: 2.75" AIR: 5.1% TEMP: AT 79/CT 80 LOCATION: Graham Dr @ Station 3+75 SLUMP: 3.0" AIR: 4.8% TEMP: AT 80/CT 81 SET #8 LOCATION: Graham Dr @ Station 1+25 flLUMP: 2.5" AIR: 6.0% TEMP: AT 84/CT 82 TIME: 10:30am TIME: 1:30pm TIME: 2:30pm Brandon McKenzie Technician