Villages of CC 6-LR 950526TB~iH~QUB,
,,Excettence by Experience"
PO Box 92548 ·
Southleke, Texas 76092 ·
CON'O~LTZNG ENGINEERS IN:
_nv~ ronmente[ Assessments
Soils & Four. ti·ns
Construction #eteriats Testing
ComnercJot & Industrial Inspection
(817) ~29-0281
DAILY CONSTRUCTION REPORT
PROJECT: Villages at Cottonwood Creek LOCATION: Coppell
JOB #: 94-1200 DATE: 05-26-95 DAY: Friday TIME: 9am-4pm
CLIENT: Jim Sowell Construction CompCONTRACTOR: Glenn Thurman, Inc
ACTIVITIES: ,
WEATHER: Ptly Cloudy
LOW TEMP: 69F HIGH TEMP: 84F
Travelled to job site, as requested, to make twelve (12)
concrete test cylinders. Returned to office.
SET #6
LOCATION: Compton Ct @ cul-de-sac
SLUMP: 2.75" AIR: 5.1% TEMP: AT 79/CT 80
LOCATION: Graham Dr @ Station 3+75
SLUMP: 3.0" AIR: 4.8% TEMP: AT 80/CT 81
SET #8
LOCATION: Graham Dr @ Station 1+25
flLUMP: 2.5" AIR: 6.0% TEMP: AT 84/CT 82
TIME: 10:30am
TIME: 1:30pm
TIME: 2:30pm
Brandon McKenzie
Technician