Loading...
Villages C P3&4-CS 910423 DON A TIPTON, INC. CONSULTING ENGINEERS 3344/3345 ENGINEERING · SURVEYING · PLANNING 6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967 April 23, 1991 Ms. Shohre Daneshmond Engineering Department CITY OF ~3PPE[~. 255 Parkway Blvd. Coppell, Texas 75019 RE: VIT.T.%GES OF COPPRLL III & IV Coppell, Texas Dear Ms. Daneshmond: Our review of the existing Villages of Coppell I & II drainage criteria reveals that the systems were designed under the 100-year storm criteria with a runoff factor of 4.6. The Villages of Coppell Phases III & IV are being designed on a 100-year storm, using the City of Dallas design requirements with a runoff factor being 4.8. All inlet systems are designed in sag conditions and are able to handle the 100-year storm using a time of concentration of 10 minutes. Calculations also reveal the calculated time of concentration for all systems meet or exceed 15 minutes due to the starting point of the drainage basin and the discharge point of the existing systems. If there are any questions, or we can be of further service, please do noJL-hesitate to call. s~~erely, ~ / DON A. TInNed, INC._ ...... ~iivneSvice President PA: lc