ST9601-LR 990127 TEAM CONSULTANTS, INC.
2970 S. Walton Walker, Suite 101 Dallas, Texas 75211
2 14/331-4395
CONCRETE PLACEMENT REPORT
Mr. Robert Caudill DATE: 01/27/99 JOB TITLE: Wrangler Drive, Coppell Texas
Tiseo Paving REPORT NO: 38
P.O. Box 270040 JOB NO: 985142
Dallas, TX 75227
DESIGN USED: -- START UP TIME: ....
SAMPLING METHOD USED: ASTM-C172
ASTM C-31 ASTM ASTM TEMPERATURE
TIME TIME BEAM OR CYL. TRUCK TICKET WATER CUBIC C-143 C-231 (F°)
BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % AIR AMB/CONC REMARKS
REMARKS: A trip was made to the project site to test the concrete scheduled for placement at 3:00.
After arriving on the project site the contractor could not be found. Cylinder molds were left on site and I returned to laboratory.
Time On: 2:30
Time Off.' 3:30
Tech. Time: 1.0 hr. SIGNED: ~"Jq--4_/c/,.~ ~ ~
Trip Charge: 1 ~//Jeremiah Berry, Technician
mh
cc: City of Coppell/Larry Davis