Loading...
ST9601-LR 990127 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 75211 2 14/331-4395 CONCRETE PLACEMENT REPORT Mr. Robert Caudill DATE: 01/27/99 JOB TITLE: Wrangler Drive, Coppell Texas Tiseo Paving REPORT NO: 38 P.O. Box 270040 JOB NO: 985142 Dallas, TX 75227 DESIGN USED: -- START UP TIME: .... SAMPLING METHOD USED: ASTM-C172 ASTM C-31 ASTM ASTM TEMPERATURE TIME TIME BEAM OR CYL. TRUCK TICKET WATER CUBIC C-143 C-231 (F°) BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % AIR AMB/CONC REMARKS REMARKS: A trip was made to the project site to test the concrete scheduled for placement at 3:00. After arriving on the project site the contractor could not be found. Cylinder molds were left on site and I returned to laboratory. Time On: 2:30 Time Off.' 3:30 Tech. Time: 1.0 hr. SIGNED: ~"Jq--4_/c/,.~ ~ ~ Trip Charge: 1 ~//Jeremiah Berry, Technician mh cc: City of Coppell/Larry Davis