Loading...
Villages C P3&4-CS 910611GRAND HOMES June 11, 1991 Ms. Shohre Daneshmond City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: VII.!.AGES OF COPPELL 3-A COPPEI.I, TEXAS Dear Ms. Daneshmond: As requested, we are hereby committing to the following items in reference to the above mentioned project. 1. -. Prior to City Acceptance of Villages of Coppell 3-A, an earthen channel will be constructed adjacent to Phase 3-B, discharging into Denton Creek. This plan will be prepared by Don A. Tipton, Inc. and approved by the City of Coppell. However, if Phase 3-B plans have been approved and construction is underway on Phase 3-B, the above mentioned channel will not be required. 2. No building permits will be allowed on Lots 8 through 15 of Block A until the Floodplain~'~ Study, prepared by Don A. Tipton, Inc., has been approved by the City of Coppell Engineerin~,~/" Department. We appreciate your attention in regard to these matters .... Very truly yours, ~ard D. Toole Vice President EDT/kld 8800 N. Central Expressway, Suite 330, Dallas, Texas 75231 (214)750-6528 Fax (214)750-6849