Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950203
TBC~I~Qn, .Excel tence by Experience" PO Box 92548 * Southlske, Texas 76092 · CON~,~t,T'rNG ENGINEERS 'tN: .eiror~entat Assessments Soils & Foundations Construction #ateriats Testing Commercial & Industrial Inspection (817) t29-0281 FIELD COMPACTTON REPORT PROJECT: Villages at .Cottonwood Creek LOCATION: Coppell JOB #: 94-1200 DATE: 02-03-95 D~Y: Friday TIME: 12: 30pm CLIENT: Jim Sowe11 Construction Comp CONTRACTOR: Site Concrete IFATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block A: 1. @ Lot 40 1st Lift 3 17.8 103.7 98.0 2. @ Lot 39 2nd Lift 3 17.2 104.3 98.5 3. @ Lot 38 1st Lift 1 18.7 102.9 98.3 4. @ Lot 37 2nd Lift 3 18.2 103.1 97.4 Block E: 5. @ Lot 19 2nd Lift 3 18.0 103.6 97.9 6. @ Lot 18 1st Lift i 18.9 100.5 96.0 7. @ Lot 17 2nd Lift 3 18.4 103.7 98.0 8. @ Lot 16 1st Lift 1 18.5 102.2 97.7 9. @ Lot 15 2nd Lift 3 17.9 104.2 98.4 10. @ Lot 14 1st Lift 3 18.6 103.0 97.3 R~KS: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Brown & Tan Sandy Clay 3. Dark Brown Sandy Clay 104.6 PCF @ 17.6% MOISTURE 105.8 PCF @ 17.0% MOISTURE Shane Robinson Technician