Loading...
Villages of CC 6-LR 950113GBO- ,,Excellence by Experience" PO Box 92548 · South[ake, Texas ?6092 CON~.,TING ENGINEERS ZN: /;~ romtenta t Assessments SoJ~s & Foundations Cons~ructJon gatertets Testing Commerc~at & IndustrJat Inspection (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Villages at Cottonwood Creek JOB ~: 94-1200 DATE: 01-13-95 DAY: Friday LOCATION: Coppell TIME: 3:00pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Site Concrete WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block A: 1. @ Lot 25 3rd Lift i 18.6 102.3 97.8 2. @ Lot 27 3rd Lift i 19.1 101.6 97.1 3. @ Lot 29 3rd Lift i 18.3 102.8 98.2 Alley A: 4. @ Station 14+00 1st Lift 3 19.3 102.4 96.7 5. @ Station 14+00 2nd Lift 3 18.9 102.9 97.2 REMARK8: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Brown & Tan Sandy Clay 2. Tan & Brown Fine Silty Sand 3. Dark Brown Sandy Clay 104.6 PCF @ 17.6% MOISTURE 107.1 PCF @ 10.0% MOISTURE 105.8 PCF @ 17.0% MOISTURE Shane Robinson Technician