Loading...
ST9601-LR 980729 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas 7521 i 214/331-4395 CONCRETE PLACEMENT REPORT Mr. Robert Caudill DATE: 07/29/98 JOB TITLE: Wrangler Drive Tiseo Paving REPORT NO.: 17 Coppell PO Box 270040 JOB NO.: 985142 Dallas, Texas 75227 DESIGN USED: Lattimore, 3000 psi START UP TIME: 6:30 SAMPLING METHOD: ASTM C-172 ASTM C-31 ASTM ASTM TEMPERATURE TIME TIME BEAM OR CYL. TRUCK TICKET WATER CUBIC C-143 C-231 (F°) BATCHED UNLOADED SET NOS. LOCATION NO. NO. ADDED YARDS SLUMP % AIR AMB/CONC REMARKS -- 6:50 I 1 A-E Sta. 8+50, Wrangler Drive 140 7055394 0 9.0 4.50 2.0 -- 92 -- 7:00 ........ 0 .... 4.2 -- 92 -- 8:30 12 A-E Sta. 7+00, Wrangler Drive 142 70554 i 5 0 9.0 4.50 3.2 -- 92 -- I 1:30 13 A-E Sta. 4+00 .... 0 -- 6.00 3.4 -- 94 REMARKS: Dallas Batch Plant broke down. Trucks were sent to Coppell Plant. Trucks arrived at job site every 30 minutes. Contractor shut job down at 12:00 noon. Time On: 5:00 Time Off: 1:30 //~~/z~ff Tech. Time: 8.5 hrs. SIGNED: ~-~7 Trip Charge: I Ocie Pritchett, Technician Iw cc: City of Coppell/Larry Davis