Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC 6-LR 950111
"Excel Lence by Experience" PO Box 92548 · SouthLake, Texas 76092 CON~LTING ENGINEER8 IN: )vi ronmentaL Assessments Sol Is & Foundations Construction Materials Testing Commercial & Industrial Inspection (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB ~: 94-1200 DATE: 01-11-95 DAY: Wednesday TIME: l:30pm CLIENT: Jim Sowell Construction Comp CONTRACTOR: Site Concrete #ATRR DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block B: 1. @ Lot 9 2. @ Lot 11 3. @ Lot 13 4. @ Lot 15 5. @ Lot 10 6. @ Lot 12 7. @ Lot 14 8. @ Lot 16 9. @ Lot 1 10. @ Lot 8 1st Lift i 18.8 102.6 98.0 1st Lift i 17.4 102.8 98.2 1st Lift i 17.0 101.7 97.2 1st Lift 3 16.1 103.8 98.1 2nd Lift 3 17.7 103.3 97.6 2nd Lift 2 11.4 105.7 98.6 2nd Lift 2 11.6 104.8 97.8 2nd Lift 2 10.7 105.1 98.1 1st Lift 1 16.4 100.9 96.4 1st Lift 1 16.8 101.3 96.8 REMARKS: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Brown & Tan Sandy Clay 2. Tan & Brown Fine Silty Sand 3. Dark Brown Sandy Clay 104.6 PCF @ 17.6% MOISTURE 107.1 PCF @ 10.0% MOISTURE 105.8 PCF @ 17.0% MOISTURE Patrick Corbett Technician