Loading...
Villages of CC P5-LR 970224~QUe nviro~ntaL Assessments ~ll~. SoiLs & Foundations Construction HateriaLs Testing "ExceLLence byExperience" Commercial & Industrial Inspection PO Box 92548 · SouthLake, Texas 70092 · (817) 329-0281 DAILY CONSTRUCTION REPORT PROJECT: Villages of Cottonwood Creek V LOCATION: Coppell JOB #: 96-1779 DATE: 02-24-97 DAY: Monday TIME: 2pm-4pm CLIENT: Grand Land 96, L.P. CONTRACTOR: Site Concrete ACTIVITIES: WEATHER: Overcast LOW TEMP: 46F HIGH TEMP: 52F Travelled to job site, as requested, to make pick up twelve (12) concrete test cylinders made on 02-17-97 (four (4) of which were made by contractor). Returned to office. Chris Quentin Technician ~lt)-- '-~ CON~.LTING EN~INEER8 IN= T~O~XQUe ,vironlnenta[ Assess;ants ~1~, SoiLs & Foundations Construction Nateciats Testing ,'Exce[t~ce~ri~e'" C~rciat & i~ustria[ [ns~ction PO Box 925&8 * S~thiake, Texas 76~2 · (817) ~29-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Villages at Cottonwood Creek V LOCATION: Coppell JOB ~: 96-1779 DATE OF BREAK: 02-24-97 DAY: Monday CLIENT: Grand Land 96, L.P. CONTRACTOR: Site Concrete CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Bricknell Lane North: 4A @ Station 7+00 2.50" 02-17-97 7 84,000 2971 4B @ Station 7+00 2.50" 02-17-97 7 83,500 2954 6A @ Station 1+50, 02-17-97 7 85,500 3024 6B @ Station 1+50' 02-17-97 7 84,500 2989 Eastwick Dr, S Lane: 5A @ Station 0+80 2.75" 02-17-97 7 82,500 2918 5B @ Station 0+80 2.75~' 02-17-97 7 85,000 3007 * Contractor Made SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Pioneer Jeffrey Holden Technician