Loading...
Villages C P3&4-CS 920122 DON A TIPTON, 'Engineering CONSULTING ENGINEERS 3 3 4 4 ENGINEERING · SURVEYING · PLANNING 6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967 January 22, 1992 Ms. Shohre Daneshmond CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 RE: V/'T.T.~GES OF COPPELL PHASE 3-B Coppell, Texas Dear Ms. Daneshmond: Please find enclosed seven (7) revised sets of engineering plans for City stamping as requested. We have completed the following revisions. 1. Added visibility easements to the Final Plat. 2. Added three 30" pipes with headwalls crossing DeForest and connecting to the proposed 54" pipe. (Sheet 9) 3. Revised slope from 2:1 to 3:1 and increased height of wall from 3' to 4 1/2'. (Sheet 10) 4. Revised meter detail. (Sheet SD-16) If there are any questions or we can be of fqrther service, please do not hesitate to call. Sincerely, DON A. TIPTON, INC. /~//D/ Robert Porter Project Manager xc: Mr. Edward D. Toole, III ~- .By:..Engigeering- E INC. DON A TIPTON, INC. CONSULTING ENGINEERS 3 3 4 4 ENGINEERING * SURVEYING * PLANNING 6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967 January 22, 1992 Ms. Shohre Daneshmond CITY OF COPPE~.?. 255 Parkway Boulevard Coppell, Texas 75019 RE: VIT.IAGRS OF COPPELL P~ASES 3A GABION SLOPE PROTECTION Coppell, Texas Dear Ms. Daneshmond: Please find enclosed seven (7) sets of plans for City stamping which include the following revisions. 1. The 2% construction impact fees will be paid prior to construction and at the appropriate time.  2. The property owners of each lot will be maintaining the gabion construction and have been formally notified by the developer of their responsibility. 3.We have included a signed copy of the flood plain development permit. 4. We are in the process of obtaining the slope stability and foundation analysis from the geotechnical engineer and will~' submit them to you as soon as possible. If there are any questions or we can be of further service, please/ do not hesitate to call. ly Sincere , Project Manager RP: lc xc: Mr. Edward D. Toole, III