February 10, 1992
City of Coppell
Mr. Ken Griffin
255 Parkway Blvd
Coppell, TX 75019
Dear Mr. Griffin:
Please find enclosed the revised floodplain study for your review
and approval. A copy has also been submitted to Ron Morrison.
If there are any questions or we can be of further service, please
do not hesitate to call.
Sincerely,
Project Manager
RP: ce
DON A TIPTON,
CONSULTING ENGINEERS 3344,3345
ENGINEERING · SURVEYING · PLANNING
6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967
February 7, 1992
(
Mr. Ron Morrison
MORRI$ON HYDROLOGY/ENGINEERING, INC
520 Avenue H East
Suite 102
Arlington, TX 76011
RE: VIT.T~GES OF COPPELL 3 & 4 FLOODPLAIN RECLAMATION
COPPRI.L, TX
Dear Mr. Morrison:
Enclosed please find a revised copy of the floodplain reclamation
plan for your approval with the following revisions:
1. Omitted the increases in the water surface elevations
for Denton Creek and Elm Fork.
2. Added the floodway line to the plans showing that no
floodway encroachment exists.
3. Revised the location of the floodplain line based on the
latest Fema FIS Revision.
4. Enclosed a copy of a letter from the Corps of Englneer~
stating that a 404 Permit would not be required for this
project.
5. Completed all items requested based on the FEMA
checklist.
6. Revised the X-Sections showing fill extending past the
property line - A retaining wall will be constructed.
7. Added a cross section showing the proposed gabion slope
protection along Denton creek.
Page 2
Ron Morrison
February 7, 1992
Please call if you have any questions regarding this project. Your
earliest approval of the study would be greatly appreciated.
Sincerely,
Project Manager
RP: ce
Enclosures~
cc: Ken Griffin, City of Coppell