Loading...
Villages C P3&4-CS 920210 DON A TIPTON, INC er: Engineering CONSULTING ENGINEERS 3 3 4 5 ENGINEERING * SURVEYING * PLANNING 6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967 February 10, 1992 City of Coppell Mr. Ken Griffin 255 Parkway Blvd Coppell, TX 75019 Dear Mr. Griffin: Please find enclosed the revised floodplain study for your review and approval. A copy has also been submitted to Ron Morrison. If there are any questions or we can be of further service, please do not hesitate to call. Sincerely, Project Manager RP: ce DON A TIPTON, CONSULTING ENGINEERS 3344,3345 ENGINEERING · SURVEYING · PLANNING 6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967 February 7, 1992 ( Mr. Ron Morrison MORRI$ON HYDROLOGY/ENGINEERING, INC 520 Avenue H East Suite 102 Arlington, TX 76011 RE: VIT.T~GES OF COPPELL 3 & 4 FLOODPLAIN RECLAMATION COPPRI.L, TX Dear Mr. Morrison: Enclosed please find a revised copy of the floodplain reclamation plan for your approval with the following revisions: 1. Omitted the increases in the water surface elevations for Denton Creek and Elm Fork. 2. Added the floodway line to the plans showing that no floodway encroachment exists. 3. Revised the location of the floodplain line based on the latest Fema FIS Revision. 4. Enclosed a copy of a letter from the Corps of Englneer~ stating that a 404 Permit would not be required for this project. 5. Completed all items requested based on the FEMA checklist. 6. Revised the X-Sections showing fill extending past the property line - A retaining wall will be constructed. 7. Added a cross section showing the proposed gabion slope protection along Denton creek. Page 2 Ron Morrison February 7, 1992 Please call if you have any questions regarding this project. Your earliest approval of the study would be greatly appreciated. Sincerely, Project Manager RP: ce Enclosures~ cc: Ken Griffin, City of Coppell