Loading...
Villages C P3&4-CS 920305 MEMO TT~ Alan D. Ratliff, City Manager : ~z~K~nneth M. Griffin, P.E., City Engineer SUBJECT: Deforest Road Drainage Problem (Villages of Coppell Phase III-B) DATE: March 5, 1992 On February 11, 1992 I met with Don Tipton and Pat Atkins of Don Tipton Inc. Consulting Engineers. They had requested a meeting to discuss the City's requirement to install a 42" and 54" RCP on the south side of Deforest Drive as it parallels Villages of Coppell Phase III-B. This system ultimately discharges into Denton Creek. The main issue they raised was the fact that hydrologically the system does not accomplish what its intent is, i.e. to protect the people on the north side of Deforest Drive in a 100-year storm. Hydrologically, this system will not function during a 100-year event. The consulting engineer has indicated that he would like to pursue other options, i.e. some type of bar ditch or a wider bar ditch with the elimination of the alleys along Deforest Road or any other alternative which the City may wish to consider. This project has not currently been bid, but the preliminary cost estimate for this system is approximately $80,000. There is a drainage problem on the north side of Deforest Road, but the installation of a drainage system which does not properly f~nction would not protect those people. I would be happy to discuss this at your convenience. KMG/bd DEFOR I ~ ~ COUN~L MR~NG Feb. 2 5, 1992 2 ITRM NUMBS. ITEM CAPTION; Discussion of drainage system in Deforest Road (Villages of Coppell Phase III-B) SUBMITTED BY: / STAFF REP.: Kenneth M. Griffin, P.E. ~ ~67~'~e)OTHER 'P.:Uit' ,n§ineer EVALUATION OF ITEM: DATE: 2/17/92 On February 11, 1992 I met with Don Tipton and Pat Atkins of Don Tipton Inc. Consulting Engineers. They had requested a meeting to discuss the City's requirement to install a ~2" and 5~" ~CP on the south side of Deforest Drive as it parallels Villages of Coppel! Phase II~-B. This system ultimately discharges into Denton Creek. The main issue they raised was the fact that. hydrolo§ically the system does not accomplish what its intent is, i.e. to protect the people on the north side of Deforest Drive in a ~00-year storm. Hydrologically, this system will not function during a 100-year event. The consulting engineer has indicated that he would like to pursue other options, i.e. some t~pe of bar ditch or a wider bar ditch ~ith ~he elimination of ~he alleys along Deforest ~oad or any other alternative which the City may ~ish to consider. This project has not currently been bid, but the preliminary cost estimate for this system is approximately $80,000. There is a drainage proble~ on the north side of Deforest Road, but ~he installation of a drainage system which does not properly function would no~ protect those people. Staff will be available to presen~ this item and answer any questions which council may have. BUDGET AMT. AMT. ESTIMATED AMT +/- BUDGET FINANCIAL REVIEW BY COMMENTS: LEGAL REVIEW BY: REVIEWED BY CM: AGENDA REQUEST FORM REVISED 1/91