Villages C P3&4-CS 920305 MEMO
TT~ Alan D. Ratliff, City Manager
: ~z~K~nneth M. Griffin, P.E., City Engineer
SUBJECT: Deforest Road Drainage Problem (Villages of Coppell Phase III-B)
DATE: March 5, 1992
On February 11, 1992 I met with Don Tipton and Pat Atkins of Don Tipton
Inc. Consulting Engineers. They had requested a meeting to discuss the
City's requirement to install a 42" and 54" RCP on the south side of
Deforest Drive as it parallels Villages of Coppell Phase III-B. This
system ultimately discharges into Denton Creek. The main issue they
raised was the fact that hydrologically the system does not accomplish
what its intent is, i.e. to protect the people on the north side of
Deforest Drive in a 100-year storm. Hydrologically, this system will not
function during a 100-year event. The consulting engineer has indicated
that he would like to pursue other options, i.e. some type of bar ditch or
a wider bar ditch with the elimination of the alleys along Deforest Road
or any other alternative which the City may wish to consider. This
project has not currently been bid, but the preliminary cost estimate for
this system is approximately $80,000. There is a drainage problem on the
north side of Deforest Road, but the installation of a drainage system
which does not properly f~nction would not protect those people.
I would be happy to discuss this at your convenience.
KMG/bd
DEFOR
I ~ ~ COUN~L MR~NG Feb. 2 5, 1992 2 ITRM NUMBS.
ITEM CAPTION;
Discussion of drainage system in Deforest Road (Villages of Coppell
Phase III-B)
SUBMITTED BY: / STAFF REP.: Kenneth M. Griffin, P.E.
~ ~67~'~e)OTHER 'P.:Uit' ,n§ineer
EVALUATION OF ITEM: DATE: 2/17/92
On February 11, 1992 I met with Don Tipton and Pat Atkins of Don Tipton
Inc. Consulting Engineers. They had requested a meeting to discuss the
City's requirement to install a ~2" and 5~" ~CP on the south side of
Deforest Drive as it parallels Villages of Coppel! Phase II~-B. This
system ultimately discharges into Denton Creek. The main issue they
raised was the fact that. hydrolo§ically the system does not accomplish
what its intent is, i.e. to protect the people on the north side of
Deforest Drive in a ~00-year storm. Hydrologically, this system will
not function during a 100-year event. The consulting engineer has
indicated that he would like to pursue other options, i.e. some t~pe
of bar ditch or a wider bar ditch ~ith ~he elimination of ~he alleys
along Deforest ~oad or any other alternative which the City may ~ish
to consider. This project has not currently been bid, but the preliminary
cost estimate for this system is approximately $80,000. There is a
drainage proble~ on the north side of Deforest Road, but ~he installation
of a drainage system which does not properly function would no~ protect
those people.
Staff will be available to presen~ this item and answer any questions
which council may have.