Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC P5-LR 970131
G~O" ~ CONSULTING ENGINEERS IN: ~r~Q~e ?nviron~enta[ Assessments X~, Soils & Foundations Construction Haterials Testi~ "~ceLLe~e ~ Ex~ri~e" C~rcia[ & l~ustria[ Ins~ction PO Box 925~8 · South[eke, ~exas 760~2 · (817) ~-0281 LIMED SUBGRADE GRADATION REPORT PROJECT: Villages of Cottonwood Creek V LOCATION: Coppell JOB #: 96-1779 DATE: 01-31-97 DAY: Friday TIME: l:30pm CLIENT: Grand Land 96, L.P. CONTRACTOR: Site Concrete % PASSING % PASSING LOCATION i 1/2" SIEVE ~4 ~IEYE Alley 1: 1. @ Station 1+50 100.0% 63.4% Alley 3: 2. @ Station 2+00 100.0% 66.2% 3. @ Station 5+00 100.0% 67.5% Alley 4: 4. @ Station 1+00 100.0% 64.1% Alley 5: 5. @ Station 2+00 100.0% 68.2% 6. @ Station 5+00 100.0% 62.4% 7. @ Station 8+00 100.0% 71.3% Alley 6: 8. @ Station 1+00 100.0% 70.8% SPECIFICATIONS: 100.0% Passing 1-1/2" Sieve 60.0% Passing #4 Sieve REMARKS: Also collected (1) soil sample for Lime Treated Moisture-Density Relations #6 at same time. Chris Quentin Technician