Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages of CC P5-LR 970107
Q~:F- ~' ~O~'CtULT~N~ ENGZNEERB T~llr~ule~ -- Znvironmenta[ Assessments ~- Soits & Foundations Construction Materiats Testing "Exce[ience byExperience" Commercial & Industrial inspection PO Box 92548 · Southtske0 Texas 76092 * (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Villages of Cottonwood Creek V LOCATION: Coppell JOB #: 96-1779 DATE: 01-07-97 DAY: Monday TIME: 9:00am CLIENT: Grand Land 96, LP CONTRACTOR: Site Concrete WATER DRY PER- · EST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP 8" Water Line, Block C: 1. @ Lot 1 2nd Lift 2 18.3 106.5 95.7 2. @ Lot 1 FG 2 17.9 109.2 98.1 3. @ Lot 5 2nd Lift 2 19.3 107.6 96.7 4. @ Lot 5 FG 2 18.4 105.9 95.1 REMARKS: All tests passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS: 1. Reddish Brn Sandy Clay 112.4 PCF @ 11.6% MOISTURE 2. Brn Clayey Sand 111.3 PCF @ 17.2% MOISTURE 3. Dk Brn Silty Sandy Clay 104.4 PCF @ 18.2% MOISTURE 4. Reddish Brn Silty Sandy Clay 101.7 PCF @ 22.8% MOISTURE Chris Quentin Technician