Villages C P3&4-CS 920714 (2) Federal Emergency Management Agency
Washington, D.C. 20472 ~
(202) 646-3403
CERTIFIED MAIL IN REPLY REFER TO~
RETURN RECEIPT REQUESTED 316-AD/ACK
Mr. Don A. Tipton Date: July 14, 1992
Don A. Tipton, Inc. Case No.: 92-06-037R
6330 Belt Line Road RE: Villages of Coppell,
Suite C Phases 3 and 4
Garland, Texas 75043 Co,unity: City of Coppell,
Texas
Go~nunity No.l 480170
Dear Mr. Tipton~
This is to acknowledge receipt of additional data to proceed with our review
of, in support of, your request for a conditional Letter of Nap Revision
(LOMR) for the referenced project. Our review of the data submitted
indicates i'hat we have the mnimum data we need to continue our evaluation.
If we need additional data to complete our evaluation, or if delays are
encountered, we will notify you in writing within 30 days of the date of this
letter.
The initial fee is the minimtua charge for a ~eview of this type; additlonal
costs could be incurred during the course of our review. If additional fees
are required, we will notify you in writing. Any additional fees required
must be submitted before we can issue our determination concerning the
request for a conditional LOMR.
If fees are to be reimbursed and, during our review, we determine that the
total processing costs will exceed $1,500, we will notify you in writing of
the estimated total cost. In such cases, we cannot complete our review until
we receive your written authorization to proceed.
If you write to us about your request, please include the case number shown
above in your letter. If you have any questions about the status of your
request, please call Michael Baker Jr., Inc., our Technical Evaluation
Contractor, at (703) 960-8800, and ask for the Revisions Coordinator for your
state.
Sincerely,
William R. Locke
Chief, Risk Studies Division
Federal Insurance Administration