Loading...
Villages C P3&4-CS 920921TO: Greg Jones, Acting Building Official FROM: M. Shohre Daneshmand, P.E., Civil Engineer SUBJECT: Villages of Coppell, Phases III & IV DATE: September 21, 1992 Attached please find a copy of the conditional Letter of Map Revision (LOMR) we received from FEMA for the above referenced development, dated September 8, 1992. As you may recall, engineering staff had requested that no building permits be issued on certain lots in Villages of Coppell residential subdivisions. Based on the FEMA's conditional approval, we have no objections for issuance of building permits on the following lots, as related to floodplain management: *Villages of Coppell, Phase m (A & B) Lots 8, 9, 10, 11, 12, 13, 14, 15 - Block 'A' Lots 16, 17, 18, 19, 20, 21, 22, 23 - Block 'A' Lots 24, 25, 26, 27, 28, 29, 30 - Block 'A' Lots 31, 32, 33, 34, 35, 36, 37, 38, 39 - Block 'A' Lots 40, 41, 42, 43, 44, 45, 46 - Block 'A' It is important to note the actual floodplain map revision effective above lots are delayed until the City's Flood Insurance Rate Map (FIRM) became effective in 1993, as per the attached FEMA letter. In the meantime, according to the City's effective FIRM, dated October 16, 1991, purchase of flood insurance may be required. Please inform the builder(s) of this issue. Elevation certificates (EC) are required for all lots as noted above. Attached please find an additional EC copy for your use. If you have any questions, please let me know. cc: Kenneth M. Griffin, P.E., City Engineer Building Inspection Depa~hnent Garreth Campbell, Construction Inspector Larry Davis, Construction Inspector villofc Federal Emergency Management Agency Washington, D.C. 20472 -- SEP 8 1992 CERTIFIED MAIL RETURN RECEIPT REQUESTED The Honorable Mark Wolfe Case No.: 92-06-037R Mayor, City of Coppell Re: Denton Creek/Villages P.O. Box 478 of Coppell, Phases 3 and 4 255 Parkway Boulevard Community: City of Coppell, Coppell, Texas 75019 Texas Community No.: 480170 Dear Mayor Wolfe: This is in response to a letter dated April 10, 1992, from Mr. Kenneth Griffin, P.E., City Engineer, City of Coppell, regarding a request for a Conditional Letter of Map Revision (CLOMR) to the effective Flood Insurance Rate Map (flIP. M) for the City of Coppell, Texas, dated October 16, 1991. The CLOMR request represents a revision to the effective lO0-year floodplain and effective floodway boundaries along Denton Creek and Elm Fork of Trinity River. The request is based on proposed fill between Cross Sections 104880 and 105500 along Elm Fork of Trinity River, and between Cross Sections 18440 and 19930 along Denton Creek. AIl of the data necessary to process this request were received with a letter dated April 10, 1992, from Mr. Griffin; a letter dated June 5, 1992, from Mr. Robert Porter, Project Manager, Tipton Engineering, Inc.; and a letter dated June 30, 1992, from Mr. Richard Rovas, P.E., Vice President, Tipton Engineering, Inc. Fees necessary to process this CLOMR (a total o£ $1,470) have been received. We have completed our review of the submitted data with regard to the data used to produce an ongoing restudy of the Flood Insurance Study for the City of Coppell. We believe that a revision to the 100-year floodplain and floodway would 'be warranted after the ongoing restudy becomes~f-~eCtive and if th~ ..... ' ' ...... proposed project ~s constructed as snows on the p~an-~ 'Ex~-hibit B, R~clamation Plan, Villages ~ ~11, Phases 3 and c4~-~!il, Texas-~ prepared by Don A. Tipton, Inc.~ dated January 1991, and as describe~he report entitled "Elm Fork Trinity River and Dent~n Creek, City of Coppell, Dallas County, Texas, Floodplain Recitation Study, Villages of Coppell, Phases 3 and 4, Request for Conditional LONR," prepared by Don A. Tipton, Inc. Floodplain and floodway boundaries would be revised according to those shown on the same plan. Upon completion of this project, please submit an "as-built" grading, nd site ~[~_c_e_r~if fe~-- by a '-~'i~eyed -' pr-~-f~ engxneer, lr~P'- ~_aarea; certi£1~ion :-h-~-~plh~-d~-t-h~ curren~[~ec~i've floodplain a result of this pro,ecl is compacted to 95 percent of ~-he-~ximum density obtainable with the Standard Proctor Test method issued b7 the American Sqciety for Testing and Materials (ASTN Standard D-698)~ and a stability analysis for the proposed Gabion Wall along Deforest Road between Cross Sections 18440 and 19930.' We will make a final determination on revising the FI~M upon receipt of the data listed above. Please note that the City of Coppell is undergoing a .c%~ywlde restudy and that the study has been appealed. The appeal does not affect the port~f Denton Creek and~of TrinitY River assoc~a~~-~7~h this Rroject. It is anticipated that t~he restudy w~ll become effective in ]993. Because this request is based on flooding in[ormatio~ contained in the map re__vision fo~-this project can only be processed-af~ef ~ ~estu~y becomes effective' ................ . ........ Please note that the Federal Emergency Management Agency (FEMA) ~as developed detailed application and certification forms for use in requesting revisions or amendments to NFIP maps. These forms will be used for all requests received by FEMA on or after October 1, 1992. These forms highlight technical considerations in a fashion that facilitates an efi~ci~nt review; therefore, use of these forms prior to October 1 is strongly recommended. Applications are available for Letter of Map Amendment and Letter of Map Revision Based on Fill requests. Application forms for all other revision requests should be available after September 1. If you have any questions, please call Mr. Jim LeGrotte, Chief, Natural and Technological Hazards Division, FEMA, Region VI, in Denton, Texas at (817) 898-5162, or Mr. Alan Johnson of my staff in Washington, D.C., at (202) 646-3403. Sincerely, William R. Locke Chief, Risk Studies Federal Insurance Adm~nist~?a! ~on cc: Mr. Ron Morrison Mort]son Hydrology/Engineering Inc. ~.~~_nneth Griffin, P.E. ~ity Engineer Mr. Don A. Tipton Don A. Tipton, Inc.