Loading...
ST9601-LR 990626 (2) TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing CONCRETE STRENGTH REPORT (ASTM C-39), (ASTM C-78) OR (TEX-418-A), CTEX-448-A) Mr. Robert Caudill DATE: 06/26/1999 REPORT NO.: 6~,;71/79 Tiseo Paving JOB NO.: 985142 P O Box 270040 Dallas, TX 75227 PROJECT: Wrangler Drive Coppell, Texas Cyl or Slump(in.) Air (%) Streno. th (psi) Beam Date Date AST~I AST~I 28-Day No. Location Break Made (C-143) (C-231) 7-Day 28~Day Specs. 46- A Sta 22+10 05/29 05/25 3.50 6.0 (1520)* 3000 B 06/01 05/25 (2050) C 06/22 05/25 3040 D 06/22 05/25 3100 47- A Sta 25+00 05/29 05/25 3.50 6.0 (1800)* 3000 B 06/01 05/25 (2120) C 06/22 05/25 3110 D 06/22 05/25 3080 48- A Sta 27+50 05/29 05/25 6.00 6.5 (1630)* 3000 B 06/01 05/25 (2050) C 06/01 05/25 (2180) D 06/22 05/25 3080 E 06/22 05/25 3180 * 4 day break REMARKS: Conical fracture on cylinders unless othersvise noted. Cylinder diameter 6.00" unless othersvise noted. TEAI~I Consultants, Inc. By: ~C,~ ke Ronald L. Bannister cc: City of Coppell 2970 s. walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920