ST9601-LR 990626 (2) TEAM Consultants, Inc.
Geotechnical, Environmental, Construction Materials Testing
CONCRETE STRENGTH REPORT
(ASTM C-39), (ASTM C-78) OR (TEX-418-A), CTEX-448-A)
Mr. Robert Caudill DATE: 06/26/1999 REPORT NO.: 6~,;71/79
Tiseo Paving JOB NO.: 985142
P O Box 270040
Dallas, TX 75227 PROJECT: Wrangler Drive
Coppell, Texas
Cyl or Slump(in.) Air (%) Streno. th (psi)
Beam Date Date AST~I AST~I 28-Day
No. Location Break Made (C-143) (C-231) 7-Day 28~Day Specs.
46- A Sta 22+10 05/29 05/25 3.50 6.0 (1520)* 3000
B 06/01 05/25 (2050)
C 06/22 05/25 3040
D 06/22 05/25 3100
47- A Sta 25+00 05/29 05/25 3.50 6.0 (1800)* 3000
B 06/01 05/25 (2120)
C 06/22 05/25 3110
D 06/22 05/25 3080
48- A Sta 27+50 05/29 05/25 6.00 6.5 (1630)* 3000
B 06/01 05/25 (2050)
C 06/01 05/25 (2180)
D 06/22 05/25 3080
E 06/22 05/25 3180
* 4 day break
REMARKS: Conical fracture on cylinders unless othersvise noted.
Cylinder diameter 6.00" unless othersvise noted.
TEAI~I Consultants, Inc.
By: ~C,~
ke Ronald L. Bannister
cc: City of Coppell
2970 s. walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458
3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920