Loading...
Villages C P3&4-CS 921005 October 5, 1992 Mr. Robert Porter Tipton Engineering, Inc. 6330 Belt Line Road, Suite C Garland, Texas 75043 Re: Villages of Coppell-3B Dear Mr. Porter: The City of Coppell has received and reviewed the proposed revisions to Sheet 4 of the Villages of Coppell Phase 3B plans. The following changes should be made to those additions: 1) The guard rail at the end of the alley along the north side of Lot 41 should also be extended along the west side of Lot 40 Block A, as there is also a steep drop- off at that point. 2) All metal should be galvanized. 3) Please show the slope protection and the type of slope protection. Once these changes have been made, the marked-up set and the revised set should be resubmitted to the City of Coppell. If you should have any questions, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Larry Davis, Construction Inspector villofco