Villages C P3&4-CS 921104 (2)November 4, 1992
Mr. Robert Porter
Tipton Engineering Inc.
6330 Belt Line Road, Suite C
Garland, TX 75043
RE: Villages of Coppell IV-B
Final Acceptance
Dear Mr. Porter:
A final inspection of the above referenced project has been confirmed by representatives of the
City of Coppell subject to the various mainteance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard requirements. Erosion protection will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter (November 4, 1993). Maturity
on the Erosion Control Bond will be two years from this letter (November 4, 1994).
Sincerely,
Larry Davis - )L,-'~ ~--'- ~
Construction Inspector
cc: Steve Goram, Director of Public Works
~. ~eth M. Griffin, P.E., City Engineer
hohre Daneshmand, Civil Engineer
Greg Jones, Acting Building Official
Ed Tool, Grand Homes, Inc.
CLD/bd
voc4bfin