Loading...
Villages C P3&4-CS 921106GRAND HOMES November 6, 1992 Hand Delivered Shohre Daneshmand City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Landscape Plans Villages of Coppell Phase III & IV Dear Ms. Daneshmand: Thank you for the opportunity to meet with you and Rick Wheland to update you on the status of our subdMsions in the Lakes of Coppell. Pursuant to our meeting I have revised the final landscape plans for the Villages of Coppell. As we discussed, we originally envisioned planting a row of photinias along the alley right of way, adjacent to the DeForest Road right of way. The purpose of these photinias was to provide a barrier to vehicular access to and from the alley and DeForest Road. As you know from your review of the site and as show by the topographic contours and elevations shown on the landscape plans, there is quite a bit of difference between the elevation of the alley and the elevation of DeForest Road. As the alley is five to six feet below DeForest Road, in reviewing this condition with staff, it was deemed inadvisable to plant photinias at the bottom of the slope. The original intent of the ~ photinias would not be a realized and the potential saturation of their roots would not allow for their survival. Instead what the plan proposes is that the area be reshaped and grassed which in fact we have done. Working with Ken Griffin and Payton Weaver on the DeForest Road drainage north of Phase IIIB, we replatted the lots backing to DeForest Road by removing the alley and converting to front entry lots. Under the replat, the property lines of each lot go all the way back to the widened right of way of DeForest Road. There is no common area present. We have installed gabion walls right along the property line with a earthen channel on the north side of the gabion wall. We will be hydromulching the earthen channel to provide ground cover. As under the original project approval, we intend for this area to be maintained by us followed by the homeowners association which we have established for that purpose the documents to which you have on file as part of the original project approval. 8800 N. Central Expressway, Suite 330, Dallas, Texas 75231 (214)750-6528 Fax (214)750-6849 Shohre Daneshmand City of Coppell November 6, 1992 Page 2 In accordance with the council's wishes, we have left the existing vegetation intact wherever possible. We will be cleaning up and dressing up the existing vegetation along DeForest Road in accordance with Mr. Wheland's instructions. Thank you for your help on this project. Please let me know if you will need further information. Sincerely, Edward D. Toole Vice President EDT:jlb cc: Rick Wheland, City of Coppell Stephen H. Brooks