Loading...
Villages C P3&4-CS 921109 COPPELL PUBLIC WORKS MEMORANDUM DATE: November 9, 1992 TO: Larry Davis, Construction Inspector~ I.~l ~/ FROM: Rey Gonzales, Street Superintenden~/ RE: Final Acceptance; Villages of Coppell IIIB Staff has completed its review of the above mentioned project and finds it to be in good order. We have been in touch with the utilities contractor on this project and have received a letter of intent to repair the erosion at the drainage discharge point where we met on Friday, 11/6/92. I have included a copy of this letter for your records. Staff is in the process of installing the necessary signs on this project and hopes to have this completed by week's end, weather permitting. If you have any questions, please contact me. RG/bc STVILLA.RG Murray CONSTRUCTION , / November 4, 1992 / City Of Coppell Box 478 Coppell, Tx. 75019 Attn: Rey ~onzales Street Superintendent Subject'~llages o~ Headwal l Dear Rey, The attached sketch and notes were developed by our foreman, Walt Hannon after his meeting with you and Larry Davis on site today to look at the headwall. We will make the corrections outlined in the sketch within the next ten (10) working days. We would appreciate your releasing the project to the owner with the assurance that we will do this extra work. OHM/hj cc: Grand Homes, Inc. Attn: Ed Toole 515 NO. KEALY AVE. LEWISVILLE. TEXAS 75057 (214) 436-4566 FAX (214) 21g-001g