ST9601-CS 990121SCAVA
lid. Parmership
January 21, 1999
Robert Caudill
Tiseo Paving Company
419E. Ilwy. 80
Mesquite, TX 75150
RE: Wrangler Drive - GTE Conflict
Dear Robert,
You are well aware of the down time we are suffering on Wrangter Drive as a result of a
conflict with GTE. This first was known over 4 months aBo and 3 weeks aBo we were totd
everythin8 was all clear from Jay Strums with GTE, however when we arrived on the Job today
and bngan diSSine we cut a live cane that was supposed to be dead, but was not. It was my
understanding that the Hnes were to be moved out of our way. Therefore we wil| not accept
any responsibility for the doma~e done today and furthermore we cannot complete our work
until this matter is resoived.
Your cooperation with this matter is most appreciated. Ptease contact me should you have any
questions.
Sincerely
Estimator
i~.(). I',ox 270249 · l)allas, Texas 75227 · (214) 3294)045 · Fax (214) 3~)-0048