ST9601-CS 990105 PAVING COMPANY 419 East Highway 80 P.O. Box 270040 Dallas, Texas 75227-0040 Tel 972-289-0723 Fax 972~216-5637 Tuesday, January 5, 1999 City of Coppell P. O. Box 478 Coppell, TX 75019 Atm: Larry Davis Re: Wrangler Road/G.T.E. Conflict This letter is a follow up on the progress by G.T.E. on Wrangler Rd. As of December 31, 1998, G.T.E. is still splicing their lines at Wrangler Rd. and Crestside Drive. In a phone conversation on Monday, January 4, 1999 with J. Sireins, with G.T.E., he informed John Redman, Tiseo's project superintendent, that it will be another week before the lines in conflict with the proposed box culvert will be removed. Also, G.T.E. is in conflict with the proposed inlets on the north side. On December 30, 1998, the water line relocation at pav.sta. 18+95 was completed, leaving Tiseo Paving only to finish the box culvert and inlets before street excavation. The temporary road that was installed by us on the south side of Wrangler Rd. was~ only intended to last a period of no more than two(2) months. It now has been longer than that, and the detour road is starting to require maintenance work. When we bid the project we did not provide addition costs associated with the maintenance of the detour road. Tiseo Paving Company believes that G.T.E. should pay for the detour maintenance cost we have incurred, since it is their delays that have caused this detour to be in use past the original contract period. Should you have any questions regarding this matter, please feel free to call me at (972) 289-0723. Sincerely, " Robert Caudill