Loading...
CF-Coppell Rd SC-LR011114Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Texas Unified Constructors, Inc. DATE: 14 November 2001 PROJECT: Field Service Offices & Maintenance Facility JOB NO. 01.1054 Coppell, TX TIME: 3.0 hours AREA INSPECTED: Grade beams at service center building: lines A to D and 1 to 3.5 DATE OF INSPECTION: 11/14/01 (9:00am-11:00am, 1:00pm-2:00pm) DEFICIENCIES NOTED: NUMBER LOCATION/ITEM DESCRIPTION CORRECTIONS OBSERVED First stirrup at each side of each pier not at 5". Formwork/bulkheads incomplete. Yes Yes TECHNICIAN: MFM/RJW 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 14 November 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Dark Grey Clay 2) Borrow Fill - Dark Grey & Brown Clay with Gravel ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture 2) 99.0 pcf ~ 20.5% Moisture 86) 87) LOCATION PROCTOR Backfill at East/West Water Line South of Buildings SE corner of vehicle storage bldg. 2 20' south of NE corner of vehicle 1 storage bldg. Backfill at Fire Hydrant Lateral Line 88) 20' south of wall at chemical bldg. 1 1' 89) 20' south of wall at chemical bldg. 1 2' LIFT BELOW SUBGRADE 2' 2' MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 19.0 99.9 101.0 20.1 92.9 97,0 2O.O 91.5 96.3 22.3 90.5 95.3 95+ Optimum +/- 2% NOTE: All tests passed project requirements for density and moisture. TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148