CF-Coppell Rd SC-LR011112Hooper Engineering Laboratories, Construction Materials Testing Inc. .CLIENT: PROJECT: CONCRETE SUPPLIER: REPORT OF CONCRETING OPERATIONS HE JOB NO. 01.1054 Texas Unified Constructors, Inc. Field Service Offices & Maintenance Facility- Coppell, TX Lattimore LOCATION OF CONCRETE PLACED: DATE: 12 November 2001 WEATHER: Cloudy/Calm AIR TEMP: 60°F 7 Piers at Utility Storage Bldg. (.See Pier Report 11/12/01) Cement: Brand m. Ao I.A. C.A. Materials HolnamType I Source Bin @ Plant #7 Aggregate Type Source Size 0 #4 Sand Lattimore 1" - #4 Cr. Stone Bridgeport Actual Batch Computations: % Free Actual Moisture Water Batch Wts. Cement ..414/103 F.A. 5.0 72 1505 C.A. 18 50 Total Free Water Added at Mixer Total Water 72 lbs. 170 lbs. 242 lbs. Design Mix Mix 54 , 3000 psi Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: Cement 4.14/10.3 F.A. 1433 I.A. C.A. 1850 Admix Plastocrete _161 @ 15.5 o~/yd Time Started: ll:20am Time Finished: ll:50am Concrete Placed, c.y.: 7.5 Concrete Temp: 75°F Cyl'inders Made: 49 - 52 Remarks: Certified Correct ~ Inspector 28~0 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: Texas Unified Constructors, Inc. DATE: 12 November 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell, TX JOB NO.: 01.1054 DRILLER: TIME: 9:30am-1 2:30pm 3.0 hours PIER MARK SHAFT BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER DIA. SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE Utility Storage Buildin,q 12-C/6 21 -B/6 22-B/7 23-B/8 24-B/8.9 25-B/10 11 -C/10 18" 48" (2)/ok 13.0' 11.0' 11.2' 11:46 -1.6' None 18" 48" (2)/ok 13.0' 11.5' 11.5' 11:22 -1.6' None 18" 48" (2)/ok 13.0' 11.5' 11.5' 11:26 -1.2' None 18" 48" (2)/ok 13.0' 10.9' 11.0' 11:30 -1.O' None 18" 48" (2)/ok 13.0' 10.6' 10.9' 11:34 -1 .O' None 18" 48" (2)/ok 13.0' 11.5' 11.7' 11:38 -1.4' None 18" 48" (2)/ok 13.0' 10.6' 11.5' 11:43 -1.4' None REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) These piers were drilled and belled on 11/9/01, but no concrete was placed due to heavy rain and muddy site conditions. Holes were covered with plywood. Final depths and bell sizes were rechecked and verified to be the same as initially drilled. Concrete was placed today, 11/12/01. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Driller found sand to be approximately 11.5' in this area. Per superintendent for Texas Unified, other piers were stopped at approximately 11.0'. TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148