CF-Coppell Rd SC-LR011108Hooper Engineering Laboratories, Construction Materials Testing Inc. CLIENT: PROJECT: CONCRETE SUPPLIER: Lattimore LOCATION OF CONCRETE PLACED: REPORT OF CONCRETING OPERATIONS HE JOB NO. 0}.10S4 Texas Unified Constructors, Inc. Field Service Offices &Maintenance Facility Coppell, TX DATE: WEATHER: AIR TEMP: Piers [See Pier Inspection Report of 11/8/0~)_ 8 November 200~ Partly Cloudy 58 - 75°F Cement: Brand F,A. I.A. C.A. Materials Holnam Type I Source Bin @ Plant Aggregate Type Source Size 0 - #4 Sand Lattimore i" #4 Cr. Stone Lattimore Design Mix Mix 54 , 3000 psi Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: Cement 414/10.3 F.A. ]433 I.A. C.A. 1850 Admix Plastocrete .16.1 @ 15.5 o'z/yd Actual Batch Computations: % Free Actual Moisture Water Batch Wts. Cement 4,,14/103 F.A. 5.0 72 1505 C.A. 1850 Total Free Water 72 lbs. Added at Mixer 178 lbs. Total Water 250 lbs. Time Started: 3;30pm Time Finished: 5:15pm Concrete Placed, c.y.: Concrete Temp: 79°F Cyl'inders Made: 45- 48 Remarks: Certified Correct EWM Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 8 November 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture 78) 79) 8O) 81) LOCATION PROCTOR LIFT Backfill at New Water Main North Side of Service Center BELOW SUBGRADE MOISTURE CONTENT % approx. 200' W of W bldg. line 1 2' 20.3 approx. 50' E of W bldg. line RETAKE 1 1'-2' 21.6 approx. 50' E of W bldg. line RETAKE 1 Fin. Sub. 21.9 approx. 10' W of E bldg. line 1 1'-2' 24.0 East Side of Service Center 82) approx. 125' north of north bldg. line 1 3' 20.6 83) approx. 50' south of north bldg. line 1 1 '-2' 20.4 84) approx. 50' south of north bldg. line 1 3' 23.5 West Side of Service Center 85) approx. 30' north of south bldg. line 1 1 '-2' 23.9 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 90.3 95.1 95+ 92.7 97.6 Optimum +/- 2% 94.O 98.9 91.4 96.2 91.8 96.7 91.5 96.3 91.1 95.9 90.7 95.5 NOTES: 1) Retakes of tests taken 11/7/01. 2) All tests passed the project requirements for density and moisture. TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: PROJECT: DRILLER: Texas Unified Constructors, Inc. Field Service Offices & Maint. Fac., Coppell, TX D & D Drilling DATE: 8 November 2001 JOB NO.: 01.1054 TIME: 6:30am-6:0Opm 10.0 hrs./1.5 hrs. OT PIER SHAFT MARK DIA. Utility Stora.qe Building 26-P/1 18" 1 6-B/1 1 8" 15-C/1 18" 1 -D/1 (5) 18" 2-D/2 18" 3-D/3 (5) 18" 4-D/4 18" 5-D/5 18" 1 3-C/5 (5) 18" 14-C/3 (5) 18" 6-D/6 1 8" 7-D/7 1 8" 8-D/8 1 8" 9-D/9 18" 10-D/10 18" REMARKS: 1 ) BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE 48" ok/ok 13.0' I 1.0' 11.1' 3:48 -1.7' None 48" ok/ok 13.0' 10.9' 11.0' 3:51 -1.8' None 48" ok/ok 13.0' 11.1' 11.1' 3:54 -1.7' None 48" ok/ok 13.0' 11.2' 11.3' 3:57 -1.8' None 48" ok/ok 13.0' 10.6' 10.6' 4:00 -1.8' None 48" ok/ok 13.0' 11.2' 11.5' 4:03 -2.5' None 48" ok/ok 13.0' 10.7' 11.0' 4:07 -2.3' None 48" ok/ok 13.0' 11.0' 11.0' 4:10 -2.4' None 48" ok/ok 13.0' 11.1' 11.2' 4:15 -2.5' None 48" ok/ok 13.0' 11.0' 11.2' 3:45 -2.5' None 48" ok/ok 13.0' 10.8' 10.9' 5:00 -1.6' None 48" ok/ok 13.0' 11.0' 11.1 ' 5:05 -1.7' None 48" ok/ok 13.0' 11.0' 11.0' 5:10 -1.6' None 48" ok/ok 13.0' 10.8' 11.0' 5:15 -1.6' None 48" ok/ok 13.0' 10.7' 10.8' 4:20 -1.7' None Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Driller is hitting sand at approximately 11.5'. Per superintendent for Texas Unified, other piers were stopped at approximately 11' TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppeli (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. ~1~ DATE: 8 November 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION-O~--F~UR SET 1'. Piers: A/l, B/l, C/1, D/l, D/2, D/3, D/4, D/5, C/4, C/3 and D/10 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 819 Cement 414 Type I Ticket No. 3136566 Flyash 103 Time Batched 2:59pm Sand 1433 Time Sampled 3:45pm in. Concrete Temp. (ASTM C1064) 79°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C1381 Admix #1 Plastocrete 161 @ 15.6 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 45 4.50 7 11/15/01 46 4.50 28 1 2/06/01 47 4.50 28 1 2/06/01 48 4.50 56 01/03/02 99,000 3500 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148