Loading...
CF-Coppell Rd SC-LR011107Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: PROJECT: DRILLER: Texas Unified Constructors, Inc. Field Service Offices & Maint. Fac., Coppell, TX D & D Drilling DATE: 7 November 2001 JOB NO.: 01.1054 TIME: 6:30am-3:30pm 8.5 hrs./0.5 hr. OT PIER SHAFT MARK DIA. Service Center Building BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE 120-D/12.9 1 8" 48" 121-D13.1 18" 48" 122-D/14 1 8" 48" Utility Storage Building 20-B. 1/2 1 8" 48" 19-B. 1/3 1 8" 48" 18-B. 1/4 1 8" 48" 17-B.1/5 18" 48" ok/ok 13.0' 11.1' 11.2' 2:00 -1.0' None ok/ok 13.0' 10.7' 11.0' 2:05 -1.5' None ok/ok 13.0' 10.6' 11.0' 2:10 -0.8' None ok/ok 13.0' 11.0' 11.0' 2:15 -2.2' None ok/ok 13.0' 11.0' 11.2' 2:20 -2.1' None ok/ok 13.0' 11.0' 11.1' 2:25 -2.0' None ok/ok 13.0' 10.6' 10.8' 2:30 -2.0' None REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Driller is hitting sand at approximately 11.5'. Per superintendent for Texas Unified, other piers were stopped at approximately 11' TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB NO. 01.1054 CLIENT: Texas Unified Constructors, Inc. PRO3ECT: Field Service Offices & 3bintenance Facility Coppell, TX CONCRETE SUPPLIER: Lattimore LOCATION OF CONCRETE PLACED: DATE: WEATHER: AIR TEMP: Piers (See Pier Inspection Report of .11/7/0,1~ 7 NovemBer 2001 Partly Cloudy 55-78°F Cement: Brand Holnam Aggregate Size F.A. 0 ~4 I.A. C.A. 1" #4 Materials Type I Source Bin @ Plant Type Source Sand Lattimore Cr. Stone Lattimore Design Mix Mix 54 , 3000 psi Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: Cement 414/103 F.A. 1433 I.A. C.A. 185Q AdmixPlastocrete 161 @ 15.5 oz/~d Actual Batch Computations: % Free Moisture Water Cement F.A. Actual Batch Wts. 4 4/ o3 5.0 72 1505 Total Free Water Added at Mixer Total Water 1850 72 lbs. 178 lbs. 250 lbs. Time Started: 2:OOpm Time Finished: 3:OOpm Concrete Placed, c.y.: 8.5 Concrete Temp: 76°F Cyl'inders Made: 41 . 44 Remarks: Certified Correct EWM Inspector 287;0 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 7 November 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: t) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture 75) 76) 77) LOCATION PROCTOR Backfill at New Water Main north side of service center approx. 200' west of west bldg. line approx. 50' east of west bldg. line approx. 50' east of west bldg. line LIFT BELOW SUBGRADE 1 Fin. Sub. MOISTURE CONTENT % 20.7 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 98.8 104.0 95 + Optimum +/- 2% 1 1'-2' 14.6' 96.5 101.6 1 Fin. Sub. 15.2' 97.6 102.7 *Test results indicate fill is not compacted to required density/moisture. Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 7 November 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: B.1/2, B.1/3, B.1/4, B.1/5, D/12.9, D/13.1 andD/14 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 1045 Cement 414 Type I Ticket No. 711 0465 Flyash 103 Time Batched 1:26pm Sand 1433 Time Sampled 2:1 Opm in. Concrete Temp. (ASTM C10641 76°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C138) Admix #1 Plastocrete 161 @ 15.5 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 41 4.00 7 11/14/01 42 4.00 28 1 2/05/01 43 4.00 28 1 2/05/01 44 4.00 56 01/02/02 116,700 4130 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148