CF-Coppell Rd SC-LR011106Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONaCRETE TESTS JOB NO.: 01.1054 CLIEN~nified Constructors, Inc. DATE: 6 November 2001 PROJECT: Field Service Offices~aint. Fac., Coppell SUPPLIER: Lattimore LOC/~I-ION OF POUR SET~"Piers: FD/11, FD/10, FD/9, FD/8, FD/3, FD/2, FD/1, C/12, ~ D/12 and F/12 LO CATI Ft~,.~.~S ET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 761 Cement 414 Type I Ticket No. 6163941 Flyash 103 Time Batched 2:59pm Sand '1433 Time Sampled 3:35pm in. Concrete Temp. IASTM C1064) 75°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C138) Admix #1 Plastocrete 161 @ 15.5 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 37 5.25 7 11/13/01 38 5.25 28 1 2/04/01 39 5.25 28 12/04/01 40 5.25 56 01/01/02 1 O3,9OO 3670 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETING OPERATIONS HE JOB NO. 0.1.10S4 CLIENT: Texas Unified Constructors, Inc. PROJECT: Field Service Offices & Maintenance Facility. Coppell, TX COhCRETE SUPPLIER: Latt~3nore LOCATION OF CONCRETE PLACED: DATE: WEATHER: AIR TEMP: Piers (.See Pier Inspection Report of ~1/6/O1~ 6 November 2001 Partly Cloudy 56-78°F Cement: Brand Holnam Aggregate Size F .A. 0 #4 I.A. C.A. 1" #4 Materials Type I Source Bin @ Plant Type' Source Sand Lattimore Cr. Stone Lattimore Design Mix Mix 54 ,~si Max. Water-Cement Ratio ~y weight Batch Weights - S. S. Dry Basis: Cement 414/103 F.A. 1433 I.A. C.A. .1850 Admix Plastocrete .161 @ 15.5 Actual Batch Computations: Cement F.A. I.A. C.A. % Free Moisture Water Actual Batch Wts. 414/103 5.0 72 1505 Total Free Water Added at Mixer Total Water ]850 72 lbs. 178 lbs. 250 lbs. Time Started: 3;30pm Time Finished: 5:30pm Concrete Placed, c.y.: 11.5 Concrete Temp: 75°F Cyl'inders Made: 37 - 40 Remarks: Certified Correct Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: PROJECT: DRILLER: Texas Unified Constructors, Inc. Field Service Offices & Maint. Fac., Coppell, TX D & D Drilling DATE: 6 November 2001 JOB NO.: 01.1054 TIME: 6:30am-5:30pm 10.0 hrs./1.0 hr. OT PIER SHAFT MARK DIA. BELL ALIGN/ REQ'D INITIAL SIZE PLUMB DEPTH DEPTH Chemical Storage Buildin_~ 27-FD/11 (5) 18" 28-FD/10 (5) 18" 29-FD/9 (5) 18" 30-FD/8 (5) 1 8" 35-FD/3 (5) 18" 36-FD/2 (5) 1 8" 37-FD/1 18" Service Center Building 117-C/1 2 18" 118-D/12 18" 119-F/12 18" 123-C/14 (5) 18" FINAL FINAL TOP OF WATER DEPTH POUR CONC. ELEV. IN HOLE 48" ok/ok 13.0' 11.2' 11.2' 3:35 -2.0' None 48" ok/ok 13.0' 10.7' 10.8' 3:39 -2.0' None 48" ok/ok 13.0' 11.0' 11.1 ' 3:43 -2.2' None 48" ok/ok 13.0' 11.0' 11.2' 3:47 -2.4' None 48" ok/ok 13.0' 11.3' 11.3' 3:50 -2.6' None 48" ok/ok 13.0' 11.1' 11.3' 3:53 -2.5' None 48" ok/ok 13.0' 13.0' 13.0' 3:56 -3.5' None 48" ok/ok 13.0' 12.7' 12.8' 4:00 -2.2' None 48" ok/ok 13.0' 13.1' 13.2' 4:03 -2.1' None 48" ok/ok 13.0' 12.3' 12.4' 4:06 -2.0' None 48" ok/ok 13.0' 11.5' 11.7' 4:55 ~1.0' None REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Driller is hitting sand at approximately 11.5'. Per superintendent for Texas Unified, other piers were stopped at approximately 11 '. TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: PROJECT: Field ~fices&MaintenanceFac. ~ JOB NO.: Coppell, TX ~ MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay 2) Borrow Fill - Dark Grey & Brown Clay with Gravel 6 November 2001 01.1054 ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture 2) 99.0 pcf @ 20.5% Moisture 69) LOCATION PROCTOR LIFT Backfill at New Water Main south side of service center 80' east of west bldg. line MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % BELOW SUBGRADE 1 3' 21.6 70) west side of service center 1 3' 22.5 80' north of south bldg. line North Side of Service Center 71) 60' east of west bldg. line 2 3' 20.7 72) 40' east of west bldg. line 1 3' 20.0 73) 80' east of east bldg. line 2 3' 21.0 74) 180' east of west bldg. line 2 3' 20.2 95.2 100.2 95.0 100.0 98.9 99.9 93.2 98.0 99.5 100.5 99.2 100.2 REQUIRED COMPACTION % 95+ Optimum +/- 2% NOTE: All tests passed the project requirements for density and moisture. TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351~5148