CF-Coppell Rd SC-LR011029Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 29 October 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1) Select Fill - Brown Clayey Sand ASTM D 698 STANDARD PROCTOR: 1) 111.0 pcf @ 13.0% Moisture 63) LOCATION PROCTOR LIFT Vehicle/Equipment Storage Building Pad 20' north of south bldg. line 10' east of west bldg. line 64) 40' south of north bldg. line 30' east of west bldg. line 65) 15' north of south bldg. line 15' west of east bldg. line 66) 25' south of north bldg. line 15' west of east bldg. line 67) 15' south of north bldg. line 10' east of west bldg. line 68) 20' north of south bldg. line 10' east of west bldg. line BELOW SUBGRADE Final MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % 11.2 114.1 102.8 1' 13.9 107.8 97.1 1 Final 11.6 107.3 96.7 1' 12.4 110.2 99.3 1 Final 10.3 111.3 100.3 1' 15.4 109.7 98.8 REQUIRED COMPACTION % 95+ Optimum +/- 3% TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: Texas Unified Constructors, Inc. DATE: 29 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell, TX JOB NO.: 01.1054 DRILLER: D & D Drilling TIME: 7:00am-5:O0pm 10.0 hours PIER SHAFT BELL ALIGN/ REQ'D INITIAL FINAL FINAL MARK DIA. SIZE PLUMB DEPTH DEPTH DEPTH POUR TOP OF WATER CONC. ELEV. IN HOLE Service Center 97-G/7 24" 72" ok/ok 13.0' 13.0' 13.0' 3:10 -2.0' None 82-G/6.5 24" 72" ok/ok 13.0' 13.2' 13.2' 3:15 -2.5' None 81-G/5 24" 72" ok/ok 13.0' 13.1' 13.2' 3:20 -2.1' None 80-F.1/5 24" 72" ok/ok 13.0' 13.0' 13.0' 3:25 -2.0' None 79-E.5/5 24" 72" ok/ok 13.0' 13.3' 13.3' 4:20 -2.1' None 78-C. 7/5 24" 72" ok/ok 13.0' 13.2' 13.5' 4:15 -2.2' None 77-C.2/5 24" 72" ok/ok 13.0' 13.0' 13.3' 4:10 -2.1' None 76-B/5 24" 72" ok/ok 13.0' 13.0' 13.0' 4:05 -2.1' None REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. .CLIENT: PR03ECT: CONCRETE SUPPLIER: Lattimore LOCATION OF CONCRETE PLACED: REPORT OF CONCRETING OPERATIONS HE JOB NO. 01.1054 Texas Unified Constructors~ Inc. DATE: Field Service Offices &Maintenance Facility- Coppell, TX ' WEATHER: AIR TEMP: 54~74°F 8 Piers on Service Center Bldg. (~ee Pier Report 10/29/01} 2gOctober 2001 Cloudy Materials Cement: Brand__Type I Source BiN @ Plant .#7 Aggregate Type Source Size F.A. 0 #4 Sand Lattimore I.A. C.A. 1" ~4 Cr. Stone Lattimore Design Mix Mix 54 ,~si Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: Cement 414/10,3 F.A. 1433 I.A. C.A. 1850_ Admix Plastocrete &bi @ .15.5 o~/yd Actual Batch Computations: % Free Actual ~oisture Water Batch Wts. Cement 414/103 F.A. 5.0 72 1505 I.A. C.A. 1850 Total Free Water 72 lbs. Added at Mixer 178 lbs. Total Water 250 lbs. Time Started: 3;0Opm Time Finished: 5:0Opm Concrete Placed, c.y.: 20_ Concrete Temp: 71°F Cyl'inders Hade: 17 - 20 Remarks: Certified Correct EWM Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS CLIENT: Texas Unified Constructors, Inc. PROJECT: Field Service Offices & Maint. Fac., Coppell LOCATION OF POUR SET 1: Piers: G/7, G/6.5, G/5 and F.1/5 on service center building LOCATION OF POUR SET 2: JOB NO.: 01.1054 DATE: 29 October 2001 SUPPLIER: Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 938 Cement Ticket No. 7109983 Flyash Time Batched 2:44pm Sand Time Sampled 3:15pm in. Concrete Temp. (ASTM C1064) 71 °F 1.0 in. Air Content IASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 54 414 Typei 103 1433 1850 25O Plastocrete 161 ~ 15.5 oz. COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 1 7 5.25 7 11/05/01 18 5.25 28 11/26/01 1 9 5.25 28 11/26/01 20 5.25 56 1 2/24/01 106,000 3750 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148