CF-Coppell Rd SC-LR011025Hooper Engineering Laboratories, Inc. Construction Materials Testing CLIENT: PROJECT: CONCRETE SUPPLIER: Lattimore LOCATION OF CONCRETE PLACED: REPORT OF CONCRETING OPERATIONS HE JOB NO. 01.1054 Texas Unified Constructors, Inc. DATE: Field Service Offices & Maintenance Facility Coppell, TX WEATHER: AIR TEMP: Piers (See Pier Inspection Report o£ ~0/25/0.1~ 25 October 2001 Clear 55-72°F Cement: Brand VP Aggregate Size F.A. 0 - #4 C.A. 1" #4 Materials Type I Source Bin @ Pla~t Type Source Sand Lattimore Cr. Stone Lattimore Design Mix Mix 54 , 3080 psi Max. Water-Cement Ratio by weight Batch Weights - S. S. Dry Basis: Cement 414./10.% F.A. _]433 I.A. C.A. 1850 Admix Plastocrete 16.1 @-15.5 oz'/yd Actual Batch Computations: % Free Moisture Water Cement F.A. I.A. C.A. 5.0 72 Total Free Water Added at Mixer Total Water Actual Batch Wts. 414/103 1505 1850 72 lbs. 178 lbs. 250 lbs. Time Started: Time Finished: 6;0Opm Concrete Placed, c.y.: 28 Concrete Temp: 76°F Cyl'inders Made: ~ - 12 Remarks: Certified Correct EWM/MFM Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 25 October 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture 60) 61) 62) LOCATION PROCTOR LIFT Sub.qrade at Vehicle/Equipment Buildin.q 30' south of north bldg. line 10' east of west bldg. line 60' south of north bldg. line 10' west of east bldg. line 20' north of south bldg. line 20' east of west bldg. line 1 Exist. Sub. 1 Exist. Sub. 1 Exist. Sub. MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 26.6 91.3 96.1 26.9 92.7 97.6 27.5 91.7 96.5 92-98 Min. +4% Of Optimum TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing Inc. BELLED PIER INSTALLATION OBSERVATION CLIENT: PROJECT: DRILLER: Texas Unified Constructors, Inc. Field Service Offices & Maint. Fac., Coppell, TX D & D Drilling DATE: 25 October 2001 JOB NO.: 01.1054 TIME: 7:00am-6:0Opm 10.0 hrs./1.0 hr. OT PIER MARK SHAFT DIA. Service Center 65-E.3/2 24" 64-C.7/2 24" 63-C.2/2 24" 62~B/2 24" 61 -A/2 24" 69-G/3 24" 70-F. 1/3 24" 71 -E.3/3 24" 72-C.4/3 24" 73-B/3 24" 74-A/3 24" 66-E.7/2 24" BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE 72" ok/ok 13.0' 13.1' 13.2' 3:30 ~2.3' None 72" ok/ok 13.0' 13.1' 13.1' 3:35 -2.2' None 72" ok/ok 13.0' 13.4' 13.5' 3:40 -2.2' None 72" ok/ok 13.0' 13.1' 13.1' 3:45 -2.3' None 72" ok/ok 13.0' 12.9' 13.0' 4:00 -2.2' None 72" ok/ok 13.0' 13.0' 13.0' 4:05 -2.1' None 72" ok/ok 13.0' 13.0' 13.0' 4:10 -2.3' None 72" ok/ok 13.0' 13.0' 13.0' 4:15 -2.2' None 72" ok/ok 13.0' 13.0' 13.0' 5:15 -2.3' None 72" ok/ok 13.0' 13.0' 13.0' 5:20 -2.2' None 72" ok/ok 13.0' 13.0' 13.0' 5:25 -2.2' None (5) 3:25 -2.1' REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Pour top 4' of pier E.7/2. Top of concrete placed on 10/24/01 was cleaned and slushed with bonding agent. TECHNICIAN: DISTRIBUTION: MFM/EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 25 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: top 4' of E.7/2, E.3/2, C.7/2, C.2/2 and B/2 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 938 Cement 414 Type I Ticket No. 7109814 Flyash 103 Time Batched 2:45pm Sand 1433 Time Sampled 3:25pm in. Concrete Temp. IASTM C1064) 76°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C138) Admix //1 Plastocrete 161 @ 15.5 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 9 5.00 7 11/01/01 10 5.00 28 11/22/01 11 5.00 28 11/22/01 12 5.00 56 12/20/01 100,400 3550 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 25 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: top 4' of E.7/2, E.3/2, C.7/2, C.2/2 and B/2 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 938 Cement 414 Type I Ticket No. 7109814 Flyash 103 Time Batched 2:45pm Sand 1433 Time Sampled 3:25pm in. Concrete Temp. (ASTM C1064) 76°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C138) Admix #1 Plastocrete 161 @ 15.5 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 9 5.00 7 11/01/01 100,400 3550 10 5.00 28 11/22/01 :~36 ~0QQ 48_~0 11 5.00 28 11/22/01 135,800 4800 12 5.00 56 12/20/01 164,40Q 58 20 28-Day Average 48_[0 3000 TECHNICIAN: DISTRIBUTION: EWM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 25 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: top 4' of E.7/2, E.3/2, C.7/2, C.2/2 and B/2 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 938 Cement 414 Type I Ticket No. 7109814 Flyash 103 Time Batched 2:45pm Sand 1433 Time Sampled 3:25pm in. Concrete Temp. (ASTM C1064) 76°F 1.0 in. 1850 Air Content (ASTM C231i Water 250 Unit Weight (ASTM C138) Admix //1 Plastocrete 161 @ 15.5 oz. Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 9 5.00 7 11/01/01 100,400 3550 10 5.00 28 11/22/01 1:5b ,0Q0 48_t0 11 5.00 28 11/22/01 1:55,800 4800 12 5.00 56 12/20/01 28-Da¥ Average 4810 3000 TECHNICIAN: EWM DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148