CF-Coppell Rd SC-LR011024 LOG OF BORING
PROJECT: Coppell Field Office Service Center BORING NO: 11 Covered Storage
CLIENT: Hooper Engineering Lab. LOCATION: Coppell, Texas
Job # 01.1054
JOB NO: 01.0836 BORING TYPE: Continuous Sample
DATE: 10/24/2001 DRILLER: Lawrence GROUND ELEVATION:
Legend: B - Bag
t~ c:: .~ S - Shelby Tube C - Core
u. 0 ~~_ ~ ~ P - STD Penetration Test X - No Recove~
, = ~ ~o
~ ~ ~~ : -- T - THD Cone Penetration Test ~- Water Table
D,~ription o[ Stratum
S 0.75 Grey clay, so~ & moist
2.0'
.. ~ S 2.25 Grey & tan clay, vo~ sti~ & moist
4.0'
s ~ S a.00 Tan & ~rey clay, hard & moist
S 4.00
8.0'
S 2.50
~0 Orange & grey sandy clay, ve~ stiff & moist
15
20
End of boring 10'
25
30
35
40
Hooper
Engineering Laboratories,
Construction Materials Testing
Inc.
REPORT OF CONCRETE TESTS JOB NO.: 01.1054
CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001
PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore
LOCATION OF POUR SET 1: Piers: A/l, A.7/1, C.3/1 and G/2 at service center building
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO. 54
Truck No. 1039 Cement 414 Type I
Ticket No. 7109717 Flyash 103
Time Batched 3:44pm Sand 1433
Time Sampled 4:40pm in.
Concrete Temp. (ASTM C1064) 77°F 1.0 in. 1850
Air Content (ASTM C231) Water 250
Unit Weight (ASTM C138) Admix #1 Plastocrete 161 @ 15.5 oz.
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
5 5.25 7 10/31/01
6 5.25 28 11/21/01
7 5.25 28 11/21/01
8 5.25 56 12/19/01
85,000 3010
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
MFM
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 01.1054
CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001
PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore
LOCATION OF POUR SET 1: Piers: A/l, A.7/1, C.3/1 and G/2 at service center building
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO. 54
Truck No. 1039 Cement 414 Type I
Ticket No. 7109717 Flyash 103
Time Batched 3:44pm Sand 1433
Time Sampled 4:40pm in.
Concrete Temp. (ASTM C1064) 77°F 1.0 in. 1850
Air Content IASTM C231) Water 250
Unit Weight IASTM C138) Admix //1 Plastocrete 161 @ 15.5 oz.
Admix //2
AEA
COMPRESSIVE STRENGTH TESTS {ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
5 5.25 7 10/31/01 85,000 301 0
6 5.25 28 11/21/01 :~ 29,700 4590
7 5.25 28 11/21/01 :~24 ,QOQ 4390
8 5.25 56 12/19/01 :~4:5,900 5090
28-Day Average 4490
3000
TECHNICIAN:
DISTRIBUTION:
MFM
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
BELLED PIER
INSTALLATION OBSERVATION
CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001
PROJECT: Field Service Offices & Maint. Fac., Coppell, TX JOB NO.: 01.1054
DRILLER: D & D Drilling TIME: 7:00am-6:00pm
10.0 hrs./1.0 hr. OT
PIER SHAFT BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER
MARK DIA, SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE
Service Center
54-G/1 24" 72" ok/ok 13.0' 13.3' 13.3' 3:25 -2.8' None
53-F.3/1 24" 72" ok/ok 13.0' 13.2' 13.3' 3:30 -2.5' None
52-E.7/1 24" 72" ok/ok 13.0' 13.2' 13.2' 3:35 -2.6' None
49-C.7/1 24" 72" ok/ok 13.0' 13.0' 13.2' 3:40 -2.5' None
48-C.3/1 24" 72" ok/ok 13.0' 13.3' 13.3' 4:35 -2.6' None
47-A.7/1 24" 72" ok/ok 13.0' 13.3' 13.3' 4:40 -2.5' None
46-A/1 24" 72" ok/ok 13.0' 13.3' 13.3' 4:45 -2.3' None
68-G/2 24" 72" ok/ok 13.0' 13.3' 13.3' 4:50 -2.3' None
67-F. 1/2 24" 72" ok/ok 13.0' 13.0' 13.2' 5:08 -2.2' None
66-E.7/2 24" 72" ok/ok 13.0' 13.2' 13.2' 5:12 -6.3' None
REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise.
3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct
bearing strata achieved, unless noted otherwise.
4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time
piers were drilled. Contractor must furnish actual elevation, if required.
5) Top of concrete at pier E.7/2 left approx. 4' below plan grade due to running out of concrete
and plant closed. Superintendent for Texas Unified was present when this occurred.
TECHNICIAN: MFM
DISTRIBUTION: (3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETING OPERATIONS HE JOB NO. 01.10S4
CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001
PROJECT: Field Service Offices & Maintenance Facility,
Coppell, TX WEATHER: Clear/Windy
CONCRETE SUPPLIER: Lattimore AIR TEMP: 75-80°F
LOCATION OF CONCRETE PLACED: 10 Piers (See Pier Inspection Report of 10/24/01~
Materials Design Mix
Cement: Mix 54 ,3000 psi
Brand Holnam Type I Source'?J~.It_~_~J~lL~ #7 Max. Water-Cement Ratio by weight
Aggregate Type Source Batch Weights - S. S. Dry Basis:
Size
F.A. ..0 - #4 .Sand Lattimore Cement 414/103 F.A. 1433
I.A. I.A. C.A. 185Q
C.A. 1" - #4 Cr. Stone Lattimore Admix Plastocrete 161 @ 15.5 6z/yd
Actual Batch Computations:
Time Started: 3:-lSpm
% Free Actual
Moisture Water Batch Wts. Time Finished: 5;15pm
Cement .414/103 Concrete Placed, c.y.: 23
F.A. S.O 72 1505 Concrete Tamp: 77°F
I.A. Cyllnders Made: 5 - 8
C.A. 1850 Remarks:
Total Free Water 72 lbs.
Added at Mixer 178 lbs.
Total Water 250 lbs.
Certified Correct MFM
Inspector
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351~5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPOR~~ JOB NO.: 01.1054
CLIENT: ~as Unif~ DATE: 24 October 2001
PROJECT'~es & Maint. Fac., Co~pell SUPPLIER: Lattimore
LOCATION OF POUR SET 1: Piers: A/1, A.7/1, C.3/1 and G/2 at service center building
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO. 54
Truck No. 1039 Cement 414 Type I
Ticket No. 7109717 Flyash 103
Time Batched 3:44pm Sand 1433
Time Sampled 4:40pm in.
Concrete Temp. (ASTM C1064) 77°F 1.0 in. 1850
Air Content (ASTM C231) Water 250
Unit Weight (ASTM.C138) Admix //1 Plastocrete 161 ~ 15.5 oz.
Admix //2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
5 5.25 7 1 0/31/01 85,000 3010
6 5.25 28 11/21/01 129,700 4590
7 5.25 28 11/21/01 124,000 4390
8 5.25 56 1 2/1 9/01
28-Day Average 4490 3000
TECHNICIAN: MFM