Loading...
CF-Coppell Rd SC-LR011024 LOG OF BORING PROJECT: Coppell Field Office Service Center BORING NO: 11 Covered Storage CLIENT: Hooper Engineering Lab. LOCATION: Coppell, Texas Job # 01.1054 JOB NO: 01.0836 BORING TYPE: Continuous Sample DATE: 10/24/2001 DRILLER: Lawrence GROUND ELEVATION: Legend: B - Bag t~ c:: .~ S - Shelby Tube C - Core u. 0 ~~_ ~ ~ P - STD Penetration Test X - No Recove~ , = ~ ~o ~ ~ ~~ : -- T - THD Cone Penetration Test ~- Water Table D,~ription o[ Stratum  S 0.75 Grey clay, so~ & moist 2.0' .. ~ S 2.25 Grey & tan clay, vo~ sti~ & moist 4.0' s ~ S a.00 Tan & ~rey clay, hard & moist S 4.00 8.0'  S 2.50 ~0 Orange & grey sandy clay, ve~ stiff & moist 15 20 End of boring 10' 25 30 35 40 Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: A/l, A.7/1, C.3/1 and G/2 at service center building LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 1039 Cement 414 Type I Ticket No. 7109717 Flyash 103 Time Batched 3:44pm Sand 1433 Time Sampled 4:40pm in. Concrete Temp. (ASTM C1064) 77°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C138) Admix #1 Plastocrete 161 @ 15.5 oz. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 5 5.25 7 10/31/01 6 5.25 28 11/21/01 7 5.25 28 11/21/01 8 5.25 56 12/19/01 85,000 3010 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: A/l, A.7/1, C.3/1 and G/2 at service center building LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 1039 Cement 414 Type I Ticket No. 7109717 Flyash 103 Time Batched 3:44pm Sand 1433 Time Sampled 4:40pm in. Concrete Temp. (ASTM C1064) 77°F 1.0 in. 1850 Air Content IASTM C231) Water 250 Unit Weight IASTM C138) Admix //1 Plastocrete 161 @ 15.5 oz. Admix //2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 5 5.25 7 10/31/01 85,000 301 0 6 5.25 28 11/21/01 :~ 29,700 4590 7 5.25 28 11/21/01 :~24 ,QOQ 4390 8 5.25 56 12/19/01 :~4:5,900 5090 28-Day Average 4490 3000 TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell, TX JOB NO.: 01.1054 DRILLER: D & D Drilling TIME: 7:00am-6:00pm 10.0 hrs./1.0 hr. OT PIER SHAFT BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER MARK DIA, SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE Service Center 54-G/1 24" 72" ok/ok 13.0' 13.3' 13.3' 3:25 -2.8' None 53-F.3/1 24" 72" ok/ok 13.0' 13.2' 13.3' 3:30 -2.5' None 52-E.7/1 24" 72" ok/ok 13.0' 13.2' 13.2' 3:35 -2.6' None 49-C.7/1 24" 72" ok/ok 13.0' 13.0' 13.2' 3:40 -2.5' None 48-C.3/1 24" 72" ok/ok 13.0' 13.3' 13.3' 4:35 -2.6' None 47-A.7/1 24" 72" ok/ok 13.0' 13.3' 13.3' 4:40 -2.5' None 46-A/1 24" 72" ok/ok 13.0' 13.3' 13.3' 4:45 -2.3' None 68-G/2 24" 72" ok/ok 13.0' 13.3' 13.3' 4:50 -2.3' None 67-F. 1/2 24" 72" ok/ok 13.0' 13.0' 13.2' 5:08 -2.2' None 66-E.7/2 24" 72" ok/ok 13.0' 13.2' 13.2' 5:12 -6.3' None REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Top of concrete at pier E.7/2 left approx. 4' below plan grade due to running out of concrete and plant closed. Superintendent for Texas Unified was present when this occurred. TECHNICIAN: MFM DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB NO. 01.10S4 CLIENT: Texas Unified Constructors, Inc. DATE: 24 October 2001 PROJECT: Field Service Offices & Maintenance Facility, Coppell, TX WEATHER: Clear/Windy CONCRETE SUPPLIER: Lattimore AIR TEMP: 75-80°F LOCATION OF CONCRETE PLACED: 10 Piers (See Pier Inspection Report of 10/24/01~ Materials Design Mix Cement: Mix 54 ,3000 psi Brand Holnam Type I Source'?J~.It_~_~J~lL~ #7 Max. Water-Cement Ratio by weight Aggregate Type Source Batch Weights - S. S. Dry Basis: Size F.A. ..0 - #4 .Sand Lattimore Cement 414/103 F.A. 1433 I.A. I.A. C.A. 185Q C.A. 1" - #4 Cr. Stone Lattimore Admix Plastocrete 161 @ 15.5 6z/yd Actual Batch Computations: Time Started: 3:-lSpm % Free Actual Moisture Water Batch Wts. Time Finished: 5;15pm Cement .414/103 Concrete Placed, c.y.: 23 F.A. S.O 72 1505 Concrete Tamp: 77°F I.A. Cyllnders Made: 5 - 8 C.A. 1850 Remarks: Total Free Water 72 lbs. Added at Mixer 178 lbs. Total Water 250 lbs. Certified Correct MFM Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351~5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPOR~~ JOB NO.: 01.1054 CLIENT: ~as Unif~ DATE: 24 October 2001 PROJECT'~es & Maint. Fac., Co~pell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: A/1, A.7/1, C.3/1 and G/2 at service center building LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 1039 Cement 414 Type I Ticket No. 7109717 Flyash 103 Time Batched 3:44pm Sand 1433 Time Sampled 4:40pm in. Concrete Temp. (ASTM C1064) 77°F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM.C138) Admix //1 Plastocrete 161 ~ 15.5 oz. Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 5 5.25 7 1 0/31/01 85,000 3010 6 5.25 28 11/21/01 129,700 4590 7 5.25 28 11/21/01 124,000 4390 8 5.25 56 1 2/1 9/01 28-Day Average 4490 3000 TECHNICIAN: MFM DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148