Loading...
CF-Coppell Rd SC-LR011023Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT~F CONCRETE TESTS JOB NO.: CLIENT:~ Texas Unified Constructors, Inc. DATE: PROJECt[:! Field Semi'Offices & Maint. Fac., Coppell SUPPLIER: LOCATION,[;;I~'OUR SET 1: Piers: AA/1.5, C.7/0.1, E.1/0.1, E.1/1, E.5/0.1, E.5/1, E.7/0.1, G.1/1.5, G.2/1.5 and G.3/1.5 LOCATION OF POUR SET 2: 01.1054 23 October 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 964 Cement Ticket No. 3135524 Flyash Time Batched 2:16pm Sand Time Sampled 3:10pm in. Concrete Temp. (ASTM C1064) 78°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 54 414 Type I 103 1433 1850 250 Plastocrete 161 @ 15.5 oz. COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Number Inches Days Date {ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 1 5.00 7 1 0/30/01 2 5.00 28 11/20/01 3 5.00 28 11/20/01 4 5.00 56 1 2/1 8/01 86,7OO 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Texas Unified Constructors, Inc. DATE: PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: LOCATION OF POUR SET 1: Piers: AA/I.5, C.7/0.1, E.1/0.1, E.1/1, E.5/0.1, E.5/1, E.7/0.1, G.1/1.5, G.2/1.5 and G.3/1.5 LOCATION OF POUR SET 2: 01.1054 23 October 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 964 Cement Ticket No. 3135524 Flyash Time Batched 2:16pm Sand Time Sampled 3:1 Opm in. Concrete Temp. (ASTM C1064) 78°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) 54 414 Typel 103 1433 1850 25O Plastocrete 161 @15.5 oz. (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 1 5.00 7 1 0/30/01 2 5.00 28 11/20/01 3 5.00 28 11/20/01 4 5.00 56 1 2/1 8/01 86,700 3070 122,500 4330 122,100 4320 28-Day Average 4330 3O00 TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Texas Unified Constructors, Inc. DATE: PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: LOCATION OF POUR SET 1: Piers: AA/1.5, C.7/0.1, E.1/0.1, E.1/1, E.5/0.1, E.5/1, E.7/0.1, G.1/1.5, G.2/1.5 and G.3/1.5 LOCATION OF POUR SET 2: 01.1054 23 October 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 964 Cement Ticket No. 3135524 Flyash Time Batched 2:16pm Sand Time Sampled 3:1 Opm in. Concrete Temp. (ASTM C1064) 78°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA 54 414 Typei 103 1433 1850 250 Plastocrete 161 @ 15,5 oz. COMPRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 1 5.00 7 10/30/01 2 5.00 28 11/20/01 3 5.00 28 11/20/01 4 5.00 56 12/18/01 86,7OO 3O7O 122,500 ~4330 122,100 f}~320 ) 132,000 [ 4.,670 28-Day Average ~'~"330 3O00 TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: ~ctors, Inc:, ~_ DATE: :?3 October 2001 PROJECT/ Field Service Offices & Maintenanc Facj JOB NO.: 01.1054 MATERIAL DESCRIFTION: 1) Sele~wn Clayey Sand ASTM D 698 STANDARD PROCTOR: 1) 111.0 pcf @ 13.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Building //1 Pad (Main Bldg.) 48) approx. 20' south of north bldg. line 1 3 14.2 113.3 102.0 95 + approx. 20' west of east bldg. line Optimum +/- 2% 49) approx. 20' south of north bldg. line 1 2 13.6 112.6 101.4 approx. 20' west of east bldg. line 50) approx. 20' south of north bldg. line 1 1 12.8 109.1 98.3 approx. 20' west of east bldg. line Building //3 Pad (Chemical Stora.qe Bldg.) 51) approx. 25' north of south bldg. line 1 3 13.3 118.2 106.5 approx. 10' west of east bldg. line 52) approx. 25' north of south bldg. line 1 2 12,5 115.6 104.1 approx. 10' west of east bldg. line 53) approx. 25' north of south bldg. line 1 1 15.0 1 09.3 98.1 approx. 10' west of east bldg. line Building //2 Pad (Utility Stora.qe BId.~.) 54) approx. 20' south of north bldg. line I 3 12.6 113.5 102.3 approx. 40' west of east bldg. line 55) approx. 20' south of north bldg. line 1 2 13.1 111.1 100.1 approx. 40' west of east bldg. line 56) approx. 20' south of north bldg. line 1 1 12.9 113.0 101.8 approx. 40' west of east bldg. line 57) approx. 15' north of south bldg, line 1 3 15.0 112.7 101.5 approx. 30' east of west bldg. line 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Texas Ur~ified Constructors, Inc. Page Two Field Service Offices & Maintenance Fac.-Coppell 23 October 2001 In-Place Density Tests MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Building #2 Pad (Utility Storage Bldg.) 58) approx. 15' north of south bldg. line 1 2 12.6 116.6 105.1 95+ approx. 40' west of east bldg. line Optimum +/- 2% 59) approx. 15' north of south bldg. line 1 1 14.2 109.3 98.8 approx. 40' west of east bldg. line TECHNICIAN: CDJ DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. Hooper Engineering Laboratories, Inc. Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: Texas Unified Constructors, Inc. DATE: 23 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell, TX JOB NO.: 01.1054 DRILLER: D & D Drilling TIME: 10:00am-5:3Opm 7.0 hrs./0.5 hrs. OT PIER SHAFT BELL ALIGN/ REQ'D INITIAL FINAL FINAL TOP OF WATER MARK DIA. SIZE PLUMB DEPTH DEPTH DEPTH POUR CONC. ELEV. IN HOLE Service Center 55-G.3/1.5 18" 48" (5)/ok 13.0' 13.3' 13.6' 3:00 -2.1' None 56-G.2/1.5 18" 48" (5)/ok 13.0' 13.5' 13.5' 2:58 -2.8' None 57-G.1/1.5 18" 48" (5)/ok 13.0' 13.3' 13.3' 2:55 -2.9' None 42-E.7/0.1 18" 48" ok/ok 13.0' 13.4' 13.4' 3:05 -3.0' None 43-E.5/0.1 18" 48" ok/ok 13.0' 13.2' 13.2' 3:08 -3.0' None 44-E.1/0.1 18" 48" ok/ok 13.0' 13.0' 13.0' 3:18 -3.0' None 45-C.7/0.1 18" 48" ok/ok 13.0' 13.1' 13.3' 3:20 -3.1' None 51-E.5/1 18" 48" ok/ok 13.0' 13.3' 13.5' 3:12 -2.8' None 50-E.1/1 18" 48" ok/ok 13.0' 13.0' 13.0' 3:15 -2.6' None 58~AA.8/1.5 18" 48" ok/ok 13.0' 13.3' 13.4' 5:00 -2.4' None 59-AA.5/1.5 18" 48" ok/ok 13.0' 13.3' 13.4' 4:55 -2.2' None 60-AA/1.5 18" 48" ok/ok 13.0' 13.2' 13.5' 4:10 -1.0' None REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Required Depth is based upon existing grade at time of geotechnical investigation. Correct bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative to grade at time piers were drilled. Contractor must furnish actual elevation, if required. 5) Drilling operations began prior to inspector's arrival. TECHNICIAN: MFM DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB NO. CLIENT: Texas Unified Constructors, Inc. DATE: 23 October 2001 PR03ECT: Field Service Offices & Maintenance Facility, Coppell, TX WEATHER: Clear/Light Wind CON3RETE SUPPLIER: Lattimore AIR TEMP: 85~88°F LOCATION OF CONCRETE PLACED: 12 Piers (See Pier Inspection Report of 10/23/0i),_ Materials Design Mix Cement: Mix 54 , 30.00 psi Brand Holnam Type I Source Bin @ Plant #3 Max. Water-Cement Ratio by weight Aggregate Type Source Batch Weights - S. S. Dry Basis: Size F.A. 0 - #4 Sand Lattimore Cement 4146103 F.A. ~433 I.A. I.A. C.A. 1850 C.A. 1" - #4 Cr. Stone Lattimore Admix Plastocrete _161 @ 15.5 o'z/yd Actual Batch Computations: Time Started: 2:45pm % Free Actual Moisture Water Batch Wts. Time Finished: 5~00pm Cement ..~14/103 Concrete Placed, c.y.: 13 F.A. S.0 72 1505 Concrete Temp: 78°F I.A. Cylinders Made: I . 4 C.A. 1850 Remarks: Total Free Water 7Z lbs. Added at Mixer 178 lbs. Total Water 250 lbs. Certified Correct MFM Inspector 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148