CF-Coppell Rd SC-LR011022Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 22 October 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 44) 45) 46) 47) Building #1 Pad (Main Bldg.) approx. 20' south of north bldg. line approx. 20' west of east bldg. line Building #3 Pad (Chem. Stora.qe Bldg.) approx. 20' north of south bldg. line approx. 20' west of east bldg. line Building #2 Pad (Utility Storage Bldg.) approx. 20' south of north bldg. line approx. 50' east of west bldg. line approx. 15' north of south bldg. line approx. 50' west of east bldg. line 1 Exist. Sub. 30.3 1 Exist. Sub. 29.1 1 Exist. Sub. 29.7 I Exist. Sub. 26.9 90.6 95.4 92.9 97.7 87.5 92.1 90.0 94.7 92-98 Min. + 4% Over Optimum NOTE: All tests passed job requirements for density and moisture. TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Construction Materials Testing REPORT OF WATER PRESSURE INJECTION Inc. CLIENT: PROJECT: SUPPLIER: LOCATION: PROCEDURE: Texas Unified Constructors, Inc. DATE: 22 October 2001 Field Service Offices & Maintenance Fac. for City of Coppell, TX Kenneth Moore JOB NO.: 01.1054 TIME: 8:00am-1:00pm 5.00 hours Covered Storage pad (Pass #7 ) NUMBER OF RIGS USED: 1 O~n 22 October 2001, a representative of Hooper Engineering Laboratories, Inc. visited the above named project during the time in which water pressure injection was taking place. During that time, he noted the following: SPECIFICATION REQUIREMENTS 1. Injection pressure 50 psi to 200 psi. 2. Injection downward in approx. 12" intervals until refusal (If No, see remarks below.) 3. Total depth of injection - 10 feet (If No, see remarks below.) 4. Spacing for injection approx. 5 feet maximum. (If No, see remarks below.) INSPECTION RESULTS: 150, 200 Yes Yes Yes TECHNICIAN: DISTRIBUTION: CBC (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. (1) Doyle Engineering Group 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148