Loading...
CF-Coppell Rd SC-LR010927Hooper Engineering Laboratories, Construction Materials Testing REPORT OF WATER PRESSURE INJECTION Inc. CLIENT: PROJECT: SUPPLIER: LOCATION: PROCEDURE: Texas Unified Constructors, Inc. DATE: 27 September 2001 Field Service Offices & Maintenance Fac. for City of CoppeII, TX Kenneth Moore JOB NO.: 01.1054 TIM E: 6:00am-5:00pm 10.0 hrs./1.0 hr. OT Building Pads (see below) NUMBER OF RIGS USED: 1 On 27 September 2001, a representative of Hooper Engineering Laboratories, Inc. visited the above named project during the time in which water pressure injection was taking place. During that time, he noted the following: SPECIFICATION REQUIREMENTS 1. Injection pressure 50 psi to 200 psi. 2. Injection downward in approx. 12" intervals until refusal (If No, see remarks below.) 3. Total depth of injection - 10 feet (If No, see remarks below.) 4. Spacing for injection approx. 5 feet maximum. (If No, see remarks below.) INSPECTION RESULTS: 200, 200, 200 Yes Yes Yes NOTES: Pass //2 completed on Vehicle & Equipment Storage pad. Pass //2 completed on Chemical Storage pad. TECHNICIAN: DISTRIBUTION: CBC (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. (1) Doyle Engineering Group 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148