CF-Coppell Rd SC-LR010918Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Texas Unified Constructors, Inc.
PROJECT:~s & Maintenance Fac.
DATE:
JOB NO.:
MATERIAL DESCRIPTION: 1) Borrow Fill - Dark Grey & Brown Clay with Gravel
18 September 2001
01.1054
ASTM D 698 STANDARD PROCTOR: 1) 99.0 pcf @ 20.5% Moisture
34)
35)
36)
37)
LOCATION PROCTOR LIFT
Fire Lane/Drive South of Buildin.q
approx. 20' south of south bldg. line
approx. 30' west of east bldg. line
East Parking Area
approx. 100' north of south bldg. line
approx. 30' west of east bldg. line
approx. 175' north of south bldg. line
approx. 50' west of east bldg. line
approx. 225' north of south bldg. line
approx. 60' west of east bldg. line
MOISTURE DRY PERCENT
CONTENT DENSITY COMPACTION
% PCF %
1 3 21.0 99.0 100.0
1 1 21.4 95.1 96.1
1 1 21.7 96.1 97.1
1 1 20.6 97.2 98.2
REQUIRED
COMPACTION
%
95+
-1% to +3%
Of Optimum
TECHNICIAN:
DISTRIBUTION:
CDJ
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148