Loading...
CF-Coppell Rd SC-LR010914Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: JOB NO.: PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX MATERIAL DESCRIPTION: 1) Borrow Fill - Dark Grey & Brown Clay with Gravel ASTM D 698 STANDARD PROCTOR: 1)99,0pcf@ 20.5% Moisture 24) LOCATION PROCTOR LIFT Southwest Parking Area approx. 50' S of N curbline approx. 25' E of W curbline 14 September 2001 .01.1 O54 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 25) approx. 20' N of S curbline approx. 50' E of W curbline 1 1 22,8 94.0 95.0 26) approx. 75' N of S curbline approx. 20' W of E curbline 1 1 20,5 100.2 101.2 27) Parking Area/Drive West of Main BId,q, approx. 30' N of S bldg, line approx. 30' W of W bldg. line 1 1 21.5 95.5 96.5 28) Fire Lane/Drive South of Main Bldg. approx. 35' S of S bldg. line approx. 50' E of W bldg, line 1 1 20,7 100.1 101,1 29) approx. 20' S of S bldg. line approx. 125' E of W bldg, line 1 2 20.8 96.9 97.9 30) approx. 35' S of S bldg, line approx. 110' E of W bldg. line 1 2 21.6 97.4 98.4 31) Main Building approx, 30' N approx. 50' E Pad of S bldg, line of W bldg. line 1 1 20.6 99,9 100,9 32) approx. 75' N of S bldg, line approx. 20' E of W bldg, line 1 2 25,5 94.2 95,2 33) approx, 15' S of N bldg, line approx, 60' E of W bldg. line TECHNICIAN: CDJ 1 2 28,2 94.1 95.1 1 2 26.3 91.6 92.5 95+ -1% to +3% Of Optimm 92-98 Min. +4% Over Optimum 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148