CF-Coppell Rd SC-LR010913Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Texas Unified Constructors, Inc.
DATE: 13 September 2001
PROJECT: Field Service Offices & Maintenance Fac.
Coppell, TX
JOB NO.: 01.1054
MATERIAL DESCRIPTION: 1) Borrow Fill - Dark Grey & Brown Clay with Gravel
ASTM D 698 STANDARD PROCTOR: 1) 99.0 pcf @ 20.5% Moisture
22)
23)
LOCATION PROCTOR LIFT
Fire Lane/Drive East of Main Bldg.
approx. 10' south of north bldg. line
approx. 25' east of east bldg. line
approx. 25' north of south bldg. line
approx. 15' east of east bldg. line
1 1
MOISTURE DRY PERCENT
CONTENT DENSITY COMPACTION
% PCF %
19.5 100.2 101.2
1 1 23.4 98.2 99.2
REQUIRED
COMPACTION
%
95+
-1% to +3%
Of Optimum
TECHNICIAN:
DISTRIBUTION:
CDJ
(3) City of Coppell
(1) Vidaud & Associates
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148