Loading...
CF-Coppell Rd SC-LR010913Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 13 September 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1) Borrow Fill - Dark Grey & Brown Clay with Gravel ASTM D 698 STANDARD PROCTOR: 1) 99.0 pcf @ 20.5% Moisture 22) 23) LOCATION PROCTOR LIFT Fire Lane/Drive East of Main Bldg. approx. 10' south of north bldg. line approx. 25' east of east bldg. line approx. 25' north of south bldg. line approx. 15' east of east bldg. line 1 1 MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % 19.5 100.2 101.2 1 1 23.4 98.2 99.2 REQUIRED COMPACTION % 95+ -1% to +3% Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148