Loading...
CF-Coppell Rd SC-LR010912Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 12 September 2001 15) 16) 17) 18) 19) 20) 21) PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Dark Grey Clay 2) Borrow Fill - Dark Grey & Brown Clay with Gravel ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture 2) 99.0 pcf @ 20.5% Moisture LOCATION PROCTOR LIFT MOISTURE CONTENT % DRY DENSITY PCF Main Building Pad approx. 30' south of north bldg. line approx. 30' east of west bldg. line PERCENT COMPACTION % approx. 30' north of south bldg, line approx. 40' east of west bldg. line 1 1 27.3 92.0 96.8 92.5 approx. 50' south of north bldg. line approx. 75' east of west bldg. line 27.3 89.0 Fire Lane/Drive South of Main Buildinq approx. 25' south of south bldg. line approx. 50' east of west bldg. line Exist. Sub. 30.8 93.2 approx. 25' south of south bldg. line approx. 125' east of west bldg. line Exist. Sub. 25.0 9! .6 approx. 20' north of south bldg. line approx. 30' west of west bldg. line Exist. Sub. 25.1 90.9 Main Entrance Drive approx. 100' east of Coppell Rd. 2 24.4 96.3 TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. 97.4 23.5 93.7 98.1 96.4 95.7 97.3 REQUIRED COMPACTION % 92-98 Min. + 4% Over Optimum 95+ -1% to +3% Of Optimum 95+ -1% to +3% Of Optimum 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148