CF-Coppell Rd SC-LR010911Hooper Engineering Laboratories,
Construction Materials Testing
Inc.
IN-PLACE DENSITY TESTS
CLIEN-[ Texas Unified ConstrL Inc.
DATE: 11 September 2001
PROJECT: Field Offices & Maintenance Fac.
Coppell, TX
JOB NO.: 01.1054
MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay
ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf ~b 22.0% Moisture
LOCATION PROCTOR LIFT
7)
East Parking Area
approx. 50' north of south curbline
approx. 20' west of east curbline
1 Exist. Sub.
8) approx. 150' north of south curbline
approx. 25' west of east curbline
1 Exist. Sub.
9) approx. 325' north of south curbline
approx. 25' west of east curbline
1 Exist. Sub.
10) approx. 300' north of south curbline
approx. 75' west of east curbline
1 Exist. Sub.
11) approx. 200' north of south curbline
approx. 75' west of east curbline
1 Exist. Sub.
12) approx. 50' north of south curbline
approx. 75' west of east curbline
1 Exist. Sub.
13)
Entrance Drive
approx. 150' east of Coppell Rd.
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
14) approx. 50' east of Coppell Rd.
TECHNICIAN: CDJ
DISTRIBUTION:
24.6
24.7
24.6
22.7
25.0
25.0
92.4
91.8
90.9
94.9
91.5
91.0
97.4
96.7
95.7
99.9
96.3
95.8
1 1 24.9 93.5 98.4
1 1 22.5 96.0 101.1
(3) City of Coppell
(1) Vidaud & Associates
(1) Texas Unified Constructors, Inc.
95+
-1% to +3%
Of Optimum
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148