Loading...
CF-Coppell Rd SC-LR010911Hooper Engineering Laboratories, Construction Materials Testing Inc. IN-PLACE DENSITY TESTS CLIEN-[ Texas Unified ConstrL Inc. DATE: 11 September 2001 PROJECT: Field Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf ~b 22.0% Moisture LOCATION PROCTOR LIFT 7) East Parking Area approx. 50' north of south curbline approx. 20' west of east curbline 1 Exist. Sub. 8) approx. 150' north of south curbline approx. 25' west of east curbline 1 Exist. Sub. 9) approx. 325' north of south curbline approx. 25' west of east curbline 1 Exist. Sub. 10) approx. 300' north of south curbline approx. 75' west of east curbline 1 Exist. Sub. 11) approx. 200' north of south curbline approx. 75' west of east curbline 1 Exist. Sub. 12) approx. 50' north of south curbline approx. 75' west of east curbline 1 Exist. Sub. 13) Entrance Drive approx. 150' east of Coppell Rd. MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 14) approx. 50' east of Coppell Rd. TECHNICIAN: CDJ DISTRIBUTION: 24.6 24.7 24.6 22.7 25.0 25.0 92.4 91.8 90.9 94.9 91.5 91.0 97.4 96.7 95.7 99.9 96.3 95.8 1 1 24.9 93.5 98.4 1 1 22.5 96.0 101.1 (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. 95+ -1% to +3% Of Optimum 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148