Loading...
CF-Coppell Rd SC-LR010907op Eng neering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 7 September 2001 PROJECT: Field Service Offices & Maintenance Fac. Coppell, TX JOB NO.: 01.1054 MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0pcf @ 22.0% Moisture 1) LOCATION PROCTOR LIFT Main Buildinq approx. 30' south of north bldg. line approx. 80' east of west bldg. line 2) approx. 30' north of south bldg. line approx. 80' east of west bldg. line approx. 10' north of south bldg. line approx. 10' east of west bldg. line 4) approx. 10' south of north bldg. line approx. 10' east of west bldg. line 5) 6) Main Entrance Drive approx. 250' east of Coppell Road approx. 125' east of Coppell Road 1 Exist. Sub. 1 Exist. Sub. 1 Exist. Sub. 1 Exist. Sub. t Exist. Sub. 1 Exist. Sub, MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 28.3 90.6 95.4 27.7 92.6 97.5 26.6 92,2 97.1 28.6 88.8 25.0 95.7 100.7 24.4 92.9 97.8 92-98 Min. + 4% Over Optimum 95+ -1% to +3% Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 LMC Lalt~o.,~ R~ a~t' Mix g 'l~ra~'~a t~ a~ mix ~gn Mil acmeve f~ p~ce~t and ~urlng o~n~ In AC130~336 am fcll~. ;fl aceo~n~ ~ ~ ~, ~ ~la Co ~ues~ ~t copies · ~n~ ~ ~ f~ed ~ ~ Q~I~ 3ontm~ ~pa~em.