Coppell Industrial-LR010629 GEOTECHNICALAND J ~ F~ ri U ~
ENVlP, ONHENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 135
cio Champion Partners, Ltd. REG PROJECT NO. 7394
'15601 Dallas Parkway, Suite ~100 SAMPLE DATE: 06-29-01
Addison, Texas 75001 TECHNICIAN: H. Johnson
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
I Floor slab: F to G and 11 to 12 10/580
2 Floor slab: E to F and 13 to 14 1101580
3 Floor slab: F to G and 14 to 15 2101580
4 Floor slab: E to F and 15 to 16 310/580
5 Floor slab: F to G and 16 to 17 410/580
6 Floor slab: E to F and 17 to 18 5101580
Design Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
Potter 9349 4000
Test Results
Set I CHinder] Age@ Tota, Load I CompressiveI Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 0035 07-06-01 7 123020 4350
0035 07-27-01 28 149000 5270
0035 07-27-01 28 154960 5480 5380
2 0036 07-06-01 7 132290 4680
0036 07-27-01 28 147840 5230
0036 07-27-01 28 156280 5530 5380
3 0037 07-06-01 7 112250 3970
0037 07-27-01 28 142150 5030
0037 07-27-01 28 145030 5130 5080
4 0038 07-06-01 7 114060 4040
0038 07-27-01 28 145480 5150
0038 07-27-01 28 152010 5380 5270
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · T~-_ [214] 350 5600 · F~X [214] 350 0019
Set · Cylinder Age @ Total Load Compressive Average
No. ; ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
5 0039 07-06-0~ 7 1 ' 9500 4230
0039 07-27-0' 28 146930 5200
0039 07-27-0' 28 150--'50 5320 5260
6 0040 07-06-0' 7 ! ' 9240 4220
00/0 07-27-0' 28 ~ 436 ~0 5080
00,:0 07-27-0 ~ 28 ~ 483 ~ 0 5250 5170
Cylinder Data
Set ; Cylinder ! Time of Concrete Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 0035 5.50 5:25AM 77 80 N;A 612536
2 0036 5.00 6:25AM 77 84 N;A 612546
3 0037 5.00 7:00AM 75 83 N/A 612556
~ 0038 5.00 8:15AM 8 ! 86 N~A 612566
5 0039 5.50 9:20AM 84 90 N,'A 612576
6 00'" 0 5.50 ~ 0:10AM 83 69 N~A 612586
Mail Submitted by:
Distribution: (1)Champion Partners. Ltd.'
Mr. Kerry Burden REED ENGINEERING GROUP, INC.
(i) C.D.Henderson. Inc.~
Mr. Jason Nunley o-~r~l s:gqed ~,'.-
(1) AECC. Inc.~Mr. Fran Carter
~1 ) Haynes Whayley Associates. Inc./ Keith Atkins
Mr. Kent Peqrod KEA/je
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Potter Concrete/Mr. Brent Cox
Extranet
Distribution: (1 ~ Meinhardt & Quintana~
Mr. David Meinhardt
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 134
c/o Champion Partners, Ltd. REG PROJECT NO. 7394
15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-29-01
Addison, Texas 75001 TECHNICIAN: W. Eberhardt
ATTN: Mr. Kerry Burden
CONTRACTOR: C.D. Henderson, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Piers: N-5.1, N-5.7 and N-4.8 40/50
Design Information
I Source of Concrete I Mix Identification I Specified Strength p.s.i.
I
Potter 9337 3000
Test Results
Set [Cylinder] Age@ TotalLoad I CompressiveI Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
1 9994 07-06-01 7 102910 3640
9994 07-27-01 28 133740 4730
9994 07-27-01 28 134380 4760 4750
Cylinder Data
Set Cylinder I Timeof I Concrete Air I Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 9994 6.00 1:30PM 93 89 N/A 612599
Mail Submitted by:
Distribution: (1) Champion Partners, Ltd./
Mr. Kerry Burden REED ENGINEERING GROUP, INC.
(1) C.D.Henderson, Inc./
Mr. Jason Nunley Original Signed By
(1) AECC, Inc./Mr. Fran Carter
(1) Haynes Whayley Associates, Inc./ Keith Atkins
Mr. Kent Penrod KEA/je
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Potter Concrete/Mr. Brant Cox
Extranet
Distribution: (1) Meinhardt & Quintana/
Mr. David Meinhardt
2424 STUTZ DR. · SUITE 400 ,, DALLAS. TX 75235 · TEL [214] 350 5600 ' FAX [214] 350 0019