Loading...
Verizon-LR 990128CONCRETE COMPRESSIVE Date of Service: 12/01/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 STRENGTH TESI' ENGINEERIlX~, INC. -8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9832456 Project No.: 43-2333-98 Report Date 01/28/1999 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: West side pit slab, Area B CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 5.75 12/08/1998 ! 2 5.75 12/08/1998 1 3 5.75 12/29/1998 1 4 5.75 12/29/1998 1 5 5.75 01/26/1999 PROJECT DATA CONCRETE CLASS: N/A PLACEMENT DATE: 12/01/1998 BATCH TIME: l:31pm TIMESAMPLEO: 2:10pm BY: Mike Odom WEATHER CONDITIONS: Partly cloudy TEMPERATURE (F)-AIR 73 F CONCRETE: 76 ~ TRUCK NO: 806 TICKET NO: 1191562 AIR CONTENT (%): 1.4% UNITWEIGHT (oeO: N/A PLACEMENT LOCATION: Building Area (B) ~ elevator (passenger) pit slabs/columns (~ Building .area (B) (~ elevator (passenger) pit slabs/columns (~ M-5-9.7, Area B Level I-2 columns at G-IS/H-14, 15, Area C, Level I-2. REPORT OF TESTS ACCUMULATIVE YARDS: MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (Ibs.~rce) (psi) 7 131030 4630 7 130040 4600 Average 4620 28 208260 7370 28 207770 7350 Average 7360 56 224030 7920 16.5 FRACTURE TYPE Pit slabs only require 4000 "but" same 5000 Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (1) The Beck Group Started: 1:30pm ( 1 ) The Beck Group (1) Dalcan. psi mix used. Finished: 3:00pm Eugene~arbour Vic~¢President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 0ILL Page I of I CONCRETE COMPRESSIVE STRENGTH TEST "8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/28/1998 08644025 Report No.: 9834785 Project No.: 43-2333-98 Report Date 01/28/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 3 I SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/28/1998 BATCH TIME: 6:27am TIME SAMPLED: 7:40am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 561 AIR CONTENT (%): N/A PLACEMENT LOCATION: Level Ill west wing slab A-D & I-5.7 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) Fair 34 v CONCRETE: 56 F TICKET NO: 1202572 UNIT WEIGHT (pc0: NA I 1 6.25 12/31 / 1998 3 92040 1 2 6.25 01/04/! 999 7 118370 1 3 6.25 01/04/1999 7 121550 Average I 4 6.25 01/25/1999 28 150730 1 5 6.25 01/25/1999 28 161700 Average I 6 6.25 02/22/1999 56 ACCUMULATIVE YARDS: 500 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3250 4190 4300 4250 5330 5720 5530 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 7 Report No.: 9834785 Sample location: Level III in Beam G-4 between Line A-B This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval ofHBC Engineeri~g~n¢. 0ILL Page 2 of 7 CONCRETE COMPRESSIVE STRENGTH TEST ENG~EERll~, INC. "8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/28/1998 08644025 Report No.: 9834785 Project No.: 43-2333-98 Report Date 01/28/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/28/1998 BATCB TIME: 8:49am TIME SAMPLED: 9:20am BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (F)-AIR 48 F CONCRETE: 55 F TRUCK NO: 571 TICKET NO: 1202713 AIR CONTENT (%): N/A UNIT WEIGHT (pcl)': N/A PLACEMENT LOCATION: See page ! SAMPLE LOCATION: Level III slab @ Line C ~ 2 REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 I 6.25 12/31/1998 3 104610 3700 FRACTURE TYPE 2 2 6.25 01/04/1999 7 120840 4270 2 3 6.25 01/04/1999 7 125690 4440 Average 4360 2 4 6.25 0 !/25/1999 28 164400 5810 2 5 6.25 01/25/1999 28 148980 5270 Average 5540 2 6 6.25 02/22/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 7 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: Client: 12/28/1998 08644025 The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9834785 Project No.: 43-2333-98 Project: 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 01/28/1999 GTE Shared Services Coppeli Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 31 SPECIFICATION REQUIREMENTS STRENGTH: SLUMP: AIR: TEST METHOD: SAMPLE LOCATION: 5000 psi ~ 28 Days 6.0" Max N/A ASTM C-143 ASTM C- ! 72 ASTM C-39 Along Line B ~ 2.5 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/28/1998 BATCH TIME: 10:00am TIME SAMPLED: 10:45am BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 420 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Fair 52 F CONCRETE: 55 F TICKET NO: 1202816 UNIT WEIGHT (pcf~ N/A REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 1 5.75 12/31/I 998 3 96580 3420 ACCUMULATIVE YARDS: 500 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 3 2 5.75 01/04/1999 7 115490 4080 3 3 5.75 01/04/1999 7 121740 4310 Average 4200 3 4 5.75 01/25/! 999 28 157700 5580 3 5 5.75 01/25/1999 28 145410 5140 Average 5360 3 6 5.75 02/22/1999 56 0ILL This report is exclusively fur the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 4 of 7 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: Client No.: 12/28/1998 08644025 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 '~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9834785 Project No.: 43-2333-98 Report Date 01/28/1999 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 3 1 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi ~ 28 Days SLUMP: 6.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 12/28/1998 BATCH TIME: 11:19am TIME SAMPLED: 12:00pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 3 89 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I Partly cloudy 54 F CONCRETE: 56 F TICKET NO: 1202935 UNIT WEIGHT (pc0': N/A SAMPLE LOCATION: Along 3.5 ~ C REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 4 1 5.50 ! 2/31/1998 3 98510 3480 FRACTURE TYPE 4 2 5.50 01/04/1999 7 130540 4620 4 3 5.50 01/04/1999 7 134970 4770 Average 4700 4 4 5.50 01/25/1999 28 195570 6920 4 5 5.50 01/25/1999 28 204670 7240 Average 7080 4 6 5.50 02/22/1999 56 0ILL This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 5 of 7 CONCRETE COMPRESSIVE STRENGTH TEST "8901 Carpenter Frnvy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/28/1998 08644025 Report No.: 9834785 Project No.: 43-2333-98 Report Date 01/28/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: !2/28/1998 BATCHTIME: 1 l:58am PLANT: 31 TIME SAMPLED: l:05pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTIt: 5000 psi ~ 28 Days TEMPERATURE (F)-A1R 57 F CONCRETE: 57 F SLUMP: 6.0" Max TRUCKNO: 562 TICKETNO: 1202994 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along B.5 ~ 5.3 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTlt SET NO. (inches) TESTED (days) (lbs. force) (psi) 5 1 6.50 12/31/1998 3 71600 2530 5 2 6.50 01/04/1999 7 126740 4480 5 3 6.50 01/04/1999 7 123440 4370 Average 4430 5 4 6.50 01/25/1999 28 184470 6520 5 5 6.50 01/25/1999 28 180360 6380 Average 6450 5 6 6.50 02/22/1999 56 500 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 6 of 7 l~eport No.: 9834785 Ail samples from pump hopper. Technician: Mike Odom Report Distribution: (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. ( l ) The Beck Group Started: 6:00am (l) The Beck Group (I) Dalcan, Inc. Finished: 2:30pm H.~~g, Inc. Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 7 of 7 CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 12/29/1998 Client No.: 08644025 Report No.: 9834950 Project No.: 43-2333-98 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 -8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 01/28/1999 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/29/1998 BATCHTIME: 2:34pm PLANT: 4 ! TIME SAMPLED: 3:25pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTtI: 5000 psi @ 28 Days TEMPERATURE (V)-AIR 63 F CONCRETE: 69 V SLUMP: 6.0" Max TRUCK NO: 803 TICKET NO: 1204096 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0.: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: (15) Columns Level Ill-IV at A,B,C and Lines 2-5 = 15 (A-2 Column not !) ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D-4 REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 I 6.50 12/3 I/1998 2 48570 1720 35.5 FRACTURE TYPE 1 2 6.50 01/02/1999 4 116930 4140 I 3 6.50 01/05/1999 7 140670 4970 I 4 6.50 01/05/1999 7 141350 5000 Average 4990 1 5 6.50 01/26/1999 28 194130 6870 1 6 6.50 01/26/1999 28 186010 6580 Average 6730 This report is exclusively Ibp the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 2 Report No.: 9834950 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 7 6.50 02/23/1999 AGE (days) 56 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE Note: Entrapped air "not apparent". Technician: Mike Odom Report Distribution: (I) The Beck Group ( I ) Gromatzky Dupree & Assoc. (I) Brockette Davis Drake, Inc. (I) The Beck Group Started: 12:30pm (1) The Beck Group (1) Dalcan, Inc. Finished: 5:00pm  ering, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2