Verizon-LR 990125CONCRETE COMPRi,,dSIVE STRENGTH TESf
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/07/1999
08644025
Report No.: 9901423
Project No.: 43-2333-98
Report Date
01/25/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 31
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: AG 6
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
I I 6.50
I 2 6.50
1 3 6.50
1 4 6.50
1 5 6.50
1 6 6.50
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 01/07/1999 BATCH TIME: 1:48pm
T~MESAMeLED: 2:30pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 482
A~R CONTENT (%): N/A
PLACEMENT LOCATION:
Partly cloudy
57 F CONCRETE: 63 F
TICKET NO: 1209677
UNIT WEIGHT (pct'}.: N/A
Level IV building columns 19 ~ A, B, C, D-6, A, B, C ~ 7, AB & 8,N, M, L, K ~ 9, P,
N, M, L, K, J ~ 9.3
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
01/08/1999 1 46870 1660
01/09/1999 2
01/14/1999 7
01/14/1999 7
57350 2030
02/04/1999 28
02/04/1999 28
112220 3970
118060 4180
Average 4080
40
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HDC Engineering, Inc.
0ILL Page ! of 2
~eport No.:
9901423
CYLINDER
MARKED
SET NO.
I 7
MEASURED
SLUMP
(inches)
6.50
DATE
TESTED
03/04/1999
AGE
(days)
56
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lbs. force) (psi) TYPE
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockettc Davis Drake, Inc.
(1) Thc Beck Group
Started: 2:00pm
(I) The Beck Group
(I) Dalcan, Inc.
Finished: 5:30pm
Eugene 17arbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 2
CONCRETE COMPRLSSIVE STRENGTH TEST
.8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/12/1998
08644025
Report No.: 9833513
Project No.: 43-2333-98
Report Date
01/25/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive '
Coppell, Texas
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 43
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: C ~ 5
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 ! 5.50
1 2 5.50
1 3 5.50
1 4 5.50
I 5 5.50
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Groma~zky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(I) The Beck Group
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/12/1998 BATCH TIME: 10:17am
TIME SAMPLED: I l:20am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 450
AIR CONTENT (%): 1.3
PLACEMENT LOCATION:
Partly cloudy
48 F CONCRETE: 62 F
TICKET NO: 1197078
UNIT WEIGHT (pcO:' N/A
Building columns (4) west wing Level II-Iii, Line 5, A-D
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXI MUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
12/19/1998 7 89240 3160
12/I 9/1998 7 88620 3130
Average 3150
01/09/1999 28 176130 6230
01/09/1999 28 172350 6100
Average 6170
02/06/1999 56
10
FRACTURE
TYPE
Started: 1 l:OOam Finished: 1 l:30am H~ I~tc.
(I) Tile Beck Group
(,) Oa,ca,,. ,nc. Yu
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of I
CONCRETE COMPRv_,SSIVE STRENGTH TEST
Date of Service: 10/24/1998
Client No.: 08644025
Report No.: 9828983
Project No.: 43-2333-98
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
01/25/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 31
SPECIFICATION REQUIREMENTS
STRENGTH: 3000 psi ~ 28 Days
SLUMP: 5.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9506
PLACEMENT DATE: 10/24/1998 hATCH TIME: 9:28am
TIME SAMPLED: 10:35am nV: Brian Otis
WEATHER CONDITIONS: Clear/mild
TEMPERATURE (F)-AIR 70 F CONCRETE: 62 F
TRUCKNO: 364 TICKET NO: 1166392
AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A
PLACEMENT LOCATION:
Piers
SAMPLE LOCATION: Pier-F- 18
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 I 6.25
1 2 6.25
I 3 6.25
I 4 6.25
I 5 6.25
REPORT OF TESTS
DATE AGE
TESTED (days)
10/31/1998 7
10/31/1998 7
11/21/1998 28
11/21/1998 28
12/19/1998 56
ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
LOAD STRENGTH
(Ibs.~rce) (psi)
90370 3200
91747 3240
Average 3220
133490 4720
128560 4550
Average 4640
143060 5060
Technician time:
Technician: Brian Otis
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockctte Davis Drake, Inc.
(1) The Beck Group
See Report ~9828982 Sample taken from truck
Started:
( I ) The Beck Group
(1) Dalcan, Inc.
Finished:
10
Eug,~arbour
Vice President
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of I
CONCRETE COMPR,,,SSIVE STRENGTH TEST
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/18/1998
08644025
Report No.: 9834073
Project No.: 43-2333-98
Report Date
01/25/1999
Client: The Beck Group Project:
At-tn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/18/1998 BATCH TIME: 3:07am
PLANT: 41 TIME SAMPLED: 3:5am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 47 V CONCRETE: 67 F
SLUMP: 6.0" Max TRUCK NO: 834 TICKET NO: 1201177
AIR: 3-5O,/o AIR CONTEYr (%): 4.6 UNIT WEIGHT (pc.f): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
ASTM C- 172 North paving quadrant slab-on-grade bay 2 & 3, 4 & 5
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1
I 2
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
6.25 12/25/1998 7 78880 2790
6.25 ! 2/25/1998 7 79240 2800
Average 2800
6.25 01 / 15/1999 28 109780 3880
6.25 01/15/1999 28 102330 3620
Average 3750
I 3
1 5 6.25 02/12/1999 56
600
FRACTURE
TYPE
Sample location: Bay 3, 50' South from centerline north driveway.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page ! of 7
CONCRETE COMPRESSIVE STRENGTH TEST
'8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/18/1998
08644025
Report No.: 9834073
Project No.: 43-2333-98
Report Date
01/25/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppeli Road & Corporate Drive
Coppeli, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTth 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/18/1998 BATCH TIME: 4:25am
TIME SAMPLED: 4:45am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 463
AIR CONTENT (%): 4.5
PLACEMENT LOCATION:
See page I
Cloudy
47 F CONCRETE: 66 F
TICKETNO: 1201214
UNITWEIGHT(pc~ N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 600
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
2 I 5.75 12/25/1998 7 102400 3620
2 2 5.75 12/25/1998 7 99880 3530
Average 3580
2 3 5.75 01/15/1999 28 111540 3940
2 4 5.75 01/15/1999 28 120710 4270
Average 4110
2 5 5.75 02/12/1999 56
FRACTURE
TYPE
Sample location: Bay 2, 35' South from centerline north driveway and 40' west
from centerline bay 2.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 7
CONCRETE COMPR JSSIVE STRENGTH TEST
.8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/18/1998
08644025
Report No.: 9834073
Project No.: 43-2333-98
Report Date
01/25/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppeli Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AiR: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/18/1998 BATCH TIME: 5:38am
TIME SAMPLED: 6:35am BY: Mike Odom
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F)-AIR 47 F CONCRETE: 63 F
TRUCK NO: 461 TICKET NO: 1201267
AIR CONTENT (%): 4.8 UNIT WEIGHT (pet).: N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 6.50 12/25/1998 7 103080
3 2 6.50 ! 2/25/1998 7 101840
Average
3 3 6.50 01/15/1999 28 140160
3 4 6.50 01/15/I 999 28 133990
Average
3 5 6.50 02/12/1999 56
ACCUMULATIVE YARDS: 600
COMPRESSIVE
STRENGTH
(psi)
3650
3600
3630
4960
4740
4850
FRACTURE
TYPE
Sample location: Bay 3- 15' West from east edge and 120' north from centerline
north fire lane.
0ILL
This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 3 of 7
CONCRETE COMPRkSSIVE STRENGTH TEST
Date of Service: 12/18/1998
Client No.: 08644025
Report No.: 9834073
Project No.: 43-2333-98
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
01/25/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/18/1998 BATCHTIME: 7:10am
PLANT: 41 TIME SAMPLED: 7:40am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTm 4000 psi @ 28 Days TEMPERATURE (F)-AIR 48 F CONCRETE: 62 F
SLUMP: 6.0" Max TRUCK NO: 462 TICKET NO: 1201364
A1R: 3-5% AIR CONTENT (%): 4.9 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- i 43 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 1 6.00 12/25/1998
4 2 6.00 12/25/1998
4 3 6.00 01/15/1999 28
4 4 6.00 01/15/1999 28
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 103890
7 99340
Average
133430
129470
Average
4 5 6.00 02/12/1999 56
ACCUMULATIVE YARDS: 750
COMPRESSIVE
STRENGTH
(psi)
3670
3510
3590
4720
4580
4650
FRACTURE
TYPE
Sample location: Bay 3- 25' west from east edge and 100' north from centerline
north fire lane.
This report is exclusively {'or the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 4 of 7
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
12/18/1998
08644025
The Beck Group
Attn: Giilett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9834073
Project No.: 43-2333-98
Report Date
01/25/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, TeXas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST METUOO: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/18/1998 aATCR TIME: 8:24am
TIME SAMPLED: 8:50am ay: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 466
AIR CONTENT (%): 4.4
PLACEMENT LOCATION:
See page I
Cloudy
50 F CONCRETE: 62 F
TICKETNO: 1201524
UNITWEIGHT(pe~ N/A
SAMPLE LOCATION: See below
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AG E LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 I 5.50 12/25/1998 7 118790
5 2 5.50 12/25/1998 7 115140
Average
5 3 5.50 01 / 15/1999 28 153690
5 4 5.50 01/15/1999 28 147560
Average
5 5 5.50 02/l 2/1999 56
ACCUMULATIVE YARDS: 750
COMPRESSIVE
STRENGTH
(psi)
4200
4070
4140
5440
5220
5330
FRACTURE
TYPE
Sample location: Bay 3, 30' West from east edge and 55'north from centerline
north fire lane.
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 7
CONCRETE COMPR JSSIVE STRENGTH TEST
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/18/1998
O8644O25
Report No.: 9834073
Project No.: 43-2333-98
Report Date
01/25/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TX1
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
^m: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/18/1998 BATCH TIME: 10:08am
TIME SAMPLED: 10:45am By: Mike Odom
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F)-A1R 50 F CONCRETE: 68 F
TRUCKNO: 653 TICKETNO: 1201737
AIR CONTENT (%): 4.7 UNIT WEIGHT (pcf).: N/A
PLACEMENT LOCATION:
See page
REPORT OF TESTS ACCUMULATIVE YARDS: 750
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
6 I 5.75 12/25/1998 7 93940 3320
6 2 5.75 12/25/1998 7 102640 3630
Average 3480
6 3 5.75 01/15/1999 28 138880 4910
6 4 5.75 01/15/1999 28 138960 4910
Average 4910
6 5 5.75 02/12/1999 56
FRACTURE
TYPE
Sample location: Bay 4, 40' from north edge at centerline Bay 4.
This report is exclusively for the usc of thc client indicated above and shall DOt be reproduced except in full without thc written approval of HDC Engineering, Inc.
0ILL Page 6 of 7
CONCRETE COMPRkSSIVE STRENGTH TEST
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/18/1998
08644025
Report No.: 9834073
Project No.: 43-2333-98
Report Date
01/25/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and east
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: 3-5%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
7 1 6.25 12/25/1998
7 2 6.25 12/25/1998
7 3 6.25 01/15/1999
7 4 6.25 01/15/1999
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 12/18/1998 BATCH TIME: 1 l:30am
TIMESAMPLEO: 12:00pm aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 835
AIR CONTENT (%): 4.9
PLACEMENT LOCATION:
See page I
Drizzle, cloudy
51 F CONCRETE: 63 F
TICKET NO: 1201877
UNIT WEIGHT (pc0.: N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 830
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 96340 3410
7 98120 3470
Average 3440
28 129120 4570
28 133490 4720
Average 4650
7 5 6.25 02/I 2/I 999
56
FRACTURE
TYPE
Sample location: Bay 5, 10' from east edge
All samples obtained from pump hopper.
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I} Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 2:00am
(l) Thc Beck Group
(1) Dalcan. Inc.
and 50'
from north edge.
Finished: 12:30pm
Eugene Harbour
Vice President
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 7 of 7