Verizon-LR 990121CONCRETE COMPRESSIVE STRENGTH TEb £
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/08/1999
08644025
Report No.: 9901546
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: E @ 13
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
1 2 6.00
1 3 6.00
1 4 6.00
i 5 6.00
DATE
TESTED
01/15/1999
01/15/1999
PROJECT DATA
CONCRETE CLASS: 154
PLACEMENT DATE: 01/08/1999 BATCHTIME: 12:36pm
TIME SAMPLED: 1:10pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 383
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Cloudy
41 v CONCRETE: 38
TICKET NO: 1210825
UNIT WEIGHT (pc~D: N/A
Building Columns (19) Level III P, N, M, & K, J @ 9.1, N, M, L, K @ 10, E & F @ 1 I, E,
F,G@ 12, H,G,F,E @ 13
REPORT OF TESTS ACCUMULATIVE YARDS: 40
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH FRACTURE
(days) (lbs. force) (psi) TYPE
7 173300 6130
7 163110 5770
Average 5950
02/05/1999
02/05/1999
03/05/1999
28
56
Technician: Mike Odom
Report Distribution:
(!) The Beck Group
(1) Gromatzky Dupree & Assoc.
(!) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: l:00pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 4:00pm
H~ E~Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TESt
ENGINEER]~, INC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/08/1999
Client No.: 08644025
Report No.: 9901545
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENHTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METnOO: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/08/1999 BATCH TIME: 2:57am
TI1VIESAMPLED: 3:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 474
AIR CONTENT (%): 4.8
PLACEMENT LOCATION:
North paving limits to bay 4,5& 6
Foggy
46 v CONCRETE: 61 F
TICKET NO: 1209931
UNIT WEIGHT (pc.f): N/A
N limits bay 7 to 50' south of third island
SAMPLE LOCATION: See Below
REPORT OF TESTS ACCUMULATIVE YARDS: 450
cY~n~ER MEASURED MAx~nm COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
1 1 6.00 01/15/1999 7 114020 4030
1 2 6.00 01/15/1999 7 123530 4370
Average 4200
1 3 6.00 02/05/1999 28
1 4 6.00 02/05/1999 28
FRACTURE
TYPE
1 5 6.00 03/05/1999 56
Sample location: Bay 5, inside 31D island butlnose west from east limits. Ten
gallons of water added.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc.
01LL Page 1 of 5
CONCRETE COMPREoSIVE STRENGTH TES.t'
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/08/1999
08644025
Report No.: 9901545
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 4 1
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLtrM~: 6.0" Max
AIR: 3-6%
TEST M~T~O0: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
2 1 6.25
2 2 6.25
2 3 6.25
2 4 6.25
2 5 6.25
Sample location: Bay 7, 20'
Slump taken at hopper.
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/08/1999 BATCH X~: 4:08am
TIM~ SAMPLED: 4:35am BY: Mike Odom
WEATHER CONDITIONS: Foggy
TEMPERATURE (F) - AIR 46 r CONCRETE: 58 F
TRUCK r~o: 389 TICKET NO: 1209979
AIR CONTENT (%): 4.7 UmT WEIGHT (pct'): N/A
PLACEMENT LOCATION:
See page I
DATE
TESTED
01/15/1999
01/15/1999
REPORT OF TESTS ACCUMULATIVE YAR S: 450
MAX1NUUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 102250 3620
7 96040 3400
Average 3510
02/05/1999 28
02/05/1999 28
FRACTURE
TYPE
03/05/1999 56
south from centerline northeast driveway.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 2 of 5
CONCRETE COMPRE 'SIVE STRENGTH TES £
ENGINEF_RIi~, INC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/08/1999 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
9901545 Report Date
01/21/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METHOD: ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
3 1 6.00
3 2 6.00
3 3 6.00
3 4 6.00
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/08/1999 BATCH TIME: 5:08am
TIME SAMPLED: 5:45am BY: Mike Odom
WEATHER CONDITIONS: Foggy
TEMPERATURE (F) - AIR 46 v CONCRETE: 63 g
TRUCK NO: 802 TICKET NO: 12110033
AIR CONTENT (%): 5.0 UNIT WEIGHT (pc.f): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS ACCUMULATIVE YARDS: 450
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
01/15/1999 7 107030 3780
01/15/1999 7 100920 3570
Average 3680
02/05/1999 28
02/05/1999 28
FRACTURE
TYPE
3 5 6.00 03/05/1999 56
Sample location: Bay 6 centerline area, 20' south from northern islands. Ten
gallons of water added.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 3 of 5
CONCRETE COMPRi, SSIVE STRENGTH TEo r
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/08/1999
08644025
Report No.: 9901545
Project No.: 43-2333-98
Report Date
01/21/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METItOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Bay 4 centerpoint area
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/08/1999 BATCH TIME: 6: 12am
TIME SAMPLED: 7:10am BY: Mike Odom
WEATHER CONDITIONS: Light fog
TEMPERATURE (F) - AIR 45 F CONCRETE: 63 F
TRUCK NO: 474 TICKET NO: 1210112
AIR CONTENT (%): 5.2 UNIT WEIGHT (pcf): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS ACCUMULATIVE YARDS: 450
CYLINDER MEASURED MAXIMUM COMPRF_~SIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 1 6.00 01/15/1999 7 114320 4040
4 2 6.00 01/15/1999 7 122400 4330
Average 4190
4 3 6.00 02/05/1999 28
4 4 6.00 02/05/1999 28
4 5 6.00 03/05/1999 56
Ten gallons
of water added.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
01LL Page 4 of 5
CONCRETE COMPREoSIVE STRENGTH TES
.. 8901 Carpenter Frwy., Suite #100
Dalla% Texas 75247
Date of Service:
Client No.:
01/08/1999
08644025
Report No.: 9901545
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/08/1999 BATCH TIME: 8:01am
T~aESAMPLED: 8:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 802
AIR CONTENT (%): 5.0
PLACEMENT LOCATION:
See page 1
Cloudy
43 F CONCRETE: 60
TICKET NO: 1210298
UNIT WEIGHT (pc.f): N/A
SAMPLE LOCATION: See below
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
5 I 6.25 01/15/1999
5 2 6.25 01/15/1999
REPORT OF TESTS ACCUMULATIVE YARDS: 500
MAXIMLFM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 130550 4620
7 131110 4640
Average 4630
5 3 6.25 02/05/1999
5 4 6.25 02/05/1999
28
28
FRACTURE
TYPE
5 5 6.25 03/05/1999
56
Sample location: Bay 7 centerpoint area 20'
bullnose. Ten gallons of water added.
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(!) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 2:00am
(1) The Beck Group
(1) Dalcan, Inc.
south of
third southern island
Finished: 9:30am
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 5
CONCRETE COMPREoSiVE STRENGTH TE '
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/21/I 998 Report No.: 9834234 Report Date
01/21/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 31
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: N ~ 10
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 1 6.75
1 2 6.75
1 3 6.75
I 4 6.75
1 5 6.75
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(I) The Beck Group
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/21/1998 BATCH TIME: 1:28pm
TIME SAMPLED: 2:15pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 905
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Cloudy
38 F CONCRETE: 58 F
TICKETNO: 1202508
UNITWEIGHT(pcQ: N/A
Level II-I!I columns ~ F-G @ 12. F-G @ 13, F {~ 11, N,M, L,K ~ 9-7, N, M, L @ 10
REPORT OF TESTS ACCUMULATIVE YARDS: 25
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH FRACTURE
TESTED (days) (lbs. force) (psi) TYPE
12/26/1998 5 56480 2000
12/28/1998 7 82570 2920
01/18/1999 28 169640 6000
01/18/1999 28 182340 6450
Average 6230
02/15/1999 56
Started: 12:30pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 4:00pm
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 1
CONCRETE COMPRESSIVE STRENGTH TES,
Date of Service: 12/19/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9834168 Report Date
01/21/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppeli, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 3 1
SPECIFICATION REQUIREMENTS
STRENGTm 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/19/1998 BATCH TIME: 10:53am
TIME SAMPLED: 12:00pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 563
AIR CONTENT (%): 1.6
PLACEMENT LOCATION:
Cloudy
53 F CONCRETE: 62 F
TICKETNO: 1202182
UNITWEIGltT(pc0[ N/A
Level Il-IH Columns (~ E, 11, 12, 13, K-10, H-13
SAMPLE LOCATION: E-I 1
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP DATE
(inches) TESTED
1 I 6.75 12/26/1998
1 2 6.75 12/26/1998
1 3 6.75 01/16/1999
1 4 6.75 01/16/1999
REPORT OF TESTS
ACCUMULATIVE YARDS: 12.5
MAX I MUM COMPRESSIVE
AGE LOAD STRENGTH FRACTURE
(days) (lbs. force) (psi) TYPE
7 104310 3690
7 105160 3720
Average 3710
28 132060 4670
28 133890 4730
Average 4700
I 5 6.75 02/13/1999 56
Technician: ~ikeOdo .nMPLiES Start,
Report Distribution:
(1) The Beck G~up ' '
, (
(I) Groma~zky
(I) Brockette D~vis ~r~e,
(l) Thc Beck G~OFOjeC~
plans/specifications
~ based on our understanding
This repo~islekclfi$~e~e~jent nd cated
d: 1:00pm
roup
Finished: 2:30pm
m~Eu~ng~~arbou~, Inc.
Vice President
~ove and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 1
CONCRETE COMPRESSIVE STRENGTH TESt
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/17/1998
08644025
Report No.: 9833993
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOt~: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/11/1998 BATCH TIME: 2:1 lpm
TIME SAMPLED: 2:50pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 807
AIR CONTENT (%}: N/A
PLACEMENT LOCATION:
Fair
68 F CONCRETE: 68 V
TICKET NO: 1200949
UNIT WEIGHT (PC0; N/A
Building columns Level 2 & 3 ~ 9.3, P & L, 9-7, P & L
SAMPLE LOCATION:
See placement location
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 6.00 12/18/1998 7 139420
1 2 6.00 12/18/1998 7 138950
Average
1 3 6.00 01/08/1999 28 187780
1 4 6.00 01/08/1999 28 177900
Average
1 5 6.00 02/05/1999 56
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4930
4910
4920
6640
6290
6470
10
FRACTURE
TYPE
Note: These four (4) columns previously inspected (rebar).
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(l) Gromatzky Dupree & Assoc.
(l) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 2:30pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 4:30pm
~'ug~eHarbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of I
'CONCRETE COMPRESSIVE' STRENGTH TEo I'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
11/24/1998
08644025
Report No.: 9831863
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COt, rI~nCTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENaXH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TF~T M~THOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER
MARKED
SET NO.
1 1
MEASURED
SLUMP
(inches)
6.25
6.25
6.25
6.25
6.25
1 3
i 5
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 11/24/1998 BATCH T~m: 3:28am
TIME SAMPLED: 4:00am BY: Mike Odom
WEATHER CONDITIONS: Partly cloudy
TEMPERATURE (F) - AIR 62 F CONCRETE: 76 F
TRUCK NO: 456 TICKET NO: 1187703
AIR CONTENT (%): N/A uNrr WEIGHT (pcf): N/A
PLACEMENT LOCATION:
SW & West parking area, slab-on-grade thxu Line 3, placement #1
REPORT OF TESTS ACCUMULATIVE YARDS: 550
MAX~ COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
12/01/! 998 7 90360 3200
12/01/1998 7 92280 3260
Average 3230
12/22/1998 28 112980 4000
12/22/1998 28 i 15130 4070
Average 4040
01/19/1999 56 140480 4970
Sample location: 20' West from centerline firelane inside first driveway, along
centerline driveway.
FRACTURE
TYPE
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full wtthout the written approval ofHBC Eng, neenng Inc.
01LL Page 1 of 5
CONCRETE COMPR'v. SSIVE STRENGTH TEaT
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
11/24/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9831863
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Report Date
01/21/1999
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
cowrancxoR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTm 4000 psi @ 28 Days
SLVMe: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 11/24/1998 BATCH TIME: 4:55am
TnVm SAMPLED: 5:20am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 456
AIR CONTENT (%): 6.1%
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 4.75 12/0 I/1998 7 108360
2 2 4.75 12/01/1998 7 108090
Average
2 3 4.75 12/22/1998 28 125000
2 4 4.75 12/22/1998 28 123320
Average
2 5 4.75 01/19/1999 56 134260
Partly cloudy
62 v CONCRETE: 77 F
TICKET NO: 1187779
UNIT WEIGHT (pelf): N/A
ACCUMULATIVE YARDS:
COMPILESSIVE
STILENGTH
(psi)
3830
3820
3830
4420
4360
4390
4750
550
FRACTURE
TYPE
Sample location: Centerline southwest driveway limits, 175' northwest from
centerline firelane.
01LL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 2 of 5
CONCRETE COMPREoSiVE STRENGTH TES z'
Date of Service: 11/24/1998 Report No.:
Client No.: 08644025 Project No.:
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
9831863 Report Date
01/21/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 11/24/1998 BATCH TIME: 7:3 lam
TIME SAMPLED: 8:00am BY: Mike Odom
WEATHER CONDrrlONS: Cloudy
TEMPERATURE (F). AIR 62 F CONCRETE: 74 F
TRUCK NO: 453 TICKET NO: 1188049
AIR CONTENT (%): 5.5% UNIT WEIGHT (pcf): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION:
See below
REPORT OF TESTS ACCUMULATIVE YARDS: 550
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
4 1 4.25 12/01/1998 7 115130 4070
4 2 4.25 12/01/1998 7 113980 4030
Average 4050
4 3 4.25 12/22/1998 28 151660 5360
4 4 4.25 12/22/1998 28 152430 5390
Average 5380
4 5 4.25 01/19/1999 56 157110 5560
FRACTURE
TYPE
Sample location: N/S driveway bay area @ centerline, 30' south form north edge.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 5
CONCRETE COMPRE-oSIVE STRENGTH TESta'
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 11/24/1998 Report No.: 9831863 Report Date
01/21/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Atto: Gillett Berger Coppel! Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/24/1998 BATCH TIME: 6:06am
PLANT: 41 TIME SAMPLED: 6:30am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 62 F CONCRETE: 74 F
SLtrMP: 6.0" Max TRUCK NO: 462 TICKET NO: 1187873
AIR: N/A Am CONTENT (%): 5.6% UNiT WEIGHT (Pm: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- !72
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCtaVn LATrVE YARDS: 550
CYLrNDER MEASURED tAXnVn CoMPRESSlW
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 1 5.25 12/01/1998 7 106170 3750
3 2 5.25 12/01/1998 7 104330 3690
Average 3720
3 3 5.25 12/22/1998 28 124720 4410
3 4 5.25 12/22/1998 28 122110 4320
Average 4370
3 5 5.25 01 / 19/1999 56 182600 6460
Sample location: 40' South and 10' west from northeast corner paving placement
#1.
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 5
CONCRETE COMPREoSiVE STRENGTH TES
Date of Service: 11/24/1998
Client No.: 08644025
Report No.: 9831863
Project No.: 43-2333-98
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
01/21/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 752014619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
Pt. Am': 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
sump: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLAC~.MENT DATE: 11/24/1998 BATCH T~Vm: 8:32am
TIME SAMPLED: 9:15am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 669
Am CONTENT (%): 5.1%
PLACEMENT LOCATION:
See page !
Cloudy
70 v CONCRETE: 76+ F
TICKET NO: ! 188162
UNIT VOgIGHT (pcf}: N/A
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
See below
REPORT OF TESTS
ACCUMULATIVE YARDS: 580
MEASURED MAXIMUlVI COMPRESSIVE
SLUMP DATE AGE LOAD STRENGTH
(inches) TESTED (days) (lbs. force) (psi)
5 1 4.25 12/01/1998 7 89450 3160
5 2 4.25 12/01/1998 7 91560 3240
Average 3200
5 3 4.25 12/22/1998 28 132410 4680
5 4 4.25 12/22/1998 28 130090 4600
Average 4640
5 5 4.25 01/19/1999 56 135020 4770
FRACTURE
TYPE
Sample location: Parking area bay 2, 100' from west edge, along centerline.
Technician: Mike Odom
Report Distribution:
(i) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 2:30am
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 4:30pm
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 5
CONCRETE COMPRESSIVE STRENGTH TE £
Date of Service:
Client No.:
Client:
11/20/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
.. 8901 Carpenter Frwy., Suite #100
DnlIn% Texas 75247
9831603 Report Date
01/21/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLA~r: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUM~: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 I 5.75
I 2 5.75
1 3 5.75
1 4 5.75
1 5 5.75
PROJECT DATA
CONCRETE CLASS: 9508
PLnCV. MEt, Cr OAT~: 11/20/1998 aATCH Tn4E: 2:01pm
TnVmSAMPLED: 2:35pm aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F). AIR
TRUCK NO: 474
Am CONTENT (%): 1.4%
PLACEMENT LOCATION:
Cloudy
54 F CONCRETE: 79
TICKET NO: 1186325
UNIT WEIGHT (pc.O: N/A
Grade beam G9, Gl0 & 12 between 9.3-10, & 10-13, grade beam Line E between 15.%18
& Line 18 between E & E.3
REPORT OF TESTS ACCtnmrLaTIVZ YARDS: 30
MAXIMUM COMPRF_,SSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
11/27/1998 7 151560 5360
11/27/1998 7 150020 53 l0
Average 5340
12/18/1998 28 185000 6540
12/18/1998 28 183140 6480
Average 6510
01/15/1999 56 197310 6980
FRACTURE
TYPE
Sample location: Line E,
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(I) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
grade beam between 16.5,
Started: 2:00pm Finished: 3:00pm
(1) The Beck Group
(1) Dalcan, Inc.
17, first lift.
c.
Vice President
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPRE SIvE STRENGTH TES it'
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 11/20/1998 Report No.: 9831595 Report Date
01/21/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: I 1/20/1998 BATCHTIME: 2:26pm
PLANT: 41 TIME SAMPLED: 3:05pm BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 56 F CONCRETE: 69
SLUMP: 6.0" Max TRUCKNO: 802 TICKETNO: 1186367
AIR: N/A AIR CONTENT (%): 1.2% UNIT WEIGHT (pcf~: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Column Level 1-2 @ E @ 12, 13, 14, 15&F@ 15
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E ~ 12
REPORT OF TESTS ACCUMULATIVE YARDS:
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AG E LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
1 1 4.75 11/27/1998 7 187010 6610
I 2 4.75 11/27/1998 7 188460 6660
Average 6640
I 3 4.75 12/18/1998 28 223060 7890
1 4 4.75 12/18/1998 28 224470 7940
Average 7920
1 5 4.75 01/I 5/1999 56 235580 8330
Technician: Mike Odom
Report Distribution:
(l) The Beck Group
(I) Gromatzky Dupree & Assoc.
(I) Brockett¢ Davis Drake, Inc.
(1) The Beck Group
Started: 3:00pm Finished: 4:00pm m~Engii~~,Inc.
(1) Thc Beck Group
(1) Dalcan, Inc. Eugene Harbour
Vice President
13.5
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 1
CONCRETE COMP SiVE STRENGTH TEb £
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 11/23/1998 Report No.: 9831744 Report Date
01/21/1999
Client No.: 08644025 Project No.: 43-2333-98
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/23/1998 BATCHTIME: 2:43pm
PLANT: 41 TIME SAMPLED: 3:lSpm BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy
STRENGTH: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 72 F CONCRETE: 78 F
SLUMP: 6.0" Max TRUCKNO: 724 TICKETNO: 1187553
AIR: N/A AIR CONTENT (%): 1 3% UNIT WEIGHT (pqf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Building Area B Column Level 1-2, ~ N-9, N-9.3, M-9.3, J-9.7 & 9.3, K-9.7 & 9.3
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: N-9
REPORT OF TESTS ACCUMULATIVE YARDS: 17.5
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 6.50 11/30/1998 7 149510 5290
! 2 6.50 11/30/1998 7 146620 5190
Average 5240
1 3 6.50 12/21/1998 28 197610 6990
1 4 6.50 12/21/1998 28 195990 6930
Average 6960
1 5 6.50 01 / 18/1999 56 206880 7320
Technician time: See
Technician: Mike Odom
Report Distribution:
(I) The Beck Group
(!) Gromat. zky Duprcc & Assoc.
(1) Brockettc Davis Drake, Inc.
(1) The Beck Group
Report ~9831863
Started:
(1) The Beck Group
(1) Dalcan, luc.
Finished:
m~ Engi~
Eugene Harbour
Vice President
This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I of 1
CONCRETE COMPRESSIVE STRENGTH TEb £
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
11/24/1998
08644025
Report No.: 9831937
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION:
5000 psi @ 28 Days
6.0" Max
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
Column P-9.3 sampled
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
PROJECT DATA
CONCRETE CLASS: N/A
PLACEMENT DATE: 11/24/1998 BATCH TIME: 2:47pm
TIM~SAM~LED: 3:40pm BY: Mike Odom
WEATHER CONDrrIONS: Cloudy
TEMPERATURE (F) - AIR 71 F CONCRETE: 73
TRUCK NO: 48 ! TICKET NO: ! 188867
AIR CONTENT (%): 1.5% UNIT WEIGHT (pcO: N/A
PLACEMENT LOCATION:
Column building area B, Level I-2, N-9.7, 10-P-9.3, 9.7, H-13, M.5-9.3, east elev.
passenger walls, Area B
I 1 6.50
1 2 6.50
1 3 6.50
1 4 6.50
1 5 6.50
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
12/01/1998 7 138420 4900
12/01/1998 7 1367 I0 4830
Average 4870
12/22/1998 28 185470 6560
12/22/1998 28 183100 6480
Average 6520
01/19/1999 56 199700 7060
12.5
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) Thc Beck Group
(I) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: N/A
(1) The Beck Group
(1) Dalcan, Inc.
Finished: N/A
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I of I
CONCRETE COMPR' JSSIVE STRENGTH TEa £
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
11/24/1998
08644025
Report No.: 9831938
Project No.: 43-2333-98
Report Date
01/21/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTm 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
~ METI~OO: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Along Line H, between 14-15
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I 1 4.75
1 2 4.75
12/01/1998
12/01/1998
12/22/1998
12/22/1998
01/19/1999
1 3 4.75
1 4 4.75
1 5 4.75
PROJECT DATA
CONCRETE CLASS: N/A
PLACEME~rr DATE: 11/24/1998 BATCH Tm~: 2:39pm
TIM~ SAMPLED: 3:20pm aY: Mike Odom
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 72 g CONCRETE: 80 F
TRUCK NO: 814 TICKET NO: 1188847
AIR CONTENT (%): 1.4% UNIT WEIGHT (pc/): N/A
PLACEMENT LOCATION:
Grade beam along Line H between 13.5 & 18, along Line 18, between E.3-H
REPORT OF TESTS ACCUVmLATIVE YARDS: 35
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
7 132050 4670
7 135020 4770
Average 4720
28 176410 6240
28 182020 6440
Average 6340
56 193470 6840
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: N/A
(1) The Beck Group
(1) Dalcan, Inc.
Finished: N/A
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
O1LL Page 1 of 1
CONCRETE COMPRL-oSiVE STRENGTH TE '£
8901 Carpenter Frwy., Suite #100
Dallas, Texas 752.47
Date of Service: 12/18/1998
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.:
Project No.:
Project:
9834074 Report Date
01/21/1999
43-2333-98
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C-1064
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A @ 7
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/18/1998 BATCH TIME: l:27pm
TIME SAMPLED: 2:30pm BY: Mike Odom
WEATHER CONDITIONS: Rain
TEMPERATURE (F) - AIR 49 F CONCRETE: 58 F
TRUCK NO: 471 TICKET NO: 1202068
AIR CONTENT (%): 1.9 UNIT WEIGHT (pc.D: N/A
PLACEMENT LOCATION:
Level II-Ill- 13 Columns A, B & C @ 7, N-9, 9.3, M-9, 9.3, A, B @ 8, L-9, 9.3, K-9, K-9.3
REPORT OF TESTS ACCUMULATIVE YARDS: 36
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH .
SET NO. (inches) TESTED (days) (lbs. force) (psi)
I 1 9.00 12/21/1998 3 63980 2260
FRACTURE
TYPE
1 2 9.00 12/25/1998 7 152670 5400
1 3 9.00 01/15/1999 28 191810 6780
1 4 9.00 01/15/1999 28 186860 6610
Average 6700
1 5 9.00 02/12/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 2
'Report No.: 9834074
Note: Raining in pump hopper in mixer trucks at site, all three loads
physically slumped @ 9, 8 1/2 inches.
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: l:00pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 6:00pm
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.