Verizon-LR 990118CONCRETE COMPREe, SIVE STRENGTH TES'
8.901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
11/18/1998
08644025
Report No.: 9831290
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 5.5"
AIR: MA
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Column L/9.7
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
I 1 TOO
1 2 7.00
1 3 7.00
1 4 7.00
1 5 7.00
DATE
TESTED
11/25/1998
11/25/1998
12/16/1998
12/16/1998
01/13/1999
PROJECT DATA
CONCRETE CLASS: 9208
PLACEMENT DATE: 11/18/1998 BATCH TIME: 2:02pm
TIME SAMPLED: 3:00pm BY: Del Ratliff
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 724
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Warm cloudy, light wind
73 F CONCRETE: 78
TICKET NO: 1183856
UNIT WEIGHT (pct'): N/A
Column grade level D/5, D/6, L/9.7, L/9.3, L/10, F/12
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
7 149300 5280
7 148410 5250
Average 5270
28 180090 6370
28 169790 6000
Average 6190
56 189110 6690
7.50
FRACTURE
TYPE
Technician: Del Ratliff
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 2:00pm
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 4:00pm
I-'~En '
~glne ' .
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEb 1'
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/07/1999
08644025
Report No.: 9901422
Project No.: 43-2333-98
Report Date
01/18/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLtrM?: 6.0" Max
AIR: 3-6%
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/07/1999 BATCH TIME: 3:17am
TIME SAMPLED: 3:55pm BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 451
AIR CONTENT (%): 5.9
PLACEMENT LOCATION:
Paving Bay I & northeast drive,
Bay 4-7
foggy
47 F CONCRETE: 61
TICKET NO: 1208709
UNIT WEIGHT (pcf): N/A
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 590
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
i 1 5.50 01/14/1999 7 106180 3750
1 2 5.50 01/14/1999 7 96170 3400
Average 3580
I 3 5.50 02/04/1999 28
1 4 5.50 02/04/1999 28
FRACTURE
TYPE
1 5 5.50 03/04/1999 56
Sample location: Centerline area Bay 1 between west inside eastern third island
bullnose. Slump taken at truck hopper.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 5
,CONCRETE COMPRESSIVE STRENGTH TES £
ENGINEERING, INC.
.. 8901 Carpenter Frwy., Suite//100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
01/07/1999
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 ' :
Report No.: 9901422
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Report Date
01/18/1999
Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SANEPLE LOCATION:
See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/07/1999 BATCH TIME: 5:08am
TIME SAMPLED: 6:00am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 7 ! 2
AIR CONTENT (%): 5.8
PLACEMENT LOCATION:
See page I
cloudy
47 F CONCRETE: 59 F
TICKET NO: 1208736
UNIT WEIGHT (pc.f): N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 560
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 1 6.50 01/14/1999 7 95660 3380
2 2 6.50 01/14/1999 7 102850 3640
Average 3510
2 3 6.50 02/04/1999 28
2 4 6.50 0210411999 28
2 5 6.50 03/04/1999 56
Sample location: Bay (W) 1/2, 70' (N) from centerline
(N) lane
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 2 of 5
.CONCRETE COMPRESSIVE STRENGTH TES'f
ENGINEERING, INC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/07/1999
Client No.: 08644025
Report No.: 9901422
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONT~CTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECn~ICATION REQUm~MENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8205
Pt. ACEMENT DATE: 01/07/1999 BATCH TIM~: 6:57am
TIME SAMPLED: 8:00am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 451
AIR CONTENT (%): 4.7
PLACEMENT LOCATION:
See page I
Foggy
49 F CONCRETE: 61 F
TICKET NO: 1208709
UNIT WEIGHT (pc.f): N/A
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 560
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 1 6.75 01/14/1999 7 100940 3570
3 2 6.75 01/14/1999 7 107170 3790
Average 3680
3 3 6.75 02/04/1999 28
3 4 6.75 02/04/1999 28
3 5 6.75 03/04/1999 56
Sample location: Centerline area northeast driveway thru centerline of Bay 4.
Slump was taken at truck hopper.
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 5
,CONCRETE COMPRESSIVE STRENGTH TES £
ENGINEERING, INC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/07/1999
08644025
Report No.: 9901422
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PL~Wr: 41
SPECIFICATION REQUIREMENTS
STRENGTU: 4000 psi @ 28 Days
SCtrMm 6.0" Max
Aim 3-6%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Northeast drive @ centerline Bay 6
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SAMPLED: 9:30am
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 715
AIR CONTENT (%): 4.6
PLACEMENT LOCATION:
See page I
8205
01/07/1999 aATCH TrM~: 8:50am
BY: Mike Odom
Foggy
54 F CONCRETE: 64 r
TICKET NO: 1209112
UNIT WEIGHT (pc/): N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 560
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 i 6.00 01/14/1999 7 i 18520 4190
4 2 6.00 01/14/1999 7 114860 4060
Average 4130
4 3 6.00 02/04/1999 28
4 4 6.00 02/0411999 28
4 5 6.00 03/04/1999 56
Slump taken at truck hopper.
This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 5
,CONCRETE COMPRESSIVE STRENGTH TES'I'
ENGINEERING, 1NC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/07/1999
Client No.: 08644025
Report No.: 9901422
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
S~*J~qaT~I: 4000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: 3-6%
TEST M~T~IOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
CONCRETE CLASS: 8205
PLACEMENT DATE: 01/07/1999 BATCh TIME: 10:54am
TIME SAMPLED: 1 l:35am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 420
AIR CONTENT (%): 5.0
PLACEMENT LOCATION:
See page I
Cloudy
56 F CONCRETE: 59 V
TICKET NO: 1209351
UNIT WEIGHT (pc.f): N/A
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 1 6.50 01/14/1999 7 119320
5 2 6.50 01/14/1999 7 113470
Average
5 3 6.50 02/04/1999 28
5 4 6.50 02/04/1999 28
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4220
4010
4120
56O
FRACTURE
TYPE
5 5 6.50 03/04/1999 56
Sample location: East end (NE) driveway inside and between last
centerline Bay 7. Slump was taken at truck hopper.
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(i) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(1) The Beck Group
Started: 2:00am
(1) The Beck Group
(1) Dalcan, Inc.
Finished: 12:00pm
eastern island at
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 5 of 5
CONCRETE
COMPRLoSIVE STRENGTH TEb
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/06/1999
Client No.: 08644025
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9901295
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Report Date
01/18/1999
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- ! 43
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8208
I'LACEMENT DATE: 01/06/1999 BATCH TIME: 2:52pm
TIME SAMPLED: 3:45pm aY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F} - AIR
TRUCK NO: 803
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Fair
38 V CONCRETE: 60 V
TICKET NO: 1207387
UNIT WEIGIIT (pc0: N/A
Level 1I! building slab A-d, 5.7-8, N-J9-10, E-H, 11-13
SAMPLE LOCATION:
A.5 ~ 6.5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
I I 6.25 01/08/1999 2 73660
ACCUMULATIVE YARDS: 550
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
2600
1 2 6.25 01/13/1999 7 161290 5700
1 3 6.25 01/13/1999 7 156890 5550
Average 5630
I 4 6.25 02/03/1999 28
I 5 6.25 02/03/1999 28
1 6 6.25 03/03/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval o£HBC Engineering, Inc.
0ILL Page I of 6
Report No.: 9901295 a~
Note: Ail slumps taken at hopper.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page 2 of 6
CONCRETE COMPRE*SIVE STRENGTH TESf
Date of Service:
Client No.:
01/06/1999
08644025
Report No.: 9901295
Project No.: 43-2333-98
ENGINEERIbl3, INC.
· '8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Report Date
01/18/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi ~ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 01/06/1999 BATCH TIME: 4:36am
TIME SAMPLED: 5:00am BY: Mike Odom
WEATtIER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 711
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
Foggy
37 F CONCRETE: 55 F
TICKETNO: 1207469
UNITWEIGHT(pc~: N/A
SAMPLE LOCATION: Level III ~ Lines C ~ 6
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 6.50 01/08/1999 2 76480
ACCUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
2700
2 2 6.50 0 I/13/1999 7 158550 5610
2 3 6.50 01/13/1999 7 168770 5970
Average 5790
2 4 6.50 02/03/1999 28
2 5 6.50 02/03/1999 28
2 6 6.50 03/03/1999 56
550
FRACTURE
TYPE
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 6
CONCRETE COMPRESSIVE STRENGTH TESf
Date of Service:
Client No.:
01/06/1999
08644025
Report No.: 9901295
Project No.: 43-2333-98
ENGINEERING, INC.
· 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/06/1999 BATCHTIME: 5:52am
PLANT: 41 TIME SAMPLED: 6:15am By: Mike Odom
SPECIFICATION REQUIRElVlENTS WEATHER CONDITIONS: Foggy
STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 34 F CONCRETE: 59 F
SLUMP: 6.0" Max TRUCK NO: 805 TICKET NO: 1207562
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf~: N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: ~ N-9
REPORT OF TESTS ACCUMULATIVE YARDS: 550
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 1 5.25 01/09/1999 3 123560 4370
3 2 5.25 01 / 13/1999 7 165230 5840
3 3 5.25 01/13/1999 7 175830 6220
Average 6030
3 4 5.25 02/03/1999 28
3 5 5.25 02/03/1999 28
3 6 5.25 03/03/1999 56
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 6
CONCRETE COMPRL 4SIVE STRENGTH TEb 1'
ENGINEF_RI]~, ~qC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/06/1999
Client No.: 08644025
Report No.: 9901295
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/06/1999 BATCH TIME: 7:30am
PLANT: 41 TIME SAMPLED: 8:00am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Foggy
STRENGTth 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 37 F CONCRETE: 61 F
SLUMP: 6.0" Max TRUCKNO: 71 ! T1CKETNO: 1207717
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pct'): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Along Line M ~ 9.7
REPORT OF TESTS ACCUMULATIVE YARDS: 540
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AG E LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 1 6.75 01/09/1999 3 102530 3630
4 2 6.75 01/13/1999 7 167960 5940
4 3 6.75 01/13/1999 7 158590 5610
Average 5780
4 4 6.75 02/03/1999 28
4 5 6.75 02/03/1999 28
4 6 6.75 03/03/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 6
CONCRETE COMPRESSIVE STRENGTH TES '
ENGINEF_R~X~, INC.
.-8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
01/06/1999
08644025
Report No.: 9901295
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
co~rRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/06/1999 BATCH TIME: 9:00am
PLANT: 41 TIME SAMPLED: 9:30am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHERCONmTIONS: Foggy
STRENGTH: 5000 psi ~ 28 Days TEMPERATURE {F)- AIR 43 F CONCRETE: 63 F
SLUMP: 6.0" Max TRUCK NO: 715 TICKET NO: 1207930
A~R: N/A Am CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
ASTM C- 172 see page I
ASTM C-39
SAMPLE LOCATION: Along F.5 ~ 12.5
REPORT OF TESTS ACCUMULATIVE YARDS: 540
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 I 6.00 01/09/1999 3 106360 3760
5 2 6.00 01/13/1999 7 188810 6680
5 3 6.00 01/13/1999 7 178660 6320
Average 6500
5 4 6.00 02/03/1999 ' 28
5 5 6.00 02/03/1999 28
5 6 6.00 03/03 / 1999 56
Technician: Mike Odom
Report Distribution:
(I) Thc Beck Group
(1) Gromatzky Dupree & Assoc.
(l) Brockettc Davis Drake, Inc.
(I) The Beck Group
Started: 2:00am
(I) The Beck Group
(1) Dalcan, Inc.
Finished: 10:30am
~ Engin_~.
Eugene Harbour
Vice President
This report is exclusively for tile use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 6 of 6
CONCRETE COMPRESSIVE STRENGTH TESs'
..8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
11/18/1998
08644025
Report No.: 9831363
Project No.: 43-2333-98
Report Date
01/18/1999
Client:
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTh: 4000 psi @ 28 Days
SLUMP: 5.5"
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
10'S of Line 12/G
PROJECT DATA
CONCRETE CLASS: 9508
PLACEMENT DATE: 11/18/1998 BATCH TIME: 2:17pm
TIME SAMPLED: 3:30pm aY: Del Ratliff
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 815
AIR CONTENT (%):
PLACEMENT LOCATION:
Warm partly cloudy light wind
72 F CONCRETE: 77 F
TICKET NO: ! 183873
UNIT WEIGHT (pc0: N
Grade beam on Line E 11.5 to 15.5
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
I I 5.00
1 2 5.00
I 3 5.00
1 4 5.00
1 5 5.00
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
11/25/1998 7 120250 4250
11/25/1998 7 122480 4330
Average 4290
12/16/1998 28 173430 6130
12/16/1998 28 166810 5900
Average 6020
01/13/1999 56 183240 6480
10
FRACTURE
TYPE
Technician time:
Technician: Del Ratliff
Report Distribution:
(!) The Beck Group
(1) Gromatzky Dupree & Assoc.
(I) Brockette Davis Drake, Inc.
(i) The Beck Group
See Report #9831290
Started:
(1) The Beck Group
(1) Dalcan, Inc.
Finished:
Esg~e Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TESt
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Date of Service:
Client No.:
11/19/1998
08644025
Report No.: 9831410
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppeil Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: NA
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: F-13
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 I 6.50
1 2 6.50
1 3 6.50
1 4 6.50
I 5 6.50
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 11/19/1998 BATCHTIME: 2:12pm
TIME SAMPLED: 2:45pm BY: Mike Odom
WEATHER CONDITIONS: Cloudy/breezy
TEMPERATURE (F)-AIR 76 F CONCRETE: 81 F
TRUCKNO: 461 TICK~TNO: 1185026
AIR CONTENT (%): 1.2% UNIT WEIGHT (pc0: N/A
PLACEMENT LOCATION:
Level 1-2 columns ~ Grid Lines E,F, G ~ 11, M-10, F & C ~ 13, 14
REPORT OF TESTS ACCUMULATIVE YARDS:
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH
TESTED (days) (lbs. force) (psi)
11/26/1998 7 158590 5610
11/26/1998 7 155520 5500
Average 5560
12/17/1998 28 178030 6300
12/17/1998 28 173010 6120
Average 6210
01/l 4/1999 56 189090 6690
18.5
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
( l ) Gromatzky Dupree & Assoc.
(l) Brockette Davis Drake, Inc.
(I) The Beck Group
Started: 10:30am
(I) The Beck Group
(1) Dalcan. Inc.
Finished: 4:30pm
Vice President
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page ! ofl
"CONCRETE COMPRESSIVE STRENGTH TESf
ENGINEERING, INC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/17/1998
08644025
Report No.: 9833992
Project No.: 43-2333-98
Report Date
01/18/1999
Client: The Beck Group Project:
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
COm'RACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS
STRENG~m: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Beam G-8 on Line 6 @ B.5
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 I 5.75 12/19/1998
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/17/1998 BATCH T~ME: 2:16am
TtME SAMPLED: 3:25am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 456
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Level l[ bldg slab, Lines 5-10, A-D &
N-K, 9-10, E-H, 11-13
Fair
38 F CONCRETE: 63
TICKET NO: 1199903
UNIT WEIGHT (pc~0: N/A
REPORT OF TESTS ACCUMULATIVE YARDS: 500
MAxi om COMPRESSIVE
AGE LOAD STRENGTH
(days) (lbs. force) (psi)
2 79060 2800
1 2 5.75 12/20/1998 3 114570 4050
1 3 5.75 12/24/1998 7 155880 5510
I 4 5.75 12/24/1998 7 154200 5450
Average 5480
1 5 5.75 01/14/1999 28 194840 6890
1 6 5.75 01 / 14/1999 28 186750 6600
Average 6750
FRACTURE
TYPE
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 10
Report No.: 9833992
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 7 5.75 02/11/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 2 of 10
CONCRETE COMPRE sSIVE STRENGTH TES'f
ENGINEERn~G, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
12/17/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9833992
Project No.: 43-2333-98
Report Date
01/18/1999
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTaACTO~t: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/17/1998 BATCH TIME: 4:33an
PLANT: 41 TIME SAMPLED: 5.' 10am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F)- AIR 37 E CONCRETE: 67
SLtrMP: 6.0" Max T~tUCK NO: 837 TICKET NO: 1199969
AIR: N/A AIR CONTENT (%): 1.6 UNIT WEIGHT (pcp: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See placement location
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A.5 to 6.5
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 1 5.50 12/19/1998 2 75080 2650
2 2 5.50 12/20/1998 3 104040 3680
2 3 5.50 12/24/1998 7 151670 5360
2 4 5.50 12/24/1998 7 146510 5180
Average 5270
2 5 5.50 01/14/1999 28 186400 6590
2 6 5.50 01/14/1999 28 179030 6330
Average 6460
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc.
01LL Page 3 of 10
Report No.: 9833992
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 7 5.50 02/11/1999 56
This report is exclusively for lhe use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 4 of 10
.CONCRETE COMPRESSIVE STRENGTH TES £
ENGINEERING, [NC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
12/17/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9833992
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Report Date
01/18/1999
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/17/1998 BATCIITIME: 5:32am
PLANT: 41 TIME SAMPLED: 6:30am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Fair
STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F)- AIR 37 F CONCRETE: 64 F
SLUMP: 6.0" Max TRUCK NO: 383 TICKET NO: 120008
AIR: N/A AIR CONTENT (%): 1.5 UNIT WEIGHT (pc~: N/A
TEST M~THOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Line C @ 7.8
REPORT OF TESTS AccUMULATIVE YARDS: 500
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
3 1 5.75 12/19/1998 2 75210 2660
FRACTURE
TYPE
3 2 5.75 12/20/1998 3 97200 3440
3 3 5.75 12/24/1998 7 135560 4790
3 4 5.75 ! 2/24/1998 7 136680 4830
Average 4810
3 5 5.75 01 / 14/1999 28 171840 6080
3 6 5.75 01/14/1999 28 161930 5730
Average 5910
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 5 of 10
Report No.: 9833992
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 7 5.75 02/11/1999 56
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
01LL Page 6 of 10
.CONCRETE COMPRESSIVE STRENGTH TES'£
.. 8901 Carpenter Frwy., Suite #100
Dallan, Texas 75247
Date of Service:
Client No.:
Client:
12/17/1998
08644025
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9833992
Project No.: 43-2333-98
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Report Date
01/18/1999
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CO~'RACTOR: BECK
CONCRETE SUPPLIER: TXI
eLA~rr: 41
SPECIFICATION REQUIREMENTS
STRENGTH: 5000 psi @ 28 Days
SLUMP: 6.0" Max
AIR: N/A
TEST METHOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
@ M.5 @ 9.5
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DAT~: 12/17/1998 BATCH TtME: 6:33am
TIME SAMPLE9: 7:30am BY: Mike Odom
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 834
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
Fair
37 F CONCRETE: 66 F
TICKET NO: 1200105
UNIT WEIGHT (pc.f): N/A
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
4 1 5.50
REPORT OF TESTS
DATE AGE LOAD
TESTED (days) (lbs. force)
12/19/1998 2 65350
ACCUMULATIVE YARDS: 500
COMPRESSIVE
STRENGTH
(psi)
2310
FRACTURE
TYPE
4 2 5.50
12/20/1998 3 98240 3470
4 3 5.50
4 4 5.50
4 5 5.50
4 6 5.50
12/24/1998 7 142840
12/24/1998 7 144220
Average
01/14/1999 28 202480
01/14/1999 28 194720
Average
5050
5100
5080
7160
6890
7030
01LL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Page 7 of 10
Report No.: 9833992 I-~
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 7 5.50 02/11/1999 56
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page8 of 10
.CONCRETE COMPRE6SIVE STRENGTH TES £
ENGINEERING, INC.
.. 8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
12/17/1998
08644025
Report No.: 9833992
Project No.: 43-2333-98
Report Date
01/18/1999
Client:
The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Project: GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
CONTRACTOR: BECK
CONCRETE SUPPLIER: TXI
PLANT: 41
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair
STRENGT}I: 5000 psi @ 28 Days TEMPERATUR~ (F)- AIR 45 F CONCRETE: 61
SLtrMP: 6.0" Max TRUCK NO: 642 TICKET NO: 1200268
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
E.5 @ 12 (G-25)
PROJECT DATA
CONCRETE CLASS: 8208
PLACEMENT DATE: 12/17/1998 BATCHTIME: 8:22am
TIME SAMPLED: 8:50am BY: Mike Odom
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 1 5.25 12/19/1998 2 70290 2490
5 2 5.25 12/20/1998 3 86110 3050
5 3 5.25 12/24/1998 7 144740 5120
5 4 5.25 12/24/1998 7 146640 5190
Average 5160
5 5 5.25 01/14/1999 28 189040 6690
5 6 5.25 01/14/1999 28 185340 6550
Average 6620
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 9 of 10
Report No.:
9833992
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
5 7 5.25
DATE
TESTED
02/11/1999
AGE
(days)
56
MAXIMUM
LOAD
(lbs. force)
COMPRESSIVE
STR~.. NGTH
(psi)
FRACTURE
TYPE
Technician: Mike Odom
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1) Brockette Davis Drake, inc.
(1) The Beck Group
Started: 2:00am
(1) The Beck Group
(I) Dalcan, Inc.
Finished: 10:00am
H~ Engineering, Inc.
Eugene Harbour
Vice President
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 10 of 10