Loading...
Coppell Industrial-LR010605 I~1 ~..t. ~" a ~" ri I~i I ri ~" E: I~1 I I--I ~i GEOTECHNICAL AND G F~J I'-1 I I F~ ENVIRONMENTAL CONSULTANTS . CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 84 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-05-01 Addison, Texas 75001 TECHNICIAN: H. Johnson ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number [ Location I Quantity Represented 1 Floor slab at A to B and 8 to 9 10/600 2 Floor slab at B to C and 7 to 8 110/600 3 Floor slab at A to B and 6 to 7 210/600 4 Floor slab at B to C and 5 to 6 310/600 5 Floor slab at A to B and 4 to 5 410/600 6 Floor slab at B to C and 3 to 4 520/600 7 Floor slab at B to C and I to 2 597/600 Design Information Is°urce °f C°ncreteHanson I Mix Identification 9349 J Specified Strength p.s.i. 4000 I Test Results Set J Cylinder J Age@ Tote, Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8687 06-12-01 7 109850 3890 8687 07-03-01 28 138490 4900 8887 07-03-0 ! 28 130700 4630 4770 2 8688 06-12-01 7 105010 3720 8688 07-03-01 28 127020 4500 8688 07-03-01 28 132070 4670 4590 3 8689 06-12-01 7 107520 3800 8689 07-03-01 28 134570 4760 8689 07-03-01 28 138160 4890 4830 4 8690 06-12-01 7 106510 3770 8690 07-03-01 28 126350 4470 8690 07-03-01 28 123250 4360 4420 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · --~L [214] 350 5600 · FAX [214] 350 0019 No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 5 8691 06-12-01 7 109640 3880 8691 07-03-01 28 138040 4890 8691 07-03-01 28 134860 4770 4830 6 8692 06-12-01 7 107270 3800 8692 07-03-01 28 137640 4870 8692 07-03-01 28 132750 4700 4790 6 8693 06-12-01 7 117470 4160 8693 07-03-01 28 140540 4970 8693 07-03-01 28 143120 5070 5020 Cylinder Data Set I Cylinder I Timeof J I Concrete J Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8687 4.50 4:00AM 70 74 N/A 808160 2 8688 5.00 5:20AM 70 78 N/A 808170 3 8689 5,00 6:25AM 73 78 N/A 808180 4 8690 4.50 8:50AM 75 79 N/A 808194 5 8691 5.00 9:50AM 78 80 N/A 808204 6 8692 5.50 11:50AM 83 89 N/A 808215 7 8693 5.00 1:50AM 89 91 N/A 808225 Mail Submitted by: Distribution: (1)Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC, (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KENje (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox GEOTECHNICAL AND ~ G F=:;I t""l LJ F:3 ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 84 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-05-01 Addison, Texas 75001 TECHNICIAN: H. Johnson ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Floor slab at A to B and 8 to 9 10/600 2 Floor slab at B to C and 7 to 8 110/600 3 Floor slab at A to B and 6 to 7 210/600 4 Floor slab at B to C and 5 to 6 310/600 5 Floor slab at A to B and 4 to 5 410/600 I 6 Floor slab at B to C and 3 to 4 520/600 I 7 Floor slab at B to C and 1 to 2 597/600 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. I I Hanson 9349 4000 Test Results No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8687 06-12-01 7 109850 3890 8687 07-03-01 28 8687 07-03-01 28 2 8688 06-12-01 7 105010 3720 8688 07-03-01 28 8688 07-03-01 28 3 8689 06-12-01 7 107520 3800 8689 07-03-01 28 8689 07-03-01 28 4 8690 06-12-01 7 106510 3770 8690 07-03-01 28 8690 07-03-01 28 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · -.EL [214] 250 5600 · F^X [214] 350 0019 Set Cylinder] Age@ Total Load CompressiveI Average No. ID Date Tested Test lbs. I Strength p.s.i. Strength p.s.i. 5 8691 06-12-01 7 109640 3880 8691 07-03-01 28 8691 07-03-01 28 6 8692 06-12-01 7 107270 3800 8692 07-03-01 28 8692 07-03-01 28 6 8693 06-12-01 7 117470 4160 8693 07-03-01 28 8693 07-03-01 28 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8687 4.50 4:00AM 70 74 N/A 808160 2 8688 5.00 5:20AM 70 78 N/A 808170 3 8689 5.00 6:25AM 73 78 N/A 808180 4 8690 4.50 8:50AM 75 79 N/A 808194 5 8691 5.00 9:50AM 78 80 N/A 808204 6 8692 5.50 11:50AM 83 89 N/A 808215 7 8693 5.00 1:50AM 89 91 N/A 808225 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 63 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-05-01 Addison, Texas 75001 TECHNICIAN: F. Thornton ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Pier: M-24 10/10 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Pioneer 9337 3000 Test Results Set Cylinder J Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8698 06-12-01 7 103100 3650 8698 07-03-01 28 136400 4830 8698 07-03-01 28 129340 4580 4710 Cylinder Data SetI Cylinder I Time of I ConcreteI Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8698 4.25 10:40AM 86 91 N/A 640190 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brant Cox 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · -;_ [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND I G F~ r-~ U ~ ENVIRONMENTAL CONSULTANTS , CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 83 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-05-01 Addison, Texas 75001 TECHNICIAN: F. Thornton A'I-TN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Pier: M-24 10/10 Design Information IS°urce °f C°ncretePioneer I Mix Identification 9337 I Specified Strength p.s.i. 3000 I Test Results Set ICylinderI Age@ TotalLoad r CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8698 06-12-01 7 103100 3650 8698 07-03-01 28 8698 07-03-01 28 Cylinder Data Set I Cylinder Time of Concrete Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number 1 8698 4.25 10:40AM 86 91 N/A 640190 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · -~__ [214] 350 5600 · F~X [214] 350 0019 J