Verizon-LR 990113CONCRETE COMPRESSIVE STRENGTH TES' t Date of Service: Client No.: 11/17/1998 08644025 Report No.: 9831222 Project No.: 43-2333-98 ;$901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 01/13/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: D/6.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 5.25 11/24/1998 1 2 5.25 11/24/1998 1 3 5.25 12/15/1998 1 4 5.25 12/15/1998 1 5 5.25 01/12/1999 PROJECT DATA CONCRETE CLASS: 9508 PLACEMENT DATE: 11/17/1998 BATCH TIME: 2:19pm TIME SAMPLED: 3:30pm BY: Mike Shields WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 802 AIR CONTENT (%): N/A PLACEMENT LOCATION: Grade beam, building tt 1, Columns: D Lines; 4.5 to 6.5 Cloudy 66 v CONCRETE: 71 TICKETNO: 1182565 UNITWEIGHT(pc0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 9 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (Ibs.~ree) (psi) 7 144180 5100 7 147290 5210 Average 5160 28 191950 6790 28 193460 6840 Average 6820 56 206120 7290 FRACTURE TYPE Technician time: See Report #9831209 Technician: Mike Shields Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (I) The Beck Group Started: (1} The Beck Group (1) Dalcan, Inc. Finished: Eugene Harbour Vice President This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page Iofl CONCRETE COMPRE: SIVE STRENGTH TES'i '8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 11/17/1998 08644025 Report No.: 9831209 Project No.: 43-2333-98 Report Date 01/13/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/17/1998 BATCH TIME: l:58pm PLANT: 41 TIME SAMPLED: 2:35pm BY: Mike Shields SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 66 F CONCRETE: 72 F SLUMP: 5.0" Max TRUCKNO: 712 TICKETNO: 1182531 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcq: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Elevator pit walls BIdg 1 Lobby; Columns A/8, B/8, K/9, L/9, L/9.3, 1./9.7, L/10, G/12 & ASTM C-172 F/12 ASTM C-39 SAMPLE LOCATION: South wall of elevator pit REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 I 5.00 11/24/1998 7 157080 5560 1 2 5.00 11/24/1998 7 149880 5300 Average 5430 I 3 5.00 12/15/1998 28 197280 6980 1 4 5.00 12/15/1998 28 199820 7070 Average 7030 I 5 5.00 01/12/1999 56 235840 8340 FRACTURE TYPE Locations furnished by contractor. Technician: Mike Shields Report Distribution: (1} The Beck Group (1) Gromatzky Dupree & Assoc. (l) Brockette Davis Drake, Inc. (1) The Beck Group Started: 1:00pm (l) The Beck Group (I) Dalcan, Inc. Finished: 4:00pm ~'ugl~KrHarbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page ! ofl CONCRETE COMPRESSIVE STRENGTH TES]t' ENGINEERING, INC. -8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 12/15/1998 Client No.: 08644025 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9833696 Project No.: 43-2333-98 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Report Date 01/13/1999 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/15/1998 BATCH TIME: 5'02am PLANT: 41 TIME SAMPLED: 6:10am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (E) - AIR 36 F CONCRETE: 55 F SLUMP: 6.0" Max TRUCKNO: 458 TICKET NO: 1197964 AIR: 3-5o//0 AIR CONTENT (%): 4.7 UNIT WEIGHT (pcfl: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving slab-on-grade (parking) #3 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) ! 1 6.75 12/22/1998 7 80910 2860 I 2 6.75 12/22/1998 7 82030 2900 Average 2880 1 3 6.75 01/12/1999 28 144470 5110 1 4 6.75 01/12/1999 28 138240 4890 Average 5000 1 5 6.75 02/09/1999 56 300 FRACTURE TYPE Sample location: 40' North from Building Line 8 & 80' west from centerline weset fire lane. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 0ILL Page I of 3 CONCRETE COMPRLoSIVE STRENGTH TES'. ENGINEERING, INC. .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/15/1998 08644025 Report No.: 9833696 Project No.: 43-2333-98 Report Date 01/13/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max AIR: 3-5% TEST METtIOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/15/1998 aATCH TIME: 6:36am TIME SAMPLED: 7.' 10am aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 470 AIR CONTENT (%): 4.8 PLACEMENT LOCATION: See page I Fair 38 F CONCRETE: 57 F TICKET NO: 1198062 UNIT WEIGHT (pet): N/A REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 I 6.00 12/22/1998 7 98720 3490 2 2 6.00 12/22/1998 7 101010 3570 Average 3530 2 3 6.00 01/12/1999 28 135160 4780 2 4 6.00 01/12/1999 28 144450 5110 Average 4950 2 5 6.00 02/09/1999 56 Sample Location:Directly in Line W/Bldg Line E, 100' west from centerline west fire lane. 300 FRACTURE TYPE This repo~ is exclusively for tim use of the client indicated above and shall ilot be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 3 CONCRETE COMPREoSIVE STRENGTH TESf · 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/15/1998 08644025 Report No.: 9833696 Project No.: 43-2333-98 Report Date 01/13/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 l SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 6.0" Max AIR: 3-5% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/I 5/1998 BATCH TIME: 7:45am TIME SAMPLED: 8:25am aY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 802 AIR CONTENT (%): 4.6 PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 I 6.50 12/22/1998 7 80000 3 2 6.50 12/22/1998 7 75840 Average 3 3 6.50 01/12/1999 28 116760 3 4 6.50 01/12/1999 28 121560 Average Fair 40 F CONCRETE: 58 F TICKET NO: 1198189 UNIT WEIGHT (pc0.: N/A 3 5 6.50 02/09/1999 56 ACCUMULATIVE YARDS: 330 COMPRESSIVE STRENGTH (psi) 2830 2680 2760 4130 4300 4220 FRACTURE TYPE Sample location: Along centerline north side fire lane, 60' (W) fire lane. Ail slumps were taken at hopper. Technician: Mike Odom Report Distribution: (1) The Beck Group (1) Gromatzky Dupm¢ & Assoc. (1) Brockette Davis Drake, Inc. ( 1 ) The Beck Group Started: 5:00am Finished: 9:30am (1) The Beck Group (1) Dalcan, Inc. west of centerline ~ Engine~, Inc. Eugene Harbour Vice President This report is exclusively Ibr the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3 CONCRETE COMPRESSIVE STRENGTH TLS/' Date of Service: 12/15/1998 Client No.: 08644025 Report No.: 9833695 Project No.: 43-2333-98 -~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 01/13/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 4 1 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair to partly cloudy STRENGTH: 3000 psi ~ 28 Days TEMPERATURE (F)- AIR 37 F CONCRETE: 57 SLUMP: 6.0" Max TRUCKNO: 470 TICKETNO: 1197892 AIR: NA AIR CONTENT (%): 1.7 UNIT WEIGHT (per}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C-172 ASTM C-39 SAMPLE LOCATION: G.5~ 16 PROJECT DATA CONCRETE CLASS: 9506 PLACEMENT DATE: 12/15/1998 BATCH TIME: 3:05am TIME SAMPLED: 3:40am BY: Mike Odom East wing building slab on grade (Level !) 15-18, E-H Lines REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 5.75 12/22/1998 7 92410 3270 1 2 5.75 12/22/1998 7 94380 3340 Average 3310 1 3 5.75 01/12/1999 28 141470 5000 1 4 5.75 0 I/12/1999 28 158870 5620 Average 5310 I 5 5.75 02/09/1999 56 170 FRACTURE TYPE 01LL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 2 CONCRETE COMPRL ,SIVE STRENGTH TES .8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/15/1998 08644025 Report No.: 9833695 Project No.: 43-2333-98 Report Date 01/13/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/15/1998 BATCH TIME: 4:12am PLANT: 41 TIME SAMPLe. D: 4:40am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTm 3000 psi ~ 28 Days TEMPERATURE (F) - AIR 38 F CONCRETE: 58 F SLUMP: 6.0" Max TRUCKNO: 474 TICK~TNO: 1197924 AIR: NA AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E.5 ~ 17.5 REPORT OF TESTS ACCUMULATIVE YARDS: CVLINDEa MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 2 I 6.25 12/22/1998 7 92160 3260 2 2 6.25 12/22/1998 7 92390 3270 Average 3270 2 3 6.25 01/12/1999 28 145010 5130 2 4 6.25 01 / 12/1999 28 154910 5480 Average 5310 2 5 6.25 02/09/1999 56 170 FRACTURE TYPE Samples were taken from hopper. Technician: Mike Odom Report Distribution: ( 1 ) The Beck Group ( l ) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. ( 1 ) The Beck Group Started: 2:00am (I) The Beck Group (1) Dalcan, Inc. Finished: 5:00pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2