Loading...
Coppell Industrial-LR010604 GEOTECHNICAL AND G F=J I'-1 I I F~ ENVIRONPIENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 62 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-04-01 Addison, Texas 75001 TECHNICIAN: W. Eberhardt A'Ii'N: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number [ Location I Quantity Represented 1 Piers: M-15, M-16 and M-17. 50/50 Grade beam line 1.1 from N.2 to N.9 and line N.2 from 1.1 to 2 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Hanson 9339 3000 Test Results Set ICylinderI Age@ [TotalLoad I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8570 06-11-01 7 93010 3290 8570 07-02-01 28 103130 3650 8570 07-02-01 28 110340 3910 3930 Cylinder Data Set I Cylinder Time of Concrete Air J Ticket No. J ID Slump Sample Air Temp. Temp. EntrainmentI Number 1 8570 5.50 3:42AM 99 91 N/A 817745 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brant Cox 2424 STUTZ DR. * SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · =AX [214] 350 0019 (~EOTECHNICAL AND ~ R J~J U J~ E NVI ~,O N I"IENTA L CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 82 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 06-04-01 Addison, Texas 75001 TECHNICIAN: W. Eberhardt ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Piers: M-15, M-16 and M-17. 50/50 Grade beam line 1.1 from N.2 to N.9 and line N.2 from 1.1 to 2 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Hanson 9339 3000 Test Results Set J CylinderI Age@ Total Load CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 8570 06-11-01 7 93010 3290 8570 07-02-01 28 8570 07-02-01 28 Cylinder Data Set i Cylinder I Time of Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8570 5.50 3:42AM 99 91 N/A 817745 Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Meinhardt & Quintana/ Keith Atkins Mr. David Meinhardt KEA/je (1) Haynes Whayley Associates, Inc./ Mr. Kent Penrod (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brent Cox I 242.4 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · -=~ [2.14] 350 $600 · =,~x [2.14] 350 0019