Verizon-LR 990112CONCRETE COMPRF- SIVE STRENGTH TE,q.w 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/16/1998 Client No.: 08644025 Report No.: 9831049 Project No.: 43-2333-98 Report Date 01/12/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 5000 psi @ 28 Days SLUMP: 5.0" Max AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Al7 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.50 1 2 5.50 1 3 5.50 1 4 5.50 i 5 5.50 PROJECT DATA CONCRETE CLASS: 8208 PLACEMENT DATE: 11/16/1998 BATCIt TIME: l:52pm TIME SAMPLED: 2:45pm BY: Mike Shields WEATIIER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 669 AIR CONTENT (%): N/A PLACEMENT LOCATION: Columns- Level I: A/7, BF/, C/7, & M/9 Sunny 62 F CONCRETE: 75 F TICKET NO: 1181603 UNIT WEIGIIT (pcf): N/A REPORT OF TESTS ACCUMULATIVE YARDS: 9.5 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (lbs. force) (psi) 11/23/1998 7 128550 4550 11/23/1998 7 128020 4530 Average 4540 12/14/1998 28 177300 6270 12/14/1998 28 175130 6190 Average 6230 01/11/1999 56 204140 7220 FRACTURE TYPE Technician: Mike Shields Report Distribution: (1) The Beck Group (1) Gromatzky Dupree & Assoc. (1) Brockette Davis Drake, Inc. (1) The Beck Group Started: l:00pm (1) The Beck Group (1) Dalcan, Inc. Finished: ~ 3:30pm o Inc. gene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 1 CONCRETE COMPREoSIVE STRENGTH TES'a' ENGINEERING, INC. .18901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/31/1998 08644025 Report No.: 9834157 Project No.: 43-2333-98 Report Date 01/12/1999 Client: The Beck Group Project: Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: 3-6% TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: ! 2/31/1998 BATCH TIME: 4:08pm TIME SAMPLED: 4:45pm BY: Mike Odom WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 834 AIR CONTENT (%): 6.0 PLACEMENT LOCATION: Fair 37 F CONCRETE: 61 F TICKET NO: 1205300 UNIT WEIGHT (pc0: N/A South 1/2 bay 4 & 5 paving quadrant, slab-on-grade of main entrance (Left) drive near Bay I & Bay 3 SAMPLE LOCATION: Bay 5 centerline between islands CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 5.75 01/07/1999 7 I 2 5.75 01/07/1999 7 1 3 5.75 01/28/1999 28 I 4 5.75 01/28/1999 28 REPORT OF TESTS ACCUMULATIVE YARDS: 530 MAXIMUM COMPRESSIVE AG E LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 72340 2560 75080 2650 Average 2610 1 5 5.75 02/25/1999 56 This report is exclusively for tile use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 5 CONCRETE COMPRE SSIVE STRENGTH TEST '$901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/31/1998 08644025 Report No.: 9834157 Project No.: 43-2333-98 Report Date 01/12/1999 Client: The Beck Group Project: At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 GTE Shared Services Coppeli Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/31/1998 BATCHTIME: 5:32am PLANT: 41 TIME SAMPLED: 5:55am RV: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 36 V CONCRETE: 62 F SLUMP: 6.0" Max TRUCK NO: 837 TICKET NO: 1205384 AIR: 3-6°~ AIR CONTENT (%): 4.6 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 See page 1 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 530 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (iuches) TESTED (days) (lbs. force) (psi) 2 1 6.25 01/07/1999 7 76620 2710 2 2 6.25 01/07/I 999 7 82720 2930 Average 2820 2 3 6.25 01/28/1999 28 2 4 6.25 01/28/1999 28 2 5 6.25 02/25/1999 56 Sample location: Bay 4, 20' south at centerline from bay 4 islands. FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 5 .CONCRETE 'COMPRE ;SIVE STRENGTH TES £ ENGINEERII~, INC. .11901 Carpenter FrwL, Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/31/1998 08644025 Report No.: 9834157 Project No.: 43-2333-98 Report Date 01/12/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 36 F CONCRETE: 60 F SLUMP: 6.0" Max TRUCK NO: 807 TICKET NO: 1205466 AIR: 3-6% AIR CONTENT (%): 4.9 UNIT WEIGHT (pc0.: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/31/I 998 BATCH TIME: 6:3 lam TIME SAMPLED: 7:10am BY: MikeOdom SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 530 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 3 I 6.00 01/07/1999 7 68590 2430 3 2 6.00 01/07/1999 7 76610 2710 Average 2570 3 3 6.00 01/28/1999 28 ~ 3 4 6.00 01/28/I 999 28 FRACTURE TYPE 3 5 6.00 02/25/1999 56 Sample location: Bay 5, west centerline, 30' north of (N) fire lane centerline. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 5 CONCRETE COMPREoSIVE STRENGTH TES · 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 12/31/1998 08644025 The Beck Group At-tn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Report No.: 9834157 Project No.: 43-2333-98 Report Date 01/12/1999 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/31/1998 BATCHTIME: 7:45am PLANT: 4 [ TIME SAMPLED: 8:45am nv: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-mR 43 F CONCRETE: 58 F SLUMP: 6.0" Max TRUCKNO: 461 TICKETNO: 1205588 AIR: 3-6% Am CONTENT (%): 4.8 UNIT WEIGHT (pc~: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 see page 1 ASTM C-39 SAMPLE LOCATION: Main entrance (left) driveway REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 4 1 6.50 01/07/1999 7 79020 2790 4 2 6.50 01/07/1999 7 74380 2630 Average 2710 4 3 6.50 01/28/1999 28 4 4 6.50 01/28/1999 28 53O FRACTURE TYPE 4 5 6.50 02/25/1999 56 Note: Slump was taken at hopper. This report is exclusively lbr the use of thc client indicated above Hud shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 5 CONCRETE COMPRESSIVE STRENGTH TEST -8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 12/31/1998 08644025 Report No.: 9834157 Project No.: 43-2333-98 Report Date 01/12/1999 Client: The Beck Group Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Project: GTE Shared Services Coppell Road & Corporate Drive Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: BECK CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP: 6.0" Max AIR: 3-6% TEST METItOO: ASTM C- 143 ASTM C~ 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA CONCRETE CLASS: 8205 PLACEMENT DATE: 12/31/1998 BATCH TIME: 9:49am TIME SAMPLED: 10:35am BY: Mike Odom WEATHER CONDITIONS: Fair TEMPERATURE (V)- AIR 45 V CONCRETE: 58 F TRUCK NO: 462 TICKET NO: 1205854 AIR CONTENT (%): 4.5 UNIT WEIGHT {pcf).: N/A PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) 5 1 6.50 01/07/1999 7 5 2 6.50 01/07/1999 7 5 3 6.50 01/28/1999 28 5 4 6.50 01/28/1999 28 5 5 6.50 02/25/1999 56 ACCUMULATIVE YARDS: 560 MAXIMUM COMPRESSIVE LOAD STRENGTH (lbs. force) (psi) 81250 2870 87910 3110 Average 2990 FRACTURE TYPE Sample location: 40'(W)from (E) edge (N) driveway, centerline bay 6. Technician: Mike Odom Report Distribution: ( l ) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Brockett¢ Davis Drake, Inc. (I) The Beck Group Started: 3:00am (1) The Beck Group (I) Dalcan, Inc. Finished: 1 l:00am m~ Eng~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OI LL Page 5 of 5